Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TRANSFORMATION DE L’ÉGLISE SAINT-UBALDE EN CENTRE MULTIFONCTIONNEL

Closed
20148534International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262, as well as associated buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract encompasses a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, upgrading lighting controls, and replacing classroom ceiling fans. The project has a performance period from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days following the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Awardees must provide both payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan, with personnel subject to DHS and FBI background checks for facility access.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades encompass updated HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and a complete replacement of electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price for two primary line items: building renovation and paving removal and replacement. Award requirements include adherence to the Davis-Bacon Act and Buy American compliance. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. Contract administration requires monthly invoicing via Wide Area Work Flow and the submission of a Contractor QC Plan for government acceptance prior to the start of construction. Technical standards include MIL-STD-101 for piping identification and a 20 year no dollar limit warranty for specific roofing components. Quality control will be managed through three phases of control for each definable feature of work, and real property acceptance will be documented using DD Form 1354.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with the National Building Code, NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, evaluated by price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Bidders must be small businesses and hold a valid Massachusetts Contractor's License. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and proof of insurance naming Adams and Associates, Inc. as an additional insured. The contract is subject to the Davis-Bacon Act, requiring adherence to specific local wage determinations and federal paid sick leave mandates. Final acceptance is contingent upon a substantial completion walk-through, a one-year workmanship guarantee, and specific manufacturer warranties, including a 20-year warranty for LVP flooring.
Grafton Job Corps

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, common areas, and mechanical rooms. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, as well as the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide comprehensive documentation, including evidence of relevant experience, a detailed work plan addressing project phasing and occupied-building protection, and itemized pricing broken down by room and trade. Financial requirements include providing payment and performance bonding for the full project value within ten days of award, as well as maintaining general liability insurance of at least one million dollars per occurrence and three million dollars general aggregate. Deliverables include a project schedule, a minimum one-year workmanship warranty, and the successful testing of all restored mechanical, electrical, and life-safety systems. Final acceptance is contingent upon the removal of all debris and the correction of any deficiencies as determined by CSD.
Career Systems Development Corporation

POSTED

about 7 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
48070 - Construction Manager as Constructor RFQ
Solicitation # 48070
The New York State Office of General Services (OGS) is seeking a Construction Manager as Constructor (CMaC) for the rehabilitation of adult living units and heating system upgrades at Building 62 of the Buffalo Psychiatric Center. With an estimated budget between 35 million and 40 million dollars, the project focuses on reconfiguring floors five through eight to meet New York State Office of Mental Health adult design guidelines and patient safety standards, specifically addressing ligature risks. The procurement is a two-phase process consisting of an initial RFQ to shortlist qualified firms based on experience, project management approach, and administrative responsiveness, followed by an RFP phase to determine the best-value award. The final contract structure includes a not-to-exceed agreement for pre-construction and a firm fixed-price agreement for the construction phase, with an anticipated award date of May 2027. The selected contractor must provide all labor, materials, and equipment, utilizing a Project Labor Agreement for trade labor and ensuring all work is supervised by New York State licensed professionals. Key requirements include strict adherence to MWBE and SDVOB participation goals, with overall targets of 30% for MWBE and 6% for SDVOB. The contractor is responsible for implementing a comprehensive Quality Control Plan, while OGS maintains Quality Assurance oversight and final acceptance authority. Administrative requirements include detailed monthly invoicing, compliance with prevailing wage laws, and certifications regarding anti-harassment policies and the prohibition of business operations in Russia. Performance and labor materials bonds are required, and key personnel identified in the Statement of Qualifications cannot be replaced without state approval.
NYS OGS Design & Construction - Consultant Procurement

POSTED

about 9 hours ago

DEADLINE

in 28 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Electric City, Washington. The scope of work includes site investigation, obtaining all necessary permits, providing structural engineering, and modifying the reinforced concrete basement wall. Additionally, the contractor must excavate a permanent path of egress and install an ADA-accessible ramp leading to the exterior sidewalk or parking area. Project acceptance is contingent upon the exit being fully operational, meeting all applicable codes, and receiving approval from the Authority Having Jurisdiction. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide safety policies, and submit evidence of required insurance and licensing. Proposals are due by November 20, 2026, and must include a detailed project schedule. The anticipated contract award date is December 4, 2026, with construction completion targeted for March 31, 2027, depending on weather conditions. Final contract terms and payment conditions will be negotiated with the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

La Municipalité de Saint-Ubalde lance un appel d’offres public pour transformer l’église Saint-Ubalde en un centre multifonctionnel destiné à servir la communauté. Les travaux prévoient l’aménagement d’une nouvelle bibliothèque municipale sur la galerie de l’église, la rénovation complète de l’édifice pour répondre aux normes actuelles, incluant la sacristie, et la conversion de la nef en une salle polyvalente dotée d’une cuisine, de vestiaires et d’une salle de toilette publique. Un nouveau vestibule sera construit du côté est de la sacristie pour servir de nouvelle entrée, et un passage couvert sera entièrement rénové avec l’installation d’un appareil élévateur pour garantir l’accessibilité aux personnes en fauteuil roulant. Un ascenseur sera également ajouté pour assurer la mobilité entre les différents niveaux de l’édifice. L’appel d’offres, identifié sous le numéro 20148534, a été publié le 26 mai 2026 avec une date limite de soumission fixée au 2 juillet 2026 à 19 h. Le contrat relève du code NAICS 236220 et est géré par la Municipalité de Saint-Ubalde, située dans la région de Capitale-Nationale au Québec. Le point de contact officiel pour toute information est Bédard July, autorité contractante, joignable par courriel à [email hidden] ou par téléphone au [phone hidden]. Les soumissions doivent être déposées dans le cadre d’un processus d’achat public et les travaux seront réalisés sur le site de l’église à Saint-Ubalde.

General Info

Saint-Ubalde transforms church to multifunctional center with library, elevator, accessibility, submission July 2, 2026.

Place of Performance

Montréal, Capitale-Nationale (Québec), CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipalité de Saint-Ubalde.
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Bédard JulyContracting Authority

Full Description

Show more
La Municipalité de Saint-Ubalde émet un appel d’offres public pour le projet de transformation de l’église Saint-Ubalde en centre multifonctionnel. Les travaux consistent en l’aménagement d’une nouvelle bibliothèque municipale sur la galerie de l’église, l’ajout d’un ascenseur et la mise aux normes complète de l’église incluant la sacristie. Les travaux incluent aussi le réaménagement de la nef en salle multifonctionnelle qui comprend l’ajout d’une cuisine, de vestiaires et d’une salle de toilette publique. Un vestibule (nouvelle entrée) est ajouté du côté est de la sacristie et un réaménagement complet du passage couvert inclus un appareil élévateur pour personnes en fauteuil roulant.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS