Transmission Line Clearance Mitigation Moderate and Low Risk Project Various
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The SFPUC is seeking to implement clearance mitigation measures for the Hetch Hetchy Power System across 11 transmission lines spanning Tuolumne, Mariposa, Stanislaus, San Joaquin, and Alameda counties. The project aims to ensure proper distance between power conductors and the ground at over 100 locations. Available mitigation strategies include limited grading, increasing line tension, replacing insulators or crossarms, raising or replacing towers, installing new mid-span towers, or reconductoring with high-temperature low-sag lines. Construction is scheduled to begin in early 2027 and is expected to last approximately 36 months. Work at individual tower sites will vary from a few days to six weeks depending on the specific solution applied. Operations will occur within a 50-foot perimeter of each tower, with staging for materials and equipment located within existing SFPUC rights-of-way.
General Info
Agency
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
