This Government Contract opportunity from Nebraska was posted on April 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transmission Right-of-Way Vegetation Clearing (Tree & Brush Removal)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
Federal
Wisconsin - East Zone Gravel Pit NNIS Treatment Amendment 2: RFQ for 12363N26Q4152 This is for the Land Management Integrated Resources BPA only
Solicitation # 12363N26Q4152
The USDA Forest Service is issuing a BPA Call Order for NNIS treatment at gravel pit sites in the East Zone of Wisconsin under the Land Management Integrated Resources BPA, which is a nationwide multiple-award contract encompassing professional services, natural resource restoration, engineering, and project management. This procurement is restricted to the 39 pre-approved contractors already on the LMIR BPA, and the call order will be distributed exclusively via email to those listed entities; no public solicitation or proposal submissions are being accepted in response to this notice. The requirement is not set aside for any specific small business classification, though small businesses are preferred. The solicitation number is 12363N26Q4152, with a response deadline of June 15, 2026, and the NAICS code 115310 applies to this work. The procurement is administered by the Stewardship Contracting Branch of the USDA Forest Service, with primary point of contact Chad Bullock and secondary contact Jim Kaminski, both reachable via email. Any contractor wishing to join the LMIR BPA may submit proposals at any time before the BPA’s expiration by contacting the listed email addresses, as the BPA remains open for continuous pre-solicitation inclusion through SAM.gov using solicitation number 12363N23Q4152.
Stewardship Contracting Branch Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

Lincoln Electric System is seeking a subcontractor for a vegetation clearing project focused on the removal of trees, brush, and woody vegetation. The work must be performed within designated 115kV transmission line corridors and must strictly adhere to LES specifications and the provided ROW Clearing Map. This opportunity was posted on April 25, 2025, with a response deadline of May 6, 2025. The project falls under NAICS code 115310, specifically targeting specialized support services for transmission right-of-way maintenance.

General Info

Place of Performance

NE, USA

Set-Aside

NONE

Documents

This scope was carved out of 073-25.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Transmission ROW Clearing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Clearing of trees, brush, and woody vegetation within designated 115kV transmission line corridors in compliance with LES specifications and ROW Clearing Map.

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

NAICS: 335313
New
SLED
Purchase of 115kV Break Switches
Solicitation # 149-26
Lincoln Electric System is soliciting formal bids under solicitation 149-26 for the purchase and delivery of 115kV Vertical Break Switches. The equipment must be furnished FOB to a specified location in Lincoln, Nebraska, and must conform to Technical Specification S-26-24 and Drawing 016105. Key technical requirements include the installation of an arc horn gap interrupting device on each single pole unit and the galvanization of all parts after fabrication. Equipment must be designed and tested according to the latest ANSI/IEEE, IEC, ASME, ASTM, NEMA, and NESC standards, with a required test report provided upon delivery. The contract will be awarded based on the lowest total bid price, the completion date, and the consideration of any noted exceptions. Bidders must guarantee delivery by May 26, 2028, as the delivery timeline is considered an essential element of the contract. To qualify, manufacturers must have at least three years of satisfactory reliability service in outdoor substation use and must have supplied at least 100 identical units within the United States. Payment will be made in full within thirty days following the receipt of equipment and successful compliance testing. Submission requirements include a completed proposal form, detailed equipment descriptions, dimensional drawings, and installation manuals. Bidders must also submit a completed Equal Employment Opportunity Compliance Request Form. All proposals must be submitted through the eBid system by the deadline of November 17, 2026, at 2:00 PM, with a clarification deadline of November 11, 2026.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS