Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transportation and Economic Corridors - Invitation to Bid - TND00 24580 - Twinning - E. of Hwy. 766 to W. of Hwy. 11A kilometre 0.300 to 7.540 (EBL)

Closed
AB-2026-03281International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 010 B1CBA2602088-0
Solicitation # B1CBA2602088-0
Solicitation B1CBA2602088-0, issued by the Georgia Department of Transportation (GADOT), involves the widening and reconstruction of 0.284 miles of SR 124 (Braselton Hwy) at Hamilton Mill Road and Hamilton Mill Parkway in Gwinnett, Georgia. The project scope requires the contractor to provide all machinery, tools, and materials necessary to add an additional lane, with a scheduled completion date of July 31, 2028. Key deliverables include an ITS Project Management Plan, staging and temporary traffic control plans, and as-built plans. The work must adhere to the 2021 Standard Specifications and 2024 Supplemental Specifications, with specific technical requirements for micropiles, asphalt mix designs, and ITS hardware. The contract is subject to various federal and state regulations, including the Davis-Bacon Act for labor standards, the Buy America preference for steel and iron, and the Americans with Disabilities Act (ADA). Compliance with nondiscrimination and equal opportunity laws is mandatory, and contractors must certify they are not debarred or suspended via SAM.gov. While the required Disadvantaged Business Enterprise (DBE) goal is set at 0%, the contract maintains strict inspection and acceptance criteria, with final acceptance contingent upon the receipt and transfer of all warranties to GADOT. Proposals must be submitted using the Proposal Schedule of Items and remain valid for thirty calendar days following the opening date.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours
NAICS: 237310
New
SLED
Call 009 B1CBA2601755-0
Solicitation # B1CBA2601755-0
Solicitation B1CBA2601755-0, issued by the Georgia Department of Transportation (GDOT), is for a construction project in Fulton County involving 3.087 miles of milling and plant mix resurfacing on SR 70, extending from east of the Cedar Branch Creek bridge to east of SR 154. The scope of work includes traffic control, recycled asphalt concrete patching and superpave, tack coat application, asphalt pavement milling, and the installation of white and yellow wet weather thermoplastic traffic stripes and various raised pavement markers. The complete contract is scheduled for completion by July 31, 2027, with a bid opening date of August 21, 2026. The contract is subject to stringent federal and state regulations, including the Davis-Bacon Act for labor standards, 49 CFR Part 26 for Disadvantaged Business Enterprise (DBE) participation, and Title VI of the Civil Rights Act of 1964. Bidders must submit a Request For Eligibility To Bid by noon the day preceding the letting to be eligible. Award eligibility is based on bidder responsibility and responsiveness, with a requirement to submit supporting documentation within three working days following the bid opening. Compliance with these certifications and the submission of weekly certified payrolls are mandatory, as breaches of these stipulations may result in the withholding of progress or final payments.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 012 B1CBA2602578-0
Solicitation # B1CBA2602578-0
The Georgia Department of Transportation (GDOT) is soliciting proposals for project M006688, which involves 4.390 miles of milling, inlay, and plant mix resurfacing on SR 31, extending from the south end of the I-16/SR 404 bridge to SR 26 in Laurens County. The scope of work includes extensive pavement activities such as recycled asphalt concrete patching and Superpave application, as well as the installation of various thermoplastic and reflective pavement markings and raised markers. Additionally, the contract incorporates Intelligent Transportation Systems (ITS) specifications, requiring the delivery of NEMA TS 4 compliant LED display matrices, IP-based CCTV cameras, wireless communication systems, and mobile Environmental Sensor Stations (ESS). The contract is scheduled for completion by July 31, 2027, with a specific 60-calendar day timeframe associated with the completion of paving operations. Compliance with federal and state regulations is mandatory, including the Davis-Bacon Act, the Americans with Disabilities Act, and Georgia's E-Verify requirements. Quality standards are strictly enforced, requiring ISO 9001 or Six Sigma certification and third-party laboratory testing for ITS equipment. Acceptance is contingent upon a field test and a minimum 30-day burn-in period. Bidders must submit eligibility forms to the GDOT Office of Construction Bidding Administration by 12:00 p.m. the day preceding the August 21, 2026, letting date to avoid being rendered non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 6 hours
NAICS: 237310
New
SLED
Call 005 B1CBA2602556-0
Solicitation # B1CBA2602556-0
The Georgia Department of Transportation is soliciting bids for the construction of a roundabout at the intersection of US 41/SR 247 and Anthony Road (CR 5104 and CR 5481) in Bibb County, with a contract completion deadline of March 31, 2029. The project involves comprehensive roadway construction including grading, base and pavement installation with recycled asphalt concrete, curb and gutter placement, storm drainage systems, sanitary sewer and force main modifications, temporary and permanent traffic control, and installation of various traffic control devices including thermoplastic striping and raised pavement markers. Advanced transportation systems are also part of the scope, requiring installation of ESS environmental and pavement sensors, a wireless communications network supporting PtP, PtMP, and repeater configurations, and a sliding gate system with EAG mechanical components. All materials must meet strict specifications, including delivery in labeled 50-pound containers, proper preservation and handling of reinforcement steel, and end-cap protection for cable ends. The project adheres to multiple regulatory standards, including USDA, ASTM, AWWA, ANSI, GDOT Utility Accommodation Policy, and Georgia EPD guidelines, with precise acceptance criteria for micropiles, ride quality, and bridge bearing elevations. Contract compliance is governed by federal and state requirements including Davis-Bacon prevailing wage regulations, Buy America mandates for all permanently installed materials, and strict non-discrimination provisions under Title VI of the Civil Rights Act, ADA, and equal employment opportunity laws. The contractor must submit a 5% proposal guaranty and a state-approved contract bond to ensure work completion and material quality. DBE participation requirements apply if a goal is set, necessitating submission of proposed DBE participants with the bid. Prompt payment clauses mandate that subcontractors be paid within ten calendar days of the prime contractor’s receipt of payment, and all bids must include certifications addressing debarment status, lobbying activity, boycott of Israel prohibitions under Georgia law, non-collusion, and sexual harassment prevention. Payment for materials is tied to e-Ticket documentation, and as-built plans, GPS coordinates, and an ITS Project Management Plan must be submitted within 30 days of installation completion. Bids must be submitted by August 21, 2026, to the Georgia DOT bidding office in Atlanta, and failure to satisfy any certification or regulatory requirement renders a bid non-responsive.
GADOT

POSTED

about 3 hours ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

Tender TND0024580 invites bids for road construction and grading work along the eastern extension of Highway 766 to the western end of Highway 11A, covering kilometers 0.300 to 7.540 on the eastbound lane, as well as street light installation across various locations in the Town of Rocky Mountain House, spanning kilometers 7.300 to 11.450 in the Central Region. The project requires substantial earthwork including 307,500 cubic meters of building removal and demolition, 24,000 cubic meters of common excavation, 50,600 square meters of stabilization geotextile installation, 42,000 square meters of topsoil placement, and 3,780 square meters of erosion control soil covering, alongside secondary cable supply and installation. Additional work involves 68,000 cubic meters of borrow topsoil excavation, 161,600 cubic meters of common and borrow excavation loaded onto trucks, and 5.3 million cubic meter-kilometers of haul distance. The contractor must supply 161,600 cubic meters of borrow excavation. The contract must be completed by November 30, 2026, and all bids must be submitted electronically to trans.tender@gov.ab.ca before 2:01:00 p.m. on May 26, 2026. Proposals must be in English and comply with the Agreement on Government Procurement, with inquiries directed to Hieu Tran, Project Procurement Officer, at hieu.tran@gov.ab.ca.

General Info

Road construction and grading on Highway 766 to 11A with street lights, earthwork, and haulage to be completed by November 30, 2026.

Agency

Government of Canada → Transportation and Economic CorridorsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Transportation and Economic Corridors
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Transportation and Economic Corridors
View Agency Profile
Office AddressN/A
Contacts
Hieu TranContracting Authority

Full Description

Show more
Tender available date: April 24, 2026 Tender closing date: June 2, 2026 Project Inquiries: Hieu Tran, Project Procurement Officer E-mail: hieu.tran@gov.ab.ca TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0024580 Grading and Other Work: 11:12 Twinning - E. of Hwy. 766 to W. of Hwy. 11A kilometre 0.300 to 7.540 (EBL) Street Light Installation and Other Work: 11:10 Various Locations in the Town of Rocky Mountain House kilometre 7.300 to 11.450 Central Region APPROXIMATE QUANTITIES: SCHEDULE A: 1 Total Force Account Extra Work - Removal and Demolition of Buildings 307,500 M3 Common Excavation 24,000 M3 Borrow Excavation 50,600 M2 Stabilization Geotextile - Supply and Install 286,600 M2 Topsoil Placement 42,000 M2 Erosion Control Soil Covering - Supply and Install 3,780 M Secondary Cable - Supply and Install SCHEDULE B: 68,000 M3 Borrow Topsoil Excavation 161,600 M3 Common and/or Borrow Excavation Loaded to Trucks 5,329,100 M3 Km Truck Haul of Common and/or Borrow Excavation SCHEDULE C: 161,600 M3 Borrow Excavation - Contractor Supplied Contract Completion Date: November 30, 2026. This tender is subject to the requirements of the Agreement on Government Procurement (GPA). Tenders shall be submitted in English. The specified Contract Completion Date for this work is November 30, 2026.

More opportunities from Government of Canada → Transportation and Economic Corridors

Same awarding agency

NAICS: 541330
International
Transportation and Economic Corridors - Request for Proposal - CON0026261 - Engineering Consultant Services for YEG Rail Connection Study
Solicitation # AB-2026-05095
Alberta Transportation and Economic Corridors is seeking qualified consultants to conduct a comprehensive study on establishing a rail-based transit connection between Edmonton International Airport (YEG) and the City of Edmonton’s existing LRT and mass transit network, including a potential direct link to downtown Edmonton. This initiative supports Alberta’s rapid population growth and long-term mobility strategy, as outlined in the Passenger Rail Master Plan, which envisions a transformed regional transit network over the next 30 years. The study must evaluate viable rail corridors, assess ridership potential—including impacts from surrounding communities like St. Albert and Spruce Grove—consider infrastructure and regulatory constraints, and develop a phased implementation plan that maximizes public investment efficiency. A detailed stakeholder engagement strategy is required, including public consultations and information sessions to ensure community input shapes the final recommendations. Proposals must be submitted in two separate PDF files under 10 MB each: one detailing the consultant’s qualifications and experience, and the other outlining the fee structure. Submission is due by August 25, 2026, and no reimbursement will be provided for proposal preparation costs. Selection will be based on overall value, not cost alone, with the successful proponent expected to deliver a final comprehensive report to guide future rail development in the Calgary-Edmonton corridor.
Engineering Services

POSTED

22 days ago

DEADLINE

in 3 days
View Details