Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Transportation and Economic Corridors - Invitation to Bid - TND0023186 - Bridge Culvert Liner Installation, Install Smooth Wall Steel Pipe Culvert and Other Work

Active
AB-2026-06409International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Alberta Transportation and Economic Corridors is seeking bids for project TND0023186, which involves the installation of a bridge culvert liner and smooth wall steel pipe culverts at the Sherwood Park Freeway crossing over Gold Bar Creek in Edmonton. The scope of work includes the supply and installation of 138 metres of welded steel pipe, 109 cubic metres of Class S Modified concrete, shoring and boring pit preparation, and comprehensive traffic accommodation. The contractor is responsible for supplying all necessary materials to complete the project by the deadline of March 31, 2027. The tender period opens on September 21, 2026, and closes on October 22, 2026, at 2:01 PM. All submissions must be sent via email to trans.tender@gov.ab.ca. Project inquiries should be directed to Bijhan Chaglani, Manager of Construction Services Procurement. This solicitation is identified by number AB-2026-06409 and is situated within the North Central Region of Alberta.

General Info

Installation of bridge culvert liners and steel pipes at Gold Bar Creek, Edmonton.

Agency

Transportation and Economic CorridorsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTransportation and Economic Corridors
Contacts1 person available
OfficeN/A
Organization / Agency
Transportation and Economic Corridors
View Agency Profile
Office AddressN/A
Contacts
Bijhan ChaglaniManager, Construction Services Procurement

Full Description

Show more
Tender available date: Monday, September 21, 2026. Tender closing date: Thursday, October 22, 2026. Project Inquiries: Bijhan Chaglani, Manager, Construction Services, Procurement, Alberta Transportation and Economic Corridors. E-mail: Bijhan.Chaglani@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0023186 Bridge Culvert Liner Installation, Install Smooth Wall Steel Pipe Culvert and Other Work B.F. 76423 – Carrying Sherwood Park Freeway:02 over Gold Bar Creek within Edmonton NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 38 Metre Shoring and Boring Pit Preparation 138 Metre Welded Steel Pipe - Supply 138 Metre Welded Steel Pipe - Install 109 Cubic Metre Concrete - Class S Modified 1 Lump Sum Culvert Liner – Supply 1 Lump Sum Culvert Liner – Install Contractor to supply all materials. Contract Completion Date: March 31, 2027.
Certificate of Recognition

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
ATP Cycle 6 Improvements Project
Solicitation # 20260922003
The ATP Cycle 6 Improvements Project, solicitation number 20260922003, is a public works contract issued by the City of El Centro, California, Department of Public Works. The project focuses on roadway and intersection enhancements, specifically targeting the installation of new curbs, gutters, sidewalks, and concrete curb ramps. Key project locations include Main Street between Solana Drive and LaBrucherie Road, and State Street at the 14th Street intersection. Major deliverables include the installation of a Rectangular Rapid Flashing Beacon (RRFB), high visibility crosswalks, and general ADA improvements adhering to CalTAS 2025 and ADAAG standards. The contract mandates a 120-calendar day completion timeline, with liquidated damages set at 1,000 dollars per day for delays. Technical requirements specify the use of thermoplastic for traffic striping and a minimum concrete compressive strength of 4,000 psi. All work must comply with the Greenbook, Caltrans Standard Specifications, and the California Manual on Uniform Traffic Control Devices. Payment for traffic control is structured as a lump sum, with 35 percent paid after installation, 35 percent at the second pay request, and the final 30 percent upon completion. Contractors are required to provide performance and payment bonds and maintain all federal and state labor law postings at the project site.
City of El Centro

POSTED

about 15 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Transportation and Economic Corridors

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS