Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 15, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tree Planting at Gull Lake Recreation Area

Awarded
W912ES-16-T-0133Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 1 hour ago

DEADLINE

in about 7 hours

General Info

Contract Value

$8,435

NAICS

561730 - Landscaping Services

Place of Performance

MN

Set-Aside

NONE

Award Issued Date

Documents

3

16-T-0133.pdf

PDF

GullLake__Rec_Map.pdf

PDF

Tree_planting_diagram.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts

Full Description

Show more
SECTION C STATEMENT OF WORK GULL LAKE TREE PROCUREMENT AND PLANTING - GULL LAKE RECREATION AREA C-1. GENERAL. C-1.1. Scope of Work. The work to be performed under this contract consists of furnishing all plant, materials, equipment, supplies, labor and transportation and performing all work as required by the Statement of Work of the contract, in strict accordance with the specifications and drawings, all of which are made part hereof. All work materials and services not expressly called for in the specifications or shown on the drawings but which are necessary for completion of the contract requirements shall be performed and furnished by the Contractor at no increase in cost to the Government. C-1.2. Services and Supplies. The Contractor shall procure and plant trees according to the plans and specifications provided by the Government in this section. The contactor will supply and plant 14 evergreen trees (5-Eastern white pine, 5-Red pines, and 4 White spruce trees), according to the attached diagram. Trees shall be a minimum of 10 feet in height above the root ball. All plant material shall conform to American Standard for Nursery Stock. Plants shall be true to species and variety specified and nursery grown in accordance with good horticultural practices under climatic conditions similar to those in the locality of the project for at least 2 years. They shall have been freshly dug (during the most recent favorable harvest season). Plants shall be trained in development and appearance as to be in good form, compactness, and symmetry. They shall be sound, healthy, vigorous, well branched and densely foliated and free of disease and insect eggs, pupae or larvae. They shall have healthy, well-developed root systems and shall be free from physical damage or other conditions that would prevent thriving growth1. Plant viability will be determined by the Contracting Officer before planting. All planting locations will be staked. Planting shall be completed in such a manner as to not damage existing trees, landscape or other environmental features. The Contractor shall survey and mark utility locations to verify all locations of underground utilities before excavation begins. The Contractor shall be responsible for all costs for utility surveys and markings and damage resulting from neglect or failure to comply with this requirement. The estimated survey area would be 400 feet by 50 feet. The contractor shall warranty each tree for plant viability for one year from the date in which they are planted and shall be responsible for all costs associated with tree replacement if needed. The guarantee does not include vandalism, storm damage, animal damage or mechanical damage unrelated to contractor activities. 1Wisconsin Department of Natural Resources, Forestry Division - Developing Planting Specifications 11/2006. C-1.3. Description and Location. Gull Lake Recreation Area is a Corps of Engineers managed park that includes heavily utilized facilities including a dam, campground, boat ramp, picnic areas, hiking trails, and a beach, etc. It is located adjacent to the City of East Gull Lakes approximately eight miles north of Baxter in Cass County, Minnesota. C-1.4. Damage to Government Buildings, Equipment, and Vegetation. The Contractor shall be responsible for notifying the Lead Ranger of any apparent damage to Government buildings, equipment, public property, vegetation and natural features that are related to the work under this contract. Notification shall be in writing and furnished to the Lead Ranger within 24 hours of each discovery of damage. C-1.5. Safety. All work shall be performed in accordance with the Corps of Engineers Safety and Health Manual, EM-385-1-1. http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf C-2. PERSONNEL. C-2.1. Qualifications. The Contractor shall be responsible for ensuring that all Contractor employees (workers) utilized in performing the work of this contract are qualified for performing the duties to which each is assigned. C-2.2. Superintendent. The Contractor shall act as, or designate and provide a superintendent on site whenever the work specified herein is being performed. The superintendent shall conduct overall management coordination and be the central point of contact with the Government for performance of work under this contract. The superintendent or any individual designated to act for them, shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to administration of this contract. The superintendent shall deal directly with the Lead Ranger for normal day to day administration of the contract provisions. C-3. CONTACT INFORMATION AND SITE VISITS. C-3.1. Contact Information. Contractors are encouraged to inspect the site before quoting. To schedule a site visit contact: Brian Turner US Army Corps of Engineers Gull Lake Recreation Area 10867 East Gull Lake Dr. Brainerd, MN 56401 Telephone: +1 (555) 000-0000 Fax: +1 (555) 000-0000 ATTACHMENTS: Gull Lake Recreation Area Map Tree Planting Diagram

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS