Trench and Pavement Backfilling with Compaction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract involves backfilling trenches and pavement subgrades using approved soils, which must comply with specific compaction levels ranging from 87 to 95 percent. Additionally, the moisture content of the soil must be maintained within a narrow range of 1 to 3 percent above the optimum level to ensure proper compaction and stability. The work takes place in Menlo Park, with the Department of Energy's SLAC National Accelerator Laboratory as the contracting agency. The contract is categorized under NAICS code 238990, indicating specialized trades related to excavation and backfilling. It is a subcontract opportunity posted on June 11, 2026, with responses due by June 19, 2026. The contract emphasizes quality control in soil preparation to meet the strict engineering requirements necessary for trench and pavement integrity in a technical facility environment.
General Info
Agency
NAICS
Place of Performance
Menlo Park, CA, 94025, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
