Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Triturator Drainage Upgrade

Closed
104274State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Bradley Academy Museum Exterior Renovations
Solicitation # ITB-08-2027
The City of Murfreesboro is soliciting sealed bids for the Bradley Academy Museum Exterior Renovations project in Murfreesboro, Tennessee. This stipulated sum contract involves the restoration of the historic museum exterior, specifically focusing on the installation of new insulated aluminum window systems, replacement of limited roofing areas with mechanically-fastened EPDM systems, reconstruction of the main entry concrete stoop and adjacent sidewalks, and the repair of exterior wood trim, cornices, and plaster surfaces. All work must adhere to National Park Service Preservation Brief 21 and The Secretary of the Interior's Standards for Rehabilitation to protect the historic fabric of the building. Bids must be submitted electronically via the OpenGov portal by 2:00 p.m. local time on November 17, 2026. The contract will be awarded to the lowest responsive and responsible bidder. Required submission documents include the formal bid form, a 5% bid security, a drug-free workplace certification, and proof of a Tennessee General Contractor license. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract sum. The project timeline requires substantial completion within 112 calendar days of contract execution, with final completion due 30 days thereafter. Preliminary construction schedules and shop drawings are due within 14 calendar days of execution. Contract administration is managed by Johnson + Bailey Architects P.C., with payments processed using AIA Documents G702 and G703. The contractor is responsible for all construction means, methods, and safety precautions. Final acceptance is contingent upon a written certification of completion by the contractor and a subsequent review and approval by the architect.
Parks and Recreation

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price, with evaluation focused on two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The work must adhere to the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) and requires extensive supporting documentation, including certified payrolls and updated construction schedules.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive upgrades to the exterior enclosure, roof, plumbing, electrical, HVAC, and fire protection systems, as well as the construction of a 400 square foot addition for forklift battery charging. A critical requirement of the project is a two-phase execution strategy that ensures the facility remains operational and mission-capable between phases, necessitating multiple mobilization and demobilization cycles. Phase 1 encompasses the primary design for both phases and initial construction, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract mandates strict adherence to NAVFAC, UFC, and IBC standards, alongside rigorous cybersecurity and environmental compliance, including Puget Sound Clean Air Agency regulations. Performance timelines require work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an optional seismic upgrade component due within 1082 calendar days. Liquidated damages are set at 4,137 dollars per day for the base bid and 280 dollars per day for the option. Proposals must be submitted via the PIEE portal by December 7, 2026, and include a completed schedule of prices and an executed bid bond. Award will be based on the proposal determined to be most advantageous to the government, with payments processed through the Wide Area WorkFlow system.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations. Payment terms are Net 30, and the contractor must name Adams and Associates, Inc. as an additional insured on their automobile liability policy.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Triturator Drainage Upgrade project (CIP No. 104274) is a limited interior renovation of the Triturator building at the San Diego International Airport, encompassing approximately 1,870 gross square feet. The scope of work focuses on modifications to the existing concrete slab-on-grade to facilitate regrading and improved drainage, as well as the installation of new grinder equipment. All activities are strictly confined to the building interior, with no exterior modifications permitted. The estimated project magnitude is 332,320.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on the base bid alone. Qualified bidders must hold CSLB Licenses B, C-8, C-36, or C10 and be registered with the DIR. Submission requirements include a 10 percent bid bond, a statement of financial responsibility, and various certifications. Performance is measured by two key milestones: substantial completion within 180 days and final acceptance and completion within 240 days of the Notice to Proceed, with liquidated damages of 750.00 dollars per day for failure to meet these deadlines. The contractor is responsible for obtaining City of San Diego building and electrical permits and must adhere to the SDCRAA Construction Safety Manual and prevailing wage laws. Technical requirements include the use of Oracle P6 for scheduling and compliance with NFPA 70 for electrical installations.

General Info

Interior drainage renovation and grinder installation at San Diego Airport for 332,320 dollars.

Documents

20
XLSX, High priority: read this first1 page · bid-schedule
High
PDF, High priority: read this first10 pages · specifications
High
PDF, High priority: read this first1 page · statement-of-financial-responsibility
High
PDF, High priority: read this first15 pages · specifications
High
PDF, High priority: read this first44 pages · specifications
High
PDF, High priority: read this first114 pages · specifications
High
PDF, High priority: read this first2 pages · itb
High
PDF, High priority: read this first37 pages · rfb
High
PDF, High priority: read this first191 pages · contract-document
High
PDF, High priority: read this first200 pages · specifications
High
PDF, High priority: read this first37 pages · rfb
High
PDF, High priority: read this first1 page · q-and-a
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority1 page · industry-day
Low
PDF, Low priority3 pages · industry-day
Low
PDF, Low priorityother
Low
PDF, Low priorityq-and-a
Low
PDF, Low priorityspecifications
Low
PDF, Low priority7 pages · q-and-a
Low
PDF, Low priority3 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 27, 2026 to Nov 2, 2026.

Deadline changed

Response deadline changed from Nov 2, 2026 to Nov 9, 2026.

Deadline changed

Response deadline time changed from 9:00 PM UTC to 10:00 PM UTC on Nov 9, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement Department of San Diego County Regional Airport Authority
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The project consists of a limited renovation within the existing Triturator building, encompassing approximately 1,870 gross square feet (GSF) with no change to the existing building square footage. The scope includes modifications to the existing concrete slab-on-grade to accommodate regrading, improved drainage, and installation of the proposed grinder equipment. All work will be confined to the building interior; no exterior modifications or improvements are part of this scope.
Bid Bond: 10.00%

More opportunities from California → Procurement Department of San Diego County Regional Airport Authority

Same awarding agency

NAICS: 524292
New
SLED
Retirement Plan Administrator
Solicitation # 414475FC
The San Diego County Regional Airport Authority is soliciting proposals for a Retirement Plan Administrator to manage its 401(a) Defined Contribution and 457 Deferred Compensation Plans. The selected firm will be responsible for plan administration, record keeping, participant education, communications, and investment-related services. The scope of work requires the contractor to provide the necessary personnel, systems, and expertise to ensure compliance with plan documents, federal tax laws, and state and local regulations. Key deliverables include the establishment of mutually agreed service standards, the maintenance of internal controls for auditing, and the provision of comprehensive data and asset-transfer support upon contract termination. Proposals will be evaluated based on firm strength and experience, the quality of record keeping and data security, and the effectiveness of participant services. The contract includes a base term with an option for two one-year extensions at the discretion of the President/CEO. Administrative requirements include monthly invoicing with detailed task documentation and a notification trigger when 75% of the total compensation is expended. Compliance mandates include adherence to Title VI of the Civil Rights Act, the Occupational Safety and Health Act, and specific cybersecurity best practices from the SPARK Institute. Additionally, the Authority provides preferences for small, veteran-owned, and local businesses, requiring specific certifications for eligibility.
Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541110
New
SLED
Bond and/or Disclosure Counsel Legal Services
Solicitation # 414482FC
The San Diego County Regional Airport Authority is soliciting proposals for bond and disclosure counsel legal services to provide specialized legal and tax advice. The scope of work is divided into two primary areas: bond counsel assistance, which includes advising on the issuance, sale, and delivery of bonds and the creation of escrows for advance refunding, and bond disclosure assistance, which involves preparing and interpreting disclosure documents required by securities and tax laws. The selected firm will be responsible for delivering formal legal opinions, supporting presentations to bond rating agencies and insurance firms, and assisting the General Counsel in related litigation. All services must comply with MSRB and EMMA filing requirements and applicable statutory regulations. Eligible respondents must be law firms with at least ten years of experience providing bond counsel assistance to government entities. The selection process is based on the Authority's judgment of the respondent's ability to meet its goals, with a primary focus on the Counsel Questionnaire Form, interviews, and proposed fees. The contract includes a base term with options for two one-year extensions. Compensation is based on hourly rates for attorneys and paralegals, with reimbursable expenses billed at actual cost. Invoices must be submitted monthly in 1/10th of an hour increments, and the Authority pays undisputed amounts within thirty days of approval. Proposals must be submitted as a single PDF via the Authority's online bid management website by 2:00 pm on December 9, 2026. The submission must include a cover letter, a business organization statement, a declaration of non-collusion, and the completed Counsel Questionnaire Form. The Authority emphasizes opportunities for certified disadvantaged, veteran-owned, and local small businesses. Additionally, the contractor must adhere to strict non-discrimination standards, including Title VI of the Civil Rights Act and Section 504 of the Rehabilitation Act, and maintain all records within San Diego County.
Offices of Lawyers

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS