This Solicitation opportunity from Department Of Defense was posted on September 24, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tulsa ANG Fuel Facility

Closed
W912BV20R0031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

5 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days

General Info

Contract Value

$21,629,141.03

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Tulsa, OK, 74115, USA

Set-Aside

NONE

Award Issued Date

Documents

7

Cover+VOL+2+-+Tulsa+OKANG.pdf

PDF

Site+visit+sign-in+sheet.pdf

PDF

VOL+1_Specs-Tulsa-ConstructFuelFacilities-20200806.pdf

PDF

VOL+2-+RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf

PDF

VOL+3-+RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf

PDF

W912BV20R0031+Amendment+0001.pdf

PDF

W912BV20R0031+Amendment+0002.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 9, 2020 to Sep 28, 2020.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Sep 28, 2020 to Oct 9, 2020.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Tulsa
Contacts2 people available
OfficeTULSA, OK, 74137-4290, USA
Office AddressTULSA, OK, 74137-4290, USA

Full Description

Show more
The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for a Fuel Facility for the OKANG in Tulsa County, Oklahoma. The proposed project will be a competitive, firm-fixed price, design/bid/build contract procured in accordance with FAR 15, Negotiated Procurement using the Lowest Price Technically Acceptable selection process. The Government is seeking qualified, experienced sources capable of performing the following: The scope includes constructing three (3) 50,000 gal (each) welded horizontal steel above-ground fuel storage tanks complete with railings and associated necessary appurtenances, two commercial truck unloading stands with equipment canopies, two re-fueler loading stands with optional equipment canopies, enclosed Electrical Control House and Open Shelter Filter house, Fuel Operations Facility(building) with fuel testing laboratory, Re-fueler Vehicle Parking with cement concrete parking, secondary containment, and R-11 maintenance building. Additionally, the project includes constructing a Military Service Station (MSS) consisting of 8,000 gallons of diesel storage with two dispensing nozzles, 8,000 gallons of Motor Gas (MOGAS) storage with two dispensing nozzles, equipment, optional MSS dispensing area canopy, MSS Control Building, and secondary containment for tanks, offloading and dispensing. Site preparation will include extension of utility systems to site, preparation of site for above listed improvements, local streets and roads to support the above listed improvements, construction of site drainage retention and storm drainage systems; and construction of site security fencing and gates. In accordance with DFAR 236.204, the estimated magnitude of construction for this project is: Between $10,000,000 and $25,000,000. Estimated duration of the project is 545 calendar days. The North American Industry Classification System code for this procurement is 237120 - Oil and Gas Pipeline and Related Structures Construction, which has a small business size standard of $36.5M. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement. TYPE OF SET-ASIDE: This is an Unrestricted procurement.

More opportunities from Department Of Defense → W076 Endist Tulsa

Same awarding agency

NAICS: 237990
New
Federal
Fall River Lake and Dam Damsite Park Lagoon Repair
Solicitation # W912BV26QA095
Solicitation W912BV26QA095 is a total small business set-aside for the repair, reconstruction, and modernization of the Damsite Park wastewater lagoons at Fall River Lake in Fall River, Kansas. Issued by the U.S. Army Corps of Engineers, Tulsa District, the project aims to restore structural integrity and prevent environmental seepage in compliance with USACE and State of Kansas regulations. The scope of work includes wastewater and solids removal, dewatering, earthwork, slope reconstruction to a 3:1 ratio, installation of 60 mil HDPE liners, and perimeter fencing. The project is divided into a primary bid for the northwestern lagoon and an optional bid for the southwestern lagoon, with a total performance period of 180 calendar days from the Notice to Proceed. The resulting contract will be awarded on a firm-fixed-price basis to the responsible offeror determined to be most advantageous based on price and past performance. Key requirements for eligibility include active registration in the System for Award Management and the submission of a National Institute of Standards and Technology score in the Supplier Performance Risk System, without which offerors will be deemed non-responsible. Per Amendment 0004, the solicitation close date is Friday, October 23, 2026, at 14:00 CST, and bidders must provide a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less. All work must strictly adhere to EM 385-1-1 safety standards and Davis-Bacon Act wage determinations.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Federal
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Solicitation # W912BV26RA016
The US Army Corps of Engineers is soliciting proposals for the construction of a new Child Development Center (CDC) at Tinker Air Force Base, Oklahoma, under solicitation W912BV26RA016. This unrestricted, full and open competition project involves the creation of a single-story facility designed to accommodate 228 children from infancy to five years old, along with 80 staff members and visitors. The construction will feature a drilled pier foundation, concrete slab, steel frame, double wythe masonry exterior walls, and a standing seam metal roof. Key interior spaces include nine infant/pre-toddler activity rooms, six toddler activity rooms, three pre-school activity rooms, a commercial kitchen, administrative and support spaces, isolation rooms, lactation rooms, and a tornado storm shelter meeting ICC 550 and FEMA criteria. The project also includes a playground area and a CCTV system. The procurement is being conducted as a firm-fixed price contract using a Best Value Trade-Off method, with a construction magnitude estimated between $50,000,000 and $75,000,000. The design is based on USAF prototype facilities criteria FC 4-740-14F. The estimated period of performance is 732 days after the Notice to Proceed. This project falls under NAICS code 236220 for Commercial and Institutional Building Construction and carries a DPAS rating of DO-C2. Proposals are due by October 30, 2026, at 1500 central time, and must be submitted electronically via PIEE by offerors registered in the System for Award Management.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 24 days
View Details
NAICS: 237990
Federal
Webbers Falls Excitation System Replacements
Solicitation # W912BV26RA029
Solicitation W912BV26RA029 is a Request for Proposal issued by the Department of Defense, specifically the US Army Corps of Engineers Tulsa District, for the design and installation of three excitation systems at the Webbers Falls Powerhouse in Oklahoma. The scope of work includes the demolition of existing equipment and the installation of new full inverting potential source rectifier exciters featuring microprocessor digital controllers and power potential transformers. The project requires the systems to operate in environmental conditions up to 40 degrees Celsius and 95 percent relative humidity. Key deliverables include the equipment, comprehensive O&M data packages, field test reports, personnel training, and duplicate spare parts. The performance period is 300 calendar days from the date of the notice to proceed. Award will be determined using the Lowest-Price, Technically Acceptable process, where the lowest evaluated price is selected among proposals meeting minimum technical standards. To be deemed acceptable, prime contractors must demonstrate experience with at least three similar projects completed within the last five years, with at least one project valued over 2 million dollars. Technical requirements include compliance with NFPA 70 and IEEE C2 standards, the development of a Construction Quality Control Plan, and adherence to MIL-STD-129 for shipment and storage marking. Additionally, the prime contractor must possess a Facility Clearance and ensure personnel complete required Information Assurance and CUI training. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by October 23, 2026.
Other Heavy and Civil Engineering Construction

POSTED

11 days ago

DEADLINE

in 3 days
View Details
NAICS: 237990
Federal
Arcadia Wet Well Rehabilitation
Solicitation # W912BV26RA033
Solicitation W912BV26RA033 is a firm-fixed-price request for proposals issued by the U.S. Army Corps of Engineers, Tulsa District, for the rehabilitation of wet well low flow gates at Arcadia Dam in Oklahoma County, Oklahoma. The project, categorized under NAICS 237990, has an estimated magnitude between $1,000,000 and $5,000,000 with an estimated duration of 500 calendar days. The scope of work includes the fabrication and delivery of two structural steel bulkheads, the removal and disposal of existing gates, and the design, fabrication, and installation of ductile cast iron low flow inlet and low flow gates and appurtenances across both the north and south wet wells. Additionally, the contractor must replace all angle H frames and structural bolts connecting them to the trash rack assembly in both wells. Award will be determined using the Lowest Price Technically Acceptable (LPTA) process, where proposals are evaluated for technical acceptability without trade-offs. Technical requirements include demonstrating past performance on relevant projects exceeding $250,000, providing qualified key personnel (Project Superintendent, CQC System Manager, and SSHO) who are U.S. citizens or documented workers, and submitting a proposed contract duration and summary schedule. Offerors must provide a NIST score in the Supplier Performance Risk System (SPRS) and submit their proposals via the PIEE Solicitation Module by October 26, 2026. The contract is subject to the Davis-Bacon Act, Buy American-Construction Materials requirements, and EM 385-1-1 safety standards.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 6 days
View Details
NAICS: 812910
Federal
Working Dog Services Robert S. Kerr Lock and Dam #15
Solicitation # W912BV27QA001
The U.S. Army Corps of Engineers, Tulsa District, is soliciting quotes for a Firm-Fixed Price contract to provide working dog services at the Robert S. Kerr Lock and Dam 15 in Sallisaw, Oklahoma. This small business set-aside under NAICS 812910 requires the lease of one trained working dog and the provision of three days of onsite handler training for government personnel. The primary objective is to establish a nonlethal wildlife-deterrence capability to discourage cormorants from roosting and loafing on facility structures, thereby reducing fecal accumulation and associated operational and health impacts. The performance period consists of a six-month base period, with monthly leases running from November through April. Quotes are due by 2:00 PM CST on October 29, 2026, with an anticipated award date of November 5, 2026. Submissions must be made via the PIEE Solicitation Module and require an active SAM registration and a mandatory National Institute of Standards and Technology score entered in the Supplier Performance Risk System; failure to provide this score will result in a determination of non-responsibility. Award will be based on the most advantageous offer considering price and past performance. The contractor must also comply with stringent security requirements, including obtaining a Facility Clearance, developing an OPSEC plan, and ensuring personnel complete required security and employment eligibility verifications.
Pet Care (except Veterinary) Services

POSTED

13 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS