Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Tunnel Excavation and Initial Support

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of 974.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

13400 South Mountain View Corridor Sewer Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs trenchless installation of sewer crossings for prime contractors on Jordan Basin Improvement District utility projects. Executes excavation using guided pipe ramming, TBM, or shield mining to install 36-inch diameter steel casing (ASTM A1097/A123). Manages excavation face to prevent settlement of roadways. Requires Utah Registered Professional Engineer for support calculations. Delivers installed steel casing pipes.

Similar Contracts

Same NAICS industry code

More opportunities from Utah

Same awarding agency

NAICS: 238220
New
SLED
DFCM Construction - Prequalified Mechanical Stage II - Utah State Fairpark - Zion AC Replacement - Project #27071370
Solicitation # CS27023
The State of Utah Division of Facilities Construction and Management is soliciting bids for Project 27071370, which involves HVAC upgrades at the Zion Building located at the Utah State Fairpark in Salt Lake City. The primary scope of work includes replacing one of two existing LG heat pumps with a more reliable system, specifically removing and replacing the air handling unit split system, the associated packaged outdoor heat pump unit, and the existing gas fired duct furnace. The project also requires necessary modifications to the mechanical room and louvers. The estimated construction cost is 95,000.00 dollars, and the substantial completion date is set for April 30, 2027. This is a low bid procurement open only to contractors who have successfully completed the Stage I Prequalification process. Bids and bid bonds must be submitted via the U3P portal by November 5, 2026, with subcontractor lists due by November 6, 2026. Award selection is based on the lowest bid from a prequalified contractor. Key requirements include providing a minimum one year manufacturer warranty, engaging an independent test and balance agency, and providing factory authorized training for maintenance personnel. The contractor is responsible for all safety supervision and any damages resulting from leaks in installed equipment. All work must comply with DFCM General Conditions, ADA Accessibility Guidelines, and International Fuel Gas Code standards.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in 24 days
View Details
NAICS: 238220
New
SLED
DFCM Construction - Invitational - Department of Public Service - Ogden DLD Ductless Split and Water Heater Replacement - Project #27075550
Solicitation # CS27022
The State of Utah Division of Facilities Construction and Management is seeking bids for project 27075550 at the Ogden Driver License Division located in Washington Terrace, Utah. This invitational low bid solicitation is restricted to Grimes Mechanical, Ralph Tye and Sons, and Salmon Mechanical. The scope of work includes the demolition and replacement of an IT room ductless split system with a new 2 ton system, including a new roof stand, indoor and outdoor units, and full commissioning. Additionally, the contractor must replace the existing water heater with a smaller tank, relocate the regulating pump for ground-level serviceability, and rebuild the building's pressure reducing valve station. All work must comply with NEC standards, DFCM roof and design requirements, and the State of Utah High Performance Building Standard. The construction budget for this project is 20,000.00 dollars, with a substantial completion date of April 30, 2027. Bids must be submitted via the U3P website by October 29, 2026, at 3:00 PM and must include a bid bond for 5 percent of the bid amount using AIA Document A310-2010 or an equivalent. Subcontractor lists are due by October 30, 2026. The contract will be awarded to the lowest responsive and responsible bidder who complies with State of Utah license laws and certifies that they are not subject to any government debarment or suspension. Project management is led by Eric Stokes, and all procurement communications should be directed to the DFCM Procurement Team.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS