Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

U-01-06 Amendment #2 (HD Ranch Biogas Facility)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

HD Ranch is seeking an amendment to Use Permit U-01-06 to construct and operate a covered anaerobic digester and a biogas conditioning plant at its 621-acre dairy facility located at 7755 Midway Road in Dixon, California. The project, managed by the Solano County Department of Resource Management, involves approximately 191,000 square feet of ground disturbance across 4.4 acres. The development includes the installation of the digester and supporting infrastructure to manage biogas production on-site. The project has undergone an environmental review process under CEQA guidelines, resulting in an Initial Study and a Mitigated Negative Declaration. This determination indicates that potential environmental impacts regarding biological, geological, and cultural resources can be avoided through specific mitigation measures. A public review period was established from September 11 to October 11, 2026, with the intent to adopt the Mitigated Negative Declaration following the submission of public comments.

General Info

HD Ranch seeks permit for anaerobic digester and biogas plant in Dixon, California.

Agency

California Solano County, Resource Management Department of

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Midway & Sikes Road, Dixon, CA, 95620

Set-Aside

NONE

Documents

(4)

U-01-06 Amendment #2 (HD Ranch Biogas Facility) Notice of Completion

PDFamendment

HD Ranch Biogas Facility - SCH Summary Form

PDFother

Solano County Notice of Intent to Adopt a Negative Declaration - HD Ranch

PDFspecial-notice

HD Ranch Biogas Facility - Initial Study and Mitigated Negative Declaration

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Solano County, Resource Management Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Solano County, Resource Management Department of
Office AddressN/A
Contacts
Travis J KrogerSenior Planner

Interested Companies (1)

Show more
4Creeks
Visalia, CA

Full Description

Show more
HD Ranch proposes to amend Use Permit U-01-06 to construct and operate a covered anaerobic digester and supporting infrastructure on-site. and would involve approximately 191,000 square feet (approximately 4.4 acres) of ground disturbance, with the entire project site.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
Design Build Precision Guided Munitions (PGM) Facility Nellis AFB
Solicitation # W912PL26RA022
The U.S. Army Corps of Engineers, Los Angeles District, is soliciting a firm-fixed-price, design-build contract for the construction of a Precision Guided Munitions (PGM) Facility at Nellis Air Force Base, Nevada. This competitive total small business set-aside project, with a magnitude between 10 million and 40 million dollars, involves the design and construction of a 14,685 square foot facility with an optional additional 1,531 square foot maintenance bay. The facility is designed to support the 57th Wing's mission for missile and glide munitions assembly, disassembly, inspection, testing, and repair. Key features include four drive-through work bays, each equipped with a 2-ton overhead bridge crane, a test cell for rocket motors, secure administrative spaces, and comprehensive security infrastructure including IDS, ACS, and CCTV systems. The project must adhere to DoD Unified Facilities Criteria, Nellis and Creech AFB Installation Facility Standards, and ICD/ICS 705 physical security requirements for Special Access Program Facilities. The performance period is 730 calendar days from the Notice to Proceed. Award will be based on a best-value tradeoff process, prioritizing the past performance of the prime construction contractor and the lead design firm, followed by the technical approach, management plan, and proposed schedule. Eligible offerors must be registered in the System for Award Management and meet CMMC Level 1 self-attestation requirements. The scope includes all site preparation, stormwater management, and utility infrastructure. The contractor is required to provide a LEED accredited professional and an independent third-party Special Inspector of Record. Proposals must be submitted electronically in PDF format, divided into a price volume and a technical volume, with a final response deadline of September 14, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
FA8137 Afsc Pzioc

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236210
New
SLED
Mission San Marcos Industrial ParkThe Mission San Marcos Industrial Park project involves the redevelopment of a 10.8-acre site located at 528 East Mission Road in San Marcos, California. The proposal includes the demolition of two existing industrial buildings and the construction of three two-story warehouse buildings totaling approximately 132,810 square feet, which will include ancillary office space, parking, landscaping, and lighting. The project also incorporates frontage improvements along East Mission Road, the relocation of a bus stop, the dedication of an easement for a future bicycle path, and the installation of a public storm drain. No changes to existing land use or zoning designations are proposed. The project is led by the City of San Marcos with Caprock Partners as the applicant. Comprehensive technical evaluations have been conducted to ensure compliance with CEQA and local guidelines, including studies on geology, soils, paleontological resources, and archaeological sensitivity. Environmental assessments have addressed air quality, greenhouse gas emissions, noise, and vibration, resulting in a Mitigated Negative Declaration. Infrastructure analysis confirms that existing water and sewer capacities are sufficient, and transportation studies including VMT and TDM plans have been developed to manage traffic impacts. Additionally, Phase I and II Environmental Site Assessments were performed to identify and manage recognized environmental conditions on the property.
City of San Marcos

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS