Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of State was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U.S EMB Brazil - Maintenance KITCHEN HOOD FIRE SUPPRESSION

Closed
PR15563396Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the contractor to perform comprehensive inspections and maintenance of gas equipment and fire suppression systems in a kitchen environment. Key tasks include disabling and relighting pilots, inspecting for deficiencies, and submitting detailed proposals for repairs, which can only be executed upon authorized approval. The contractor must also verify proper filling and functioning of fire suppressors in tanks, ensure exhaust filters are clean and correctly installed, and maintain all spout flush covers by removing grease buildup and lubricating components as needed. Fusible links are to be replaced semi-annually with identical types and ratings, and system tests must be conducted by simulating automatic triggering with fuse links, followed by rearming and manual testing to confirm system activation and proper fire alarm signaling. Additionally, the contractor is responsible for weighing and refilling gas cartridges to manufacturer specifications, installing inspection labels after each visit, and documenting all activities thoroughly. The contract emphasizes safety, proper system functioning, and adherence to manufacturer procedures, with clear protocols for reporting deficiencies and obtaining necessary approvals for repairs.

General Info

Agency

Department Of State → Embassy Brasilia

NAICS

92216

Place of Performance

BRASILIA, BR-DF, BRA

Set-Aside

NONE

Documents

2

Amerex KP and Ansul 102 Fire Suppression System Inspection SOW - Chancery Kitchen

PDF, High priority: read this firstsow
High

PMSC 62-64 ANSUL 102 - Amerex KP Fire Suppression System Inspection SOW

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → Embassy Brasilia
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → Embassy Brasilia
Office AddressWASHINGTON, DC, 20520, USA
Contacts
Tracy Musacchio
Paulo Figueira

Full Description

Show more
The Contractor shall complete all of the following: Inspect any existing gas equipment under the hood and disable all pilots. Cover all work areas under and around the cooker hood with suitable materials to prevent contamination by grease or debris from the equipment. After the inspection visit is complete, relight the pilots. During the inspection, note any and all deficiencies. The Contractor must submit a written proposal to correct deficiencies. Repairs and/or replacements may be made only upon receipt of a separate authorization signed by the contractor. The exceptions to this are the discharge covers listed in item "j", the fuse links in item "k" below. Only after tripping/saving/locking the release assembly and actuator in accordance with the manufacturer's procedures should the Contractor disconnect all tanks from the distribution piping and remove them for inspection. The Contractor shall remove the adapter/tube assembly from the tank and verify that each tank is filled with the proper fire suppressor as required by the manufacturer's service manual. As necessary, the Contractor shall fill the suppressor to the proper level or replace it with the appropriate suppressant material. If the existing exhaust system has filters, the Contractor will verify that all filters are clean and properly installed. If they are not clean, we are obliged to notify COR immediately. At each inspection visit, the Contractor will inspect all spout flush covers to ensure they are free of cooking grease buildup. Spring clips should rotate freely on old-style metal caps. If newer style caps with "O" rings are installed, the "O" rings inside the caps should be re-lubricated and the caps reinstalled. We will replace any rubber finishes and/or caps older than one (1) year. This does not apply to the new style caps with an "O" ring inside. The Contractor will replace all fusible links on a semi-annual basis. Replacement links must be of the same type and temperature rating as those originally installed. Removed links will be destroyed and left with the COR at the job site. After removing the tank and drive cartridge in accordance with the manufacturer's procedures, the Contractor must trip the system test. The tripping test is performed by using a pair of pliers to cut a fuse link to simulate automatic triggering. The test shall be performed on each fuse wire circuit. In addition, each system must be rearmed and tested through each manual drive station to simulate manual drive. At each inspection visit, and in the presence of the Engineering representative, the Contractor shall validate that a fire alarm signal is received as a result of the Wet Chemical Cooking System tripping. The Contractor must also prove that the unit's energy has been diverted. At each inspection visit, the Contractor must weigh all cartridges that use an expelling gas to ensure that the cartridge has not lost more than 14.17g (1/2 ounce) of its stamped weight or in accordance with the manufacturer's standard. If necessary, the Contractor will fill the cartridge to the stamped weight with the chemical specified by the manufacturer for the system.Upon completion of each system inspection, the Contractor shall install an inspection label on each manual drive station that legibly indicates the following information:

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS