This Solicitation opportunity from Department Of State was posted on August 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
U.S EMB Brazil - Maintenance KITCHEN HOOD FIRE SUPPRESSION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is for the maintenance of kitchen hood fire suppression systems at the U.S. Embassy in Brasilia, Brazil. The scope of work requires the contractor to thoroughly inspect all existing gas equipment under cooker hoods, disable and later relight pilots, and ensure work areas are protected from contamination during the process. Detailed inspections will be conducted, and any deficiencies must be meticulously documented with written proposals for remedial action, subject to further approval except for specified minor components. Essential maintenance tasks include verifying proper installation and cleanliness of exhaust system filters, checking and servicing fire suppressant tanks, and ensuring appropriate chemical levels. The contractor is responsible for replacing rubber finishes, caps, and all fusible links on a semi-annual basis with parts that meet original specifications. The fire suppression system must be tested by simulating automatic and manual activation, with system performance verified to ensure both alarm signaling and energy shut-off. Cartridges using expelling gas are to be weighed and refilled if needed according to manufacturer standards. Each manual drive station must be labeled with inspection details upon completion. The contract underscores strict adherence to manufacturer procedures and immediate reporting of any system deficiencies, ensuring both operational reliability and compliance with safety protocols. The opportunity is posted as active, with a response deadline of September 8, 2025, and further information can be acquired from the points of contact listed in the contract data.
General Info
NAICS
Place of Performance
BRASILIA, BR-DF, BRASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Contractor shall complete all of the following:
-
-
- Inspect any existing gas equipment under the hood and disable all pilots.
-
-
-
- Cover all work areas under and around the cooker hood with suitable materials to prevent contamination by grease or debris from the equipment.
-
-
-
- After the inspection visit is complete, relight the pilots.
-
-
-
- During the inspection, note any and all deficiencies. The Contractor must submit a written proposal to correct deficiencies. Repairs and/or replacements may be made only upon receipt of a separate authorization signed by the contractor. The exceptions to this are the discharge covers listed in item "j", the fuse links in item "k" below.
-
-
-
- Only after tripping/saving/locking the release assembly and actuator in accordance with the manufacturer's procedures should the Contractor disconnect all tanks from the distribution piping and remove them for inspection.
-
-
-
- The Contractor shall remove the adapter/tube assembly from the tank and verify that each tank is filled with the proper fire suppressor as required by the manufacturer's service manual.
-
-
-
- As necessary, the Contractor shall fill the suppressor to the proper level or replace it with the appropriate suppressant material.
-
-
-
- If the existing exhaust system has filters, the Contractor will verify that all filters are clean and properly installed. If they are not clean, we are obliged to notify COR immediately.
-
-
-
- At each inspection visit, the Contractor will inspect all spout flush covers to ensure they are free of cooking grease buildup. Spring clips should rotate freely on old-style metal caps. If newer style caps with "O" rings are installed, the "O" rings inside the caps should be re-lubricated and the caps reinstalled.
-
-
-
- We will replace any rubber finishes and/or caps older than one (1) year. This does not apply to the new style caps with an "O" ring inside.
-
-
-
- The Contractor will replace all fusible links on a semi-annual basis. Replacement links must be of the same type and temperature rating as those originally installed. Removed links will be destroyed and left with the COR at the job site.
-
-
-
- After removing the tank and drive cartridge in accordance with the manufacturer's procedures, the Contractor must trip the system test. The tripping test is performed by using a pair of pliers to cut a fuse link to simulate automatic triggering. The test shall be performed on each fuse wire circuit. In addition, each system must be rearmed and tested through each manual drive station to simulate manual drive.
-
-
-
- At each inspection visit, and in the presence of the Engineering representative, the Contractor shall validate that a fire alarm signal is received as a result of the Wet Chemical Cooking System tripping. The Contractor must also prove that the unit's energy has been diverted.
-
-
-
- At each inspection visit, the Contractor must weigh all cartridges that use an expelling gas to ensure that the cartridge has not lost more than 14.17g (1/2 ounce) of its stamped weight or in accordance with the manufacturer's standard. If necessary, the Contractor will fill the cartridge to the stamped weight with the chemical specified by the manufacturer for the system.Upon completion of each system inspection, the Contractor shall install an inspection label on each manual drive station that legibly indicates the following information:
-
More opportunities from Department Of State → ACQUISITIONS - AQM MOMENTUM
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS