Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Union Pacific Railroad (UPRR) Canyon Subdivision Milepost 248.98 Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Union Pacific Railroad Canyon Subdivision Milepost 248.98 Bridge Replacement Project, located in Plumas County, California, involves replacing an existing 60-foot-long, 72-inch-diameter corrugated metal pipe culvert with a 100-foot-long, 60-inch-diameter smooth steel pipe culvert. The new structure will be installed using horizontal auger boring through the railroad embankment, positioned approximately 6 feet east of and parallel to the existing culvert. The project includes stabilizing the inlet and outlet with riprap and grouting the existing culvert for abandonment in place. All activities will be conducted within the existing right-of-way, with materials transported by truck and debris hauled offsite. This project is categorized as exempt from the California Environmental Quality Act review under section 15302. It requires authorization under Section 404 of the Clean Water Act from the U.S. Army Corps of Engineers and Section 401 Water Quality Certification from the California Regional Water Quality Control Board, Central Valley Region, Redding Office. Key administrative contacts include Lynn Coster of the Regional Water Quality Control Board and Stephen Cheney of Union Pacific Railroad. The project is identified by solicitation number 5A32CR00256 and NAICS code 237310.

General Info

Union Pacific replaces a culvert at Milepost 248.98 in Plumas County, California.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Stephen CheneySenior Director Design & Environmental

Full Description

Show more
The Project will replace the existing Canyon Subdivision Milepost 248.98 Bridge, which consists of a 60-foot-long, 72-inch-diameter corrugated metal pipe. The existing structure will be replaced with a 100-foot-long, 60-inch-diameter smooth steel pipe (SSP) culvert that will be horizontally auger bored (jack and bored) through the existing railroad embankment approximately 6 feet east of and parallel to the existing culvert. The proposed culvert will be stabilized at the inlet and the outlet with riprap. Following construction of the replacement culvert, the existing culvert will be grouted and abandoned in place. All work will occur within the existing right-of-way. Bridge materials (for example, culverts) will be transported to the project site by truck. Any materials removed from the existing structure will be hauled offsite.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS