Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on October 6, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Unity Bunkhouse Design

Awarded
AG-05K3-S-11-0046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 6 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The U.S. Department of Agriculture Forest Service requires architectural and engineering services for the renovation of the upper Unity Work Center compound in Unity, Oregon. The project focuses on developing design and construction documents to transform existing infrastructure into a functional seasonal work center and bunkhouse for 20 employees. Key requirements include removing a modular office section, expanding the remaining stick-frame office by approximately 4,000 square feet, and upgrading facilities to meet current building, accessibility, and life safety codes. The scope also encompasses the installation of a kitchen, replacement of an underground heating oil tank, and the integration of energy-efficient upgrades such as solar power and improved insulation. This project is a total small business set-aside procured under the Brooks Act, with a firm fixed price contract anticipated for the selected firm. Applicants must be registered in the Central Contractor Registration database and provide a Standard Form 330 demonstrating professional qualifications, specialized experience in government bunkhouses, and technical competence in sustainable design. Selection is based on a weighted evaluation of qualifications, past performance, management capacity, and geographic knowledge of the region. All work must be performed or supervised by professionals licensed in the State of Oregon.

General Info

Contract Value

$153,105.32

NAICS

541330 - Engineering Services

Place of Performance

USDA Forest Service - Region Six, PORTLAND, OR, 97208, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Gifford Pinchot National Forest
Contacts2 people available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts
Nikki M. LaytonProcurement Technician

Full Description

Show more
PROJECT INFORMATION: The U.S. Department of Agriculture, Forest Service, has a requirement for architectural, engineering, and technical design services for the renovation of the existing upper Unity Work Center compound site. The purpose is to develop concept design documents, preliminary design documents, construction documents, and engineering services during construction. Unity Work Center (USFS) is located in Unity, Oregon (pop. 130), which is approximately 35 air miles southwest of Baker City, Oregon. At one time, three compounds (upper, lower, and middle) had comprised the Forest Service owned administrative site. The use of the site has reduced significantly over the past several years and the Forest has conveyed the lower and middle compounds. However, the Upper Compound will continue to serve as a seasonal work center, and will serve as a base for fire and recreation crews. With a population of 130, the town of Unity (over an hour drive from Baker) does not have available rentals or apartments to offer for housing. The ability to respond to forest fires in this locality depends on recruiting and retaining employees - providing bunkhouse space is a critical factor. Most of the existing Forest Service owned housing was located on the lower and middle compounds. The modifications to the Upper Compound are necessary to fit personnel into the existing residual infrastructure. Many of the facilities on this compound are 1930's and 1960's vintage (and are listed in the National Register of Historic Places), and no longer meet current building, occupancy, and health/safety code requirements. Renovations to existing buildings and construction of a new bunkhouse will help make this compound more functional for current and projected future use. The Forest intends to use funds to provide housing for 20 seasonal employees. The Forest would like to remove the modular portion of the existing office (approximately 1,900 square feet), and remodel/expand the remaining stick-frame office (adding approximately 4,000 square feet) into a 20 person bunkhouse as well as design of all associated site/utilities. A site analysis will need to be completed to determine the technical feasibility of this option, or if there is a more technically sound option that should be pursued. This building must be upgraded to meet accessibility and current building code standards, upgrade life safety (fire safety) systems, provide food preparation facilities (kitchen), remove the underground heating oil tank (HOT) and replace with compliant above ground heating oil tank, and upgrade the restroom facilities. Additionally, this project will include energy and sustainability upgrades such as wall and ceiling insulation, thermal-pane windows, upgraded HVAC system, energy-efficient lighting, and installation of a supplemental solar power system. An evaluation and possible replacement of the siding is a component of this project. The IT (radio, telephone, and data) hub for the site will remain in this building and will have to be designed into the project. The successful A/E shall be responsible for providing all materials, supplies, equipment, transportation, and personnel to provide the required architectural and engineering services and will prepare documents containing alternatives, cost estimates, drawings, calculations and recommendations, as appropriate, for completion of the project work. All work shall be completed by or under the direct supervision of architects and/or engineers licensed in the State of Oregon (as appropriate to the work being performed). CONTRACT INFORMATION: This contract is being procured in accordance with the Brooks Act (P.L. 92-582) as implemented in FAR Subpart 36.6. A single firm will be selected for negotiation based on demonstrated competence and qualifications for the required work. The Government anticipates award of a firm fixed price contract for the services described in this synopsis. This project is advertised as a total small business set-aside. Submittals from firms who do not meet the small business requirement will not be considered. The NAICS Code for this project is 541330 and the Size Standard is $4.5 million. All interested firms who meet the small business size standard and choose to submit a Standard Form 330 will be considered. In accordance with FAR clause 52.204-7, Central Contractor Registration (APR 2008), all contractors doing business with the federal government must be registered in the Central Contractor Registration (CCR) database prior to any award. SUBMISSION REQUIREMENTS: Interested parties shall submit the following: One (1) original and one (1) copy of SF 330 for the prime offeror (which also includes a completed Part II for the firm and key sub-consultants) addressing in detail the following selection criteria information. 1. Professional Qualifications: (25%) Professional qualifications necessary for satisfactory performance of required services. Submission requirements: a. Provide brief resumes of proposed team members who will specifically serve as the Project Manager and Designers of Record (Architect, Mechanical Engineer, Electrical Engineer, Landscape Architect, Civil Engineer, Surveyor, Fire Protection Engineer, Structural Engineer, Cost Estimators, etc). Each resume shall include a maximum of five (5) specific completed projects that best illustrate the individual team members experience relevant to this contract scope. b. Provide resumes of other relevant team members. 2. Specialized Experience and Technical Competence: (25%) Specialized experience and technical competence in the type of work. Submission Requirement: a. Describe the team's experience in design and construction of government buildings and bunkhouses. Discuss firm's ability to work with Government entities and design standards or similar relevant experience with other entities. b. Describe the team's knowledge of the charrette process; c. Describe the team's experience in sustainable design, including descriptions of waste reduction techniques, energy modeling, life cycle cost analysis, energy efficiency in facilities designed by the team, and use of local/regional materials on construction contracts. 3. Organization & Management (20%) Discussion of the firm's organization and management process. Demonstrated success of the Quality Control (QC) program used by the firm to ensure quality products. Submission Requirement: a. Outline the firm's approach to design, construction, and project management. Document the ability to handle projects with multiple end-users and complex requirements; b. Describe the team's organization. Provide an organization chart that identifies the overall relationship and lines of authority of the proposed team. Include firm names, key personnel and their discipline/specialty. c. Describe the QC program and identify the person primarily responsible for the QC program. Indicate how the prime will ensure quality consistently across the entire team. d. Address the QC processes for checking and verifying plans and specifications for errors, omissions and quality, documenting design decisions, and incorporating and tracking review comments and completion of construction milestones. 4. Past Performance (15%) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. Points of contact provided in other criteria may be contacted. A firm with no record of federal past performance information shall be evaluated neither favorably nor unfavorably. Submission Requirement: a. Provide a detailed narrative of up to ten (10) maximum relevant projects (not ten projects for each firm or consultant), completed within the last five (5) years, that best illustrate overall team experience relevant to this contract scope. List projects that demonstrate the team's experience with projects of similar size and scope to those to be performed under this contract. b. Provide accessible owner points of contact: name, title, address, telephone number, and fax number 5. Capacity (10%) Capacity to accomplish the work in the required time. Submission Requirements: a. Indicate the firm's present workload and the availability of the project team (including sub-consultants/contractors) for the specified contract performance period b. Describe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates 6. Geographic Location (5%) Location in the general geographical area of the projects and knowledge of the locality of the projects. Submission Requirements: a. Describe and illustrate the team's knowledge of design approaches, construction materials, codes/ordinances, costs, remote locations, and other conditions unique to the geographic area related to the contract for which the submittal is being made. ADDITIONAL INFORMATION All information must be included in the SF 330 package. To be eligible for contract award, a firm must be registered in both the Central Contractor Registration Database (http://www.ccr.gov) and the Online Representations and Certifications Application (http://orca.bpn.gov). The firm rated by the Evaluation Board (EB) as the most qualified shall receive the Request for Proposal package with the terms and conditions applicable to any resultant contract. Should the Forest Service and selected contractor be unable to reach an agreement on a fee and contract terms, the negotiations will be terminated and the Forest Service will enter in to negotiations with the next highest ranked firm. Those firms that meet the requirements in this announcement and wish to be considered must submit their Standard Form 330 (1 hard copy and 1 electronic on CD or other appropriate media) per above listed Submission Requirements, to: USDA Forest Service Gifford Pinchot National Forest Attn: Contracting 10600 NE 51st Circle Vancouver, WA 98682 Submissions will be made no later than 3:30 p.m., Pacific Daylight Savings Time, on August 24, 2011. Submittals received after this date and time will not be considered. Firms not providing the required information may be negatively evaluated. Facsimile submittals will not be accepted. E-mail address for inquiries is: contact@example.gov

More opportunities from Department Of Agriculture → Gifford Pinchot National Forest

Same awarding agency

NAICS: 238290
Federal
Johnston Ridge Observatory Backup Generator Repairs Gifford Pinchot National Forest
Solicitation # 1240BD27Q0009
Solicitation 1240BD27Q0009 is a Request for Quotation issued by the USDA Forest Service for a Firm-Fixed Price contract to provide inspection, scheduled maintenance, and system repair for the backup diesel generator system at the Johnston Ridge Observatory in Toutle, Washington. The equipment consists of a Simpower Generator Systems 1000KW, 1250KVA system featuring a Mitsubishi engine and a MagnaMax Synchronous AC Generator. The scope of work includes manufacturer recommended service maintenance up to 3,000 hours for the engine, radiator, exhaust, diesel fuel systems, controller, alternator, and automatic transfer switch, as well as repairs for any existing malfunctions. This acquisition is a Total Small Business Set-Aside under NAICS code 238290. The award will be granted to the offeror with the highest technical rating, provided the price is fair and reasonable and past performance is acceptable. The government will not necessarily select the lowest-priced quote. Qualified offerors must submit three separate attachments containing technical approach, pricing via the provided SF-1449 and Schedule of Items, and past performance documentation. All submissions must be emailed to Jorge Somoza by November 3, 2026, at 2:00 PM PST. Once awarded, the contractor must commence work within 14 calendar days of the notice to proceed and complete all services within 90 days. Compliance with FAR Part 12 for commercial items and SAM registration is required.
Other Building Equipment Contractors

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS