University of Alberta - Request for Proposal - Arc Flash Studies Heating Plant, Central Cooling Plant and Cooling Plant on Campus
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The University of Alberta is seeking proposals from experienced Industrial and Utility Engineering Consultants to conduct Arc Flash Studies for three specific facilities: the Heating Plant, the Central Cooling Plant, and the Cooling Plant on campus. These plants are integrated into the university's 14.4 kV electrical distribution system and include a wide range of equipment operating at various voltage levels, including 14.4 kV, 4.16 kV, 600 V, 208 V, 120 V, and battery banks exceeding 150 VDC. Interested proponents must submit their responses electronically through the designated public portal website by the deadline of October 1, 2026. This solicitation, identified by number AB-2026-06308, is managed by the University of Alberta with Joshua Cunningham serving as the primary point of contact.
General Info
Agency
NAICS
Place of Performance
AB, CANSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from University of Alberta
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
