This Solicitation opportunity from Nevada was posted on March 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNR - (Rebid
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves installing advanced boiler plant controls at three separate boilers, including main controls, sensors, and associated equipment, with a focus on updating and modernizing the boiler systems. The work must be completed in phases, starting with Boiler #2, which cannot commence before May 1st and must be finished by June 15th, followed by Boilers #3 and #4. All boilers are required to be fully commissioned, tested, and operational by September 12, 2025. The project is classified as a prevailing wage project with an estimated cost between $300,000 and $400,000, and liquidated damages of $500 per day for delays. Bidders must demonstrate experience in programming boiler combustion control systems and adhere to specific insurance requirements, including liability coverage and equipment floaters. The bidding process has transitioned to an electronic-only submission system, with no acceptance of hard copy documents. Bidders can prepare responses in advance using the NGEM system, which allows saving work and uploading documents close to the deadline. Once responses are unsealed, the list of bidders and bid tabulations will be publicly accessible online. The project is scheduled to start on April 16, 2025, with a completion deadline of September 12, 2025. Interested vendors must register with the Nevada System of Higher Education’s new payment system to receive payments, with instructions provided for registration and verification. The solicitation is managed by the University of Nevada, Reno, with Ryan Caddel serving as the primary contact for inquiries.
General Info
Place of Performance
NV, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. The project consists of installing new boiler plant controls at each of the three boilers, main controls, control center controls, including sensors, and any other associated equipment necessary to install up to date boiler controls and plant controls. Special Considerations: All work to be done in phases, such that only 1 boiler may be down at a time. Boiler #2 to be completed first, followed by #3 and then #4. Work on boiler #2 can start no earlier than May 1st and must be completed no later than June 15th. All boilers must be fully commissioned tested and online no later than September 12th, 2025. Contractor must have experience programming boiler combustion control systems. UNR Project#: #25RPR03286 Labor Commissioner #: WA-2025-180 SPWD Project #: Not Required Estimated Cost Range: $300,000 to $400,000 Liquidated Damages: $500/day
Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, and an installation floater to provide coverage for equipment and materials will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "April 16, 2025" and shall be fully complete by "September 12, 2025."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS