This Solicitation opportunity from Nevada was posted on February 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
UNR - Replace Rooftop Make Up Air Units at Sierra Hall and Parking Garage
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the replacement of three rooftop make-up air HVAC units (MAU 2, 7, and 8) at Sierra Hall and the Parking Garage, managed by the University of Nevada, Reno. The project is classified as a prevailing wage project with an estimated cost ranging from $173,000 to $273,000, and it requires crane lifts and roof-top work, with no building permit issued due to the nature of the replacement. The work is scheduled to commence around May 30, 2025, and must be completed by September 5, 2025, with liquidated damages of $500 per day for delays. Bidders must adhere to specific insurance requirements, including general liability, automobile liability, workers' compensation, and equipment coverage, as detailed in the contract templates and risk management guidelines. All bid submissions must be made electronically through the designated website, as BCN Purchasing no longer accepts hard copies. Vendors are required to register with the Nevada System of Higher Education’s new payment system, which only needs to be completed once, to facilitate payment processing. The bidding process allows for early work on responses and document uploads, with responses being unsealed and publicly posted immediately after the deadline on March 20, 2025. The project is managed under solicitation number ITB 9020, with a primary contact named Ryan Caddel, and further details can be accessed through the provided online link.
General Info
Place of Performance
NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
**NSHE recently migrated to a new payment system that requires all of our vendors register with the system in order for our Controllers office to allow us to pay you. Please visit the following link for the NSHE Supplier Registration system to sign up for a new account: https://suppliers.nevada.edu/Membership/Secure/CreateUser.aspx. This process only needs to be completed once. If you believe you already have an account set up please confirm by searching for your company at this link: https://suppliers.nevada.edu/FindSupplier.aspx. If your company is listed and shows the Supplier Status as anything other than “Accepted” then there are still steps that must be completed before your registration is approved.
**Once an ITB/RFP/RFQ/CMAR is released for bidding, bidders may begin working on their response and uploading required documents without submitting their bid early. The NGEM system allows for bidders to save their work. Please make use of this capability in order to give your company enough time to review your response and upload any other documents on the day the ITB/RFP/RFQ/CMAR closes so that you do not miss the cut-off time.
**Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be immediately posted online and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.
Description of Work: This is a prevailing wage project. Replace three roof-top make-up air HVAC units (MAU 2, 7, and 8). UNR Project#: #25MNC03115 Labor Commissioner #: WA-2025-163 SPWD Project #: Not Required Estimated Cost Range: $173,000 to $273,000 Liquidated Damages: $500/day
Special Considerations: Crane lifts and roof-top work required. This project is a like-for-like replacement for faulty roof-top HVAC units. With that, there will not be a building permit issued for the work. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Contractors Equipment (including any equipment for the job), Riggers liability, and an Installation Floater will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 30, 2025" and shall be fully complete by "September 5, 2025."
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
