Charter Communications is planning to upgrade an existing pedestal to a new 24-inch by 36-inch by 18-inch model located in the sidewalk within CALTRANS right-of-way along State Route 1, Pacific Coast Highway, at Post Mile 14.2 in the City of Lomita, Los Angeles County. The work includes excavation to a maximum depth of 18 inches, with an average width of 36 inches and a total length of 24 linear feet, all aimed at accommodating the new pedestal without the need to relocate any public utilities or acquire additional right-of-way. Associated temporary traffic control measures will be implemented to ensure safety and minimal disruption during construction. The project is part of a forecasted initiative under Caltrans District 7, with Mojgan Abbassi listed as the primary point of contact for environmental science matters.

General Info

Charter Communications to upgrade pedestal in Caltrans right-of-way along PCH, Lomita, no utility relocation needed.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Lomita, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSEN ENV SCI (SPEC)

Full Description

Show more
Charter Communications proposes to the upgrade of existing Charter pedestal with a new 24-inch by 36-inch by 18-inch Charter pedestal in sidewalk located within CALTRANS right of way along State Route (SR-)1 – Pacific Coast Highway at Post Mile (PM) 14.2, as well as to perform associated temporary traffic control activities in the City of Lomita Los Angeles County. Excavation will have a maximum depth of 18 inches, an average width of 36 inches, and a length of 24 linear feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS