US 26 at SE67th and SE80th to SE82nd Project

Open
S-73000-00018350State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The US 26 at SE 67th and SE 80th to SE 82nd Project is a construction contract for the Oregon Department of Transportation located in Multnomah County. The scope of work includes the construction of median island extensions and concrete traffic separators, the installation of illumination poles and permanent pavement markings, and various incidental tasks. Key deliverables involve specific materials such as thermoplastic extruded pavement markings, bi-directional yellow pavement markers, and gray HDPE conduit. The project also requires the installation of safety yellow truncated domes on new curb ramp surfaces and adherence to ADA, MUTCD, and TCP Design Manual width requirements. The project is estimated for bonding purposes between $100,000 and $250,000. Performance is scheduled to begin no earlier than March 1, 2027, with substantial completion by September 1, 2027, and final completion by September 15, 2027. Award will be granted to the responsible bidder submitting the lowest responsive bid, calculated via lump sum, unit price, or a combination of both. Bidders must provide a bid security equal to 10% of the total bid and are subject to BOLI prevailing wage rates. Required certifications include tax compliance, non-discrimination, and the implementation of an employee drug testing program.

General Info

ODOT construction project for road improvements in Multnomah County from March-September 2027.

NAICS

N/A

Place of Performance

Portland, OR, 97209, USA

Set-Aside

NONE

Documents

6
XLSX, High priority: read this firstbid-schedule
High
DOCX, High priority: read this firstamendment
High
DOCX, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOCX, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
Contacts2 people available
OfficePortland, OR, 97209, USA
Office AddressPortland, OR, 97209, USA
Contacts
Ivory WilliamsPoint of Contact
Ivory WilliamsPurchaser

Full Description

Show more
The work, includes, but is not limited to: Construct median island extension and concrete traffic separator, install illumination pole and permanent pavement markings, and perform additional and incidental work as called for by the Specifications and Plans.

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238220
New
SLED
ODOT Bldg. A HVAC Controls Replacement
Solicitation # S-73000-00018356
The Oregon Department of Transportation (ODOT) is soliciting quotes for the design and implementation of a like-for-like Direct Digital Control (DDC) system at Building A in Salem, Oregon. The primary objective is to replace outdated American Auto-Matrix controllers with Automated Logic Systems to improve energy efficiency and simplify operational control. The scope includes replacing GPC1 controllers in the boiler room and specific roof top units, ensuring that Building B can operate independently upon completion. To avoid disrupting building climate control, all work must be performed between 5 PM and 6 AM while maintaining a temperature of 70 degrees plus or minus 2.5 degrees. The contract will be awarded to a single responsible offeror based on price, experience, expertise, product functionality, and suitability for the project. Awardees must be certified as an Emerging Small Business via COBID and commit to performing at least 51 percent of the labor using their own workforce. The project is subject to BOLI prevailing wage requirements and strict safety standards, including compliance with federal and Oregon OSHA regulations. Detailed technical requirements include specific labeling for wiring, pneumatic tubing, and control panels, with equipment meeting MIL-STD 810C for shock and vibration. Contract administration involves monthly invoicing by the 10th of each month, with a 5 percent retainage potentially withheld by the owner. Payments are typically issued within 30 calendar days of receiving a conforming invoice. The contractor must provide a detailed work schedule within one month of the award and submit monthly status reports. Substantial completion is defined by 30 continuous days of successful, trouble-free operation, and failure to meet the substantial completion date will result in liquidated damages. Final acceptance requires the submission of all demonstration checklists and written certification from the engineer.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS