Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on April 21, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCG MOTOR LIFEBOAT STATION NOYO RIVER (47271) FY22

Closed
70Z04022QSBPL0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

MD

Set-Aside

SBA

Documents

6

70Z04022QSBPL0019_+Solicitation.pdf

PDF

Additional+Contract+Requirements+%2847271%29.pdf

PDF

Option+Items+70Z04022QSBPL0019+47271.pdf

PDF

Past+Performance+Questionnaire+47271.pdf

PDF

SPECIFICATION+70Z04022QSBPL0019+47271.pdf

PDF

Submission+Summary+and+Deadlines+70Z04022QSBPL0019+47271.pdf.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 3(00040)
Contacts2 people available
OfficeBALTIMORE, MD, 21226, USA
Office AddressBALTIMORE, MD, 21226, USA

Full Description

Show more
The contractor is to provide all necessary facilities, material, equipment, and personnel to preform dry dock repairs to the USCG MLB STATION NOYO RIVER (47271). This work is to be performed within the continental United States, with a USCG provided transit distance no greater than 350 river (statute) miles from boat's homeport of 9325 S. Harbor Drive, Fort Bragg CA 95437 as determined by the government,: 1. An MLB design limits its use to short transits. The asset and unit are not crewed for continuous steaming and is normally limited to daylight transits. Due to crewing and asset employment standards, 4 days transit is the limit of crew endurance under normal operating conditions. 8 hours of transit per day is the planning factor due to crew fatigue. MLB have a maximum speed of 20 knots, however, environmental factors frequently limit average speed to less than maximum. 2. Foreseeable costs (crew lodging, messing, rental vehicles, fuel, and authorized crew travel in accordance with the Joint Travel Regulations) will be added to the pricing and will be an economic consideration for award. In the event that the vendor providing the quote is OUTSIDE of 350 river (statute) miles as determined by the government: Foreseeable costs (Crane rental, ground transportation to and from the vendor's facility and all applicable insurance) will be added to the pricing and will be an economic consideration for award. Anticipated Period of Performance: Thee USCG SFLC intends on awarding (1) contracts(s) on a firm fixed price basis consisting of an estimated sixty three (62) calendar day period of performance (subject to change at the discretion of the government). USCG DRYDOCK: USCG MLB STATION NOYO RIVER (47271) Period of Performance 1 July 2022 - 1 September 2022.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 3(00040)

Same awarding agency

NAICS: 336611
Federal
Dry-Dock: USCG STA CAPE MAY (45665) FY27 UWB
Solicitation # 70Z04026QSBPL0016
Solicitation 70Z04026QSBPL0016 is a total small business set-aside request for quote for the FY27 drydock repairs and alterations of the USCG STA Cape May (vessel 45665). The project is scheduled for a period of performance from January 6, 2027, to February 4, 2027, with an anticipated award date of November 12, 2026. The scope of work includes 20 specific technical items, such as hull plating inspection, water jet servicing, diesel fuel tank cleaning, general welding, ultrasonic testing, and the preservation of underwater bodies. All work must adhere to Coast Guard Technical Publication 4993 and SFLC standards, requiring an onsite AMPP, QP-1, or NACE certified inspector to ensure quality control for critical-coated surfaces. The government will award a firm-fixed-price contract based on the lowest price technically acceptable approach. Evaluation factors include technical acceptability, price fairness, and a review of past performance from the last two to three years via CPARS or Past Performance Questionnaires. Quotes must be submitted electronically to Regina Elliott-Dougherty by October 28, 2026, and must include a signed SF1449, an Excel-based schedule of supplies and services, and various certifications regarding welding, insurance, and drydock capabilities. Payments will be processed through the Invoice Processing Platform based on the stage of completion, with 10 percent of the total contract price withheld until all deliverables are accepted.
Ship Building and Repairing

POSTED

25 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS