This Solicitation opportunity from Department Of Homeland Security was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
USCG Sector Delaware Bay Shower Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The USCG Sector Delaware Bay is soliciting firm-fixed-price bids for the complete replacement of 15 shower stalls at its facility in Philadelphia, Pennsylvania. The scope of work includes the demolition of existing tile, backer boards, and shower pans, as well as the installation of new prefabricated fiberglass shower pans and matching wall surrounds. Key technical requirements include the installation of at least seven new isolation valves to minimize building water shutdowns and the repair of leaking shower pan drains in the men's locker room. The project must be completed within 90 calendar days from the Notice to Proceed, with work performed Monday through Friday between 0730 and 1500 Eastern Standard Time. This procurement is a total set-aside for small businesses under NAICS code 236220. Award will be based on the lowest price technically acceptable (LPTA) quote, with an emphasis on technical capability. The contractor is responsible for all labor, materials, and equipment, including the legal disposal of debris off-site. Requirements include a one-year warranty on all labor and materials, compliance with the Davis-Bacon Act for prevailing wages, and adherence to the Buy American Act for construction materials. Bidders must provide a bid guarantee and, upon award, performance and payment bonds totaling 100 percent of the original contract price.
General Info
Place of Performance
PA, 19147, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
9/15/2026: Question 1. - The existing building only has (1) valve to turn off the water in the mechanical room. Unfortunately, this will shut down the entire building. Would the USCG consider adding isolation valves to the base bid for the bathroom areas to limit the amount of time the building would be without water?
Answer - Yes, the government would like to have isolation valves added.
Question 2. - If it is considered, how many valves would be added? For all bidders to bid the same way.
Answer - At least 1 per head, that would be 7 total
Question 3. - As per 2.2.3 of the SOW: Install new “Proflo” or equivalent fiberglass shower pans. Shower wall assemblies shall be installed using cementitious backer board and a liquid-applied waterproofing membrane installed. Will the shower walls be tiling walls from the shower pan up, or install a new wall surround to match the new shower pan?
Answer - Install new wall surround to match the new shower pans.
Question 4. - Will the USCG provide us with a staging area for a dumpster and any equipment storage?
Answer - Yes, we have an area where they can park a dumpster, and we have a place for them to stage equiopment.
Question 5. - The existing ADA shower pan is leaking in the Men’s locker room. Is it part of this SOW to investigate and repair any damaged piping or can an allowance for repairs be added to the base bid?
Answer - Yes, it would be par of the SOW. FYI, if it's not leaking from a pipe, it was leaking from the shower pan drain. Bottom side of the drain fixture under the pan is still attached to the pipe so they would have to remove that and install a new drain fixture.
Question 6. - Above the ceiling in 2nd floor men’s locker room, there is a possible leak, please advise that this is NOT part of the base bid or will the responsibility of the general contractor?
Answer - No, this would not be part of the bid.
9/11/2026: Question - At the walk thru it was stated that we are replacing the shower stall same as existing. That is a shower base and fiberglass fabricated walls. Patch in tile around shower as required. The scope of work I interpret as installing new base pan and installing subway ceramic tile on the shower walls from floor to ceiling. Please clarify what is to be provided.
Answer: We want the entire shower replaced including pan and wall. We understand some of the tiles will need to be replaced, so we ask to either replace with direct copy of what is already there or recommend an accent border.
Question - So, the walls and base will be fiberglass to match existing and patch ceramic around the stall. The base and walls are a prefabricated unit that comes in 3 or 4 pieces as a kit. Is that correct? Answer - Yes
8/28/2026: Updates have been made to attachment documents for this solicitation to answer questions posed regarding bid bonds, evaluation criteria and other items. Please review ALL documents as the answers are incorporated into the SOW, Construction RFQ Clauses, and the SF-1442. Further questions should be posed via email to SKCS Sergio Cosby, the listed Contracting Officer's Representative.
The contractor shall provide all personnel, equipment, tools, transportation, supervision and
other items and services necessary to replace 15 showers in their entirety. All details are included in the SOW.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS