This Solicitation opportunity from Department Of Homeland Security was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
USCG Station Bodega Bay Fuel Containment System Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 30462PR260000007 is a firm-fixed-price contract issued by the US Coast Guard Regional Support Team Southwest for fuel containment system repairs at USCG Station Bodega Bay, California. The project is a 100 percent small business set-aside with an estimated magnitude under 25,000 dollars. The primary objective is to mitigate environmental risks by replacing degraded boots and flexible connectors on fuel system containment boxes to restore the system to original design specifications and prevent fuel leaks from entering the surrounding waterway. The contractor must provide all supervision, labor, materials, and equipment to perform the work, which includes developing a site-specific safety plan, isolating fuel lines, installing OEM-compliant materials suitable for marine environments, and conducting a witnessed leak test. Key deliverables include a signed system integrity test report, manufacturer specification sheets, and a minimum one-year warranty on workmanship. Performance must commence within ten days of the notice to proceed, with all submittals due within ten days of award and the entire project completed within 30 days of the start date. Invoicing is to be processed through the Invoice Processing Platform, and final acceptance is contingent upon verification by the Contracting Officer's Representative.
General Info
Place of Performance
Bodega Bay, CA, 94923, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The primary objective of this project is to proactively mitigate an identified environmental risk by replacing the degraded boots and flexible connectors on the fuel system's containment boxes. The successful completion of this work will restore the containment system to its original design specifications, ensuring it can effectively prevent a potential fuel leak from entering the surrounding waterway.
More opportunities from Department Of Homeland Security → Base ALAMEDA(00031)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
