This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC HAMILTON FIRE PUMP REQUEST

Awarded
70Z08525Q0029251Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 16 hours ago

DEADLINE

in 4 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
Solicitation N6817127QN004 is a Request for Quotation issued by NAVSUP Fleet Logistics Center Sigonella, Site Naples, for a Vessel Voyage Repair Availability (VRA) for the USNS T Whitney (LCC 20) in Gaeta, Italy. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, focusing on hull and structural steel repairs, communication and navigation calibration, auxiliary machinery piping and hose hydrostatic testing, HVAC duct repairs, and habitability outfitting. The period of performance is scheduled from December 1, 2026, through December 15, 2026. This is a Firm-Fixed-Price contract that is not set aside for small businesses. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, requiring offerors to be rated as acceptable in technical capability before price evaluation. Key technical requirements include providing proof of an ISO9001 or 14001 Quality Management System, ABS welding certifications for mild carbon steel, and the use of a certified Marine Chemist or Industrial Hygienist for gas free certifications. Amendment 0001 specifically clarifies that costs for asbestos removal and disposal for the fire room LP drain piping repairs must be excluded from initial bids and will instead be handled via Condition Found Reports and Change Orders. Invoicing must be processed electronically through Wide Area Work Flow (WAWF).
Navsup Flc Sigonella Naples Office

POSTED

about 16 hours ago

DEADLINE

in 4 days
NAICS: 336611
New
Federal
PIPE/TUBING
Solicitation # 70Z04027Q60718Y00
The U.S. Coast Guard Surface Forces Logistics Center is seeking quotes for a Firm Fixed Price Purchase Order under solicitation 70Z04027Q60718Y00 for various industrial piping and tubing materials. The requirement includes seven specific items: 4 inch stainless steel 304L seamless pipe, 4 inch rectangular aluminum tubing, 1 inch copper tubing, 2 inch seamless steel pipe, 10 inch carbon steel DOM tubing, 6 inch rectangular 6061-T6 aluminum tubing, and 8.625 inch seamless 321 stainless steel pipe. All items have a requested delivery date of May 17, 2027. This is a total small business set-aside under NAICS code 336611, and the award will be based on best value, considering the ability to provide the complete requirement, adherence to the timeframe, and price. Eligible vendors must have an active SAM.gov registration and submit quotes that include all delivery and freight charges, as shipping is required FOB Destination. Deliveries must be made to the U.S. Coast Guard Yard Baltimore Facilities Management in Maryland, adhering to MIL-STD-2073-1E for packaging and MIL-STD-129R for marking and barcoding. Payments are NET 30 and must be processed through the IPP.gov portal. The solicitation is governed by FAR Part 12 for commercial products and services, including specific clauses regarding telecommunications and video surveillance prohibitions and DEI discrimination.
CG-SEA-C23

POSTED

about 16 hours ago

DEADLINE

in 15 days

General Info

Contract Value

$79,903

NAICS

336611 - Ship Building and Repairing

Place of Performance

North Charleston, SC, 29405, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Fire Pump Renew Statement of Work

DOC, High priority: read this first7 pages · sow
High

RFQ 70Z08525Q0029251 - USCGC HAMILTON Fire Pump Purchase

DOCX, High priority: read this first4 pages · rfq
High

SOW-70Z08525Q0029251 - Fire Pump Renew

DOC, High priority: read this first7 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 21, 2025 to Aug 27, 2025. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more
THE BELOW HAD BEEN UPDATED, PLEASE ALSO SEE ATTACHMENTS. COMBINED SYNOPSIS/SOLICITATION This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08525Q0029251 and is issued as a request for quotations (RFQ). This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a totally small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. All responses from interested vendors must be received on/before 0800 Pacific Time, Augusth 21st, 2025 and will be reviewed by the Government. The United States Coast Guard Surface Force Logistics Center has a requirement for the following: The CTR shall provide parts requested for USCGC HAMILTON a fire Pump Purchase CTR shall provide the following: nt. This work item describes the requirements for the Contractor to renew Fire Pump Assembly listed in Table 1. table 1: Fire pump data EQUIPMENT model number/MANUFACTURER Location Fire Pump No. 5 Assembly (51 Inch X 33 Inch X 27 Inch) Approximate Weight 2450 Lbs. (Figure 2 For Reference) 5 X 4 -10 / Carver Pumps Co. Pump Room #2, (5-70-01-E) 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST\($/UNIT) Y Fire Pump Assembly with Suction Assembly (5X4X10 Pump), Carver Pump Co. and 125 HP, 1760 RPM, 450 Volt AC, Three Phase, 60 Hz, Totally Enclosed Fan Cooled, Manufacturer Reliance Electric Co. 01-561-8775 1 $50,500.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev L, General Arrangements Coast Guard Drawing 418A-WMSL-801-004, Rev B, Booklet of General Plans Coast Guard Drawing 750-WMSL-101-027, Rev -, Equipment Removal Route Drawing NSC3 & Follow (AS3101009) Coast Guard Drawing 750-WMSL-320-041, Rev C, Electrical One Line Diagram (NSC4 - SRD) (ASC320001D) (UNSIGNED) Coast Guard Drawing 750-WMSL-521-047, Rev -, Firemain Diagram NSC4 (ASC521001D) Coast Guard Drawing 750-WMSL-180-012, Rev H, Foundation Arrangement Drawing Design Unit 2110 BKLT No.1 Coast Guard Drawing 750-WMSL-521-26, Rev D, Firemain Unit 3110 (ASC521311-FM) (UNSIGNED) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Coast Guard Technical Publication (TP) 7013, 04-OCT-07, Self-Priming Centrifugal Pumps (Close Coupled) Other References Naval Sea Systems Command (NAVSEA) S0400-AD-URM-010/TUM, 5/23/2007, Tag-Out User's Manual The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): None. Tech Rep. Not applicable. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences): System fluid in the pump and associated piping. Piping. Electrical Cables. Coderdam Required 3.1.5 Work coordination. The Contractor shall perform work in conjunction with the following Work Item: Cofferdam Install 3.1.6 Fire Pump Overboard Connection. Provide diver services and plug the fire pump overboard connection. Provide diver services and remove the plug from the overboard connection upon completion of work. 3.1.6.1 The contractor shall install blank connections to isolate the fire pump from the sea as described below and as required by NAVSEA S0400-AD-URM-010/TUM Navy Tag-Out User's Manual. 3.1.6.2 After installation of the overboard plug, break the fire main on the inboard side of the overboard valve and install a blank flange with gasket on the inboard side of the fire main overboard valve, protecting against flooding through the overboard valve. 3.1.6.3 Remove the blank upon completion of work and prior to removal of the plug in the overboard connection. 3.1.7 Fire pump suction connection. Temporarily close both the port and starboard sea chest suction valves and the fire pump suction from the sea chest. Break the fire pump suction connection on the downstream side of the valve and install a blank flange to allow continued use of the port and starboard sea chests. 3.1.7.1 Upon completion of repairs, temporarily close both the port and starboard sea chest suction valves and the fire pump suction from the sea chest. Remove the blank connection and reassemble the fire pump suction valve flange connections. 3.1.7.2 Fire pump discharge connection. Temporarily install a blank flange and gasket on the fire pump discharge piping flange as soon as the fire pump is disconnected to allow continued operation of the firemain in an emergency. Remove the blank flange and reconnect the fire pump upon completion of repairs. 3.1.7.3 Firemain pump piping connection is shown on the Coast Guard Drawing 750-WMSL-521-026. 3.1.8 Carne and rigging services. The Contractor shall provide crane and rigging services to renew GFP Fire Pump No.2. The Contractor shall provide rigging plan at the arrival conference. 3.1.8.1 If required, the Contractor must provide and install lifting pad eyes for removal and installation of Fire Pumpin accordance with SFLC Std Spec 0740. Remove lifting pad eyes after completion of the work item. 3.1.8.2 Maximum working load for various size pad eye is listed in the Table 2.The following Table 2 lists the maximum working loads for various sized pad eyes. Expected working loads may be considerably less Please see attachments THE BELOW IS THE UPDATED PART: ITEM 1: Fire Pump, Renew Intent. This work item describes the requirements for the Contractor to renew Fire Pump Assembly listed in Table 1. table 1: Fire pump data EQUIPMENT model number/MANUFACTURER Location Fire Pump No. 5 Assembly (51 Inch X 33 Inch X 27 Inch) Approximate Weight 2450 Lbs. (Figure 2 For Reference) 5 X 4 -10 / Carver Pumps Co. Pump Room #2, (5-70-01-E) 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST\($/UNIT) Y Fire Pump Assembly with Suction Assembly (5X4X10 Pump), Carver Pump Co. and 125 HP, 1760 RPM, 450 Volt AC, Three Phase, 60 Hz, Totally Enclosed Fan Cooled, Manufacturer Reliance Electric Co. 01-561-8775 1 $50,500.00 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-004, Rev B, Booklet of General Plans Coast Guard Drawing 750-WMSL-100-36, Rev F, Unit 3110 Structure 1st Platform and below FRS 65-77 (ASC100311-FM) (UNSIGNED) Coast Guard Drawing 750-WMSL-101-027, Rev -, Equipment Removal Route Drawing NSC3 & Follow (AS3101009) Coast Guard Drawing 750-WMSL-180-012, Rev H, Foundation Arrangement Drawing Design Unit 2110 BKLT No.1 Coast Guard Drawing 750-WMSL-180-012, Rev H, Foundation Arrangement Drawing Design Unit 2110 BKLT No.1 Coast Guard Drawing 750-WMSL-320-041, Rev C, Electrical One Line Diagram (NSC4 - SRD) (ASC320001D) (UNSIGNED) Coast Guard Drawing 750-WMSL-521-1, Rev -, Firemain Diagram Coast Guard Drawing 750-WMSL-521-26, Rev D, Firemain Unit 3110 (ASC521311-FM) (UNSIGNED) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Coast Guard Technical Publication (TP) 7013, 04-OCT-07, Self-Priming Centrifugal Pumps (Close Coupled) Other References Naval Sea Systems Command (NAVSEA) S0400-AD-URM-010/TUM, 5/23/2007, Tag-Out User's Manual The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s): None. 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences): System fluid in the pump and associated piping. Piping. Electrical Cables. Cofferdam Required at seachest 3.1.5 Fire Pump isolation. Provide diver services for installation and removal of: Seachest cofferdam Plug on fire pump overboard discharge note Cofferdam at sea chest suction and plug on overboard discharge are necessary to maintain 2 boundary protection. 3.1.6 Provide diver services to install a cofferdam on the sea chest suction and plug the fire pump overboard discharge. Provide diver services and remove the cofferdam and plug from the overboard connection upon completion of work. 3.1.7 Crane and rigging services. The Contractor must provide crane and rigging services to renew GFP the fire Pump. The Contractor must provide rigging plan at the arrival conference. 3.1.8 If required, the Contractor must provide and install lifting pad eyes for removal and installation of Fire Pumpin accordance with SFLC Std Spec 0740. Remove lifting pad eyes after completion of the work item. 3.1.8.1 Maximum working load for various size pad eye is listed in the Table 2. Expected working loads may be considerably less than maximum working load, i.e. a 1 padeye used in the rigging plan will have an - expected working load of only 6,000 lbs (not the maximum 9,800 lbs) and pull tested to 9,000 lbs. TABLE 2 - PAD EYE MAXIMUM WORKING LOADS PADEYE SIZE MAX WORKING LOAD 1/2 2,400 lbs 3/4 5,800 lbs 1 9,800 lbs 1-1/8 12,100 lbs 1-3/16 13,300 lbs 3.1.9 Work locations. The concerned work area is identified in Table 1. See the applicable drawings in section 2 for guidance, locations, and details. 3.1.10 Electrical work. The Contractor must accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. WARNING Maintain double boundary protection to prevent flooding. 3.3 Fire pump inlet and outlet isolation. The Contractor must ensure a double boundary protection is always maintained. The Contractor must install cofferdam, overboard discharge plug and blank connections to isolate the fire pump from the sea as described below and as required by NAVSEA S0400-AD-URM-010/TUM Navy Tag-Out User's Manual. Firemain pump piping connection is shown on the Coast Guard Drawing 750-WMSL-521-026. 3.3.1 After installation of the plug on the overboard discharge, break the fire main on the inboard side of the overboard valve and install a blank flange with gasket on the inboard side of the fire main overboard valve, protecting against flooding through the overboard valve. 3.3.2 Remove the blank upon completion of work and prior to removal of the plug in the overboard connection. 3.3.3 Fire pump suction connection. After cofferdam is installed, close the fire pump suction valve from the sea chest. Break the fire pump suction connection on the downstream side of the valve and install a blank flange. 3.3.4 Remove the blank flanges upon completion of work and prior to removal of the plug in the overboard connection. 3.3.5 The Contractor must close the fire pump suction from the sea chest. Break the fire pump suction connection on the downstream side of the valve and install a blank flange. 3.3.6 Temporarily install a blank flange and gasket on the fire pump discharge piping flange as soon as the fire pump is disconnected to allow continued operation of the firemain in an emergency. Remove the blank flange and reconnect the fire pump upon completion of repairs. 3.4 Electrical connections. The Contractor must disconnect the electrical cables to Fire Pump in accordance with SFLC Std Spec 3042 and record wiring information for later re-connection. Insulate the removed cable ends with electrical tape for safety. Submit a CFR. 3.5 Fire pump removal. After all piping and electrical connections are removed, the Contractor must remove Fire Pump Assembly from its foundation. 3.5.1 The Contractor must rig the existing Fire Pump Assembly from the cutter (Pump Room #2): 5-72-01-E) to Pier as per rigging route shown on Coast Guard Drawing 750-WMSL-101-027. 3.6 Foundation Preservation. While Fire Pump Assembly is removed, wire brush or power tool clean the pump foundations and the area under the pump foundations to approximately 1 ft. away from the foundations to remove loose paint and rust. Feather all edges. Clean the areas in accordance with SSPC SP-3. Solvent wipe the areas in accordance with SSPC SP-1. Paint the prepared areas with two coats of epoxy paint to match the existing system as described in SFLC Std Spec 6310. 3.7 GFP Fire Pump installation. The Contractor must rig GFP Fire Pump Assembly from Pier to the cutter (Pump Room #2, 5-70-01-E) as per rigging route shown on Coast Guard Drawing 750-WMSL-101-027. 3.7.1 The Contractor must mount GFP Fire Pump to its foundation as shown on Coast Guard Drawing 750-WMSL-180-012 with new fasteners. 3.7.2 Clean piping gasket surfaces before installing new gaskets. Provide and install new gaskets at all piping connection. Renew all mounting fasteners. 3.7.3 The Contractor must make all piping connection to Fire Pump to its original operating condition as shown on Coast Guard Drawing 750-WMSL-521-026 and TP 7013. Verify cofferdam and plugs have 3.7.4 The Contractor must re-connect electrical cables with previously recorded wiring information in accordance with SFLC Std Spec 3041/3042 and TP 7013. 3.8 Installation checkout. Perform installation checkout in accordance with TP 7013. Verify cofferdam and overboard plugs have been removed before operational test. Submit a CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.9 Operational test - post repairs. After completion of work, the Contractor must perform an operational test (by Coast Guard personnel) of the Fire Pump to prove satisfactory operating condition, with no leakage. Operate the Fire Pump for - Hour. Verify that the direction of pump rotation is correct. Submit a CFR. 3.6 Touch-up preservation. The Contractor must prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). 4. NOTES 4.1 Figures. For illustration only.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS