Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on January 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC HEALY BOILER TECHNICIAN TRAINING

Closed
70Z08526Q000171Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
The U.S. Navy, through the Navsup Fleet Logistics Center Naples, is soliciting a Firm-Fixed-Price contract for a Vessel Voyage Repair Availability (VRA) for the USS Mt Whitney (LCC 20). The work will be performed in Gaeta, Italy, with a period of performance from December 1, 2026, through December 15, 2026. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, featuring tasks such as barometer calibration, steel repairs, fire room drain piping repairs, LPAC hose hydrostatic testing, and insulation repairs. The contractor must adhere to strict technical standards, including MIL-STD-869 for thermal insulation, ANSI and ISO requirements for calibration, and US Coast Guard and COLREGS Navigation regulations. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered, quoters must be rated acceptable regarding their technical capability, which requires providing proof of ISO 9001 or 14001 Quality Management Systems, ABS welding certifications, and laboratory qualifications for calibration. The contract emphasizes rigorous safety and environmental compliance, requiring certified Marine Chemists for gas-freeing and strict adherence to international and local regulations for the handling and disposal of hazardous materials. Invoicing must be processed electronically via Wide Area Work Flow (WAWF). Quotes are due by November 2, 2026, and must include completed Standard Forms 18 and 30, along with specific representations and certifications regarding tax status and defense telecommunications equipment.
Navsup Flc Sigonella Naples Office

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is soliciting proposals for a comprehensive propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project requires a factory-certified Honda Marine Authorized Dealer to decommission and remove two existing Honda BF250A outboard engines and replace them with new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing the removal of legacy rigging, a structural assessment of the transom, installation of new engines and Honda iST electronic control heads at dual helm stations, integration with the existing SeaStar PA1315-2 Power Assist steering and NMEA 2000 network, and a complete fuel system overhaul using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and adhere to strict insurance requirements, including at least 1 million dollars in commercial general liability and business auto liability. Financial protections include a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. Proposals are due by November 13, 2026, and will be evaluated based on a 100-point scale considering technical capability and budget, with specific preferences given to responsible Indian Offerors under TERO and tribal preference laws. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 16 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Louisville, KY, 40218, USA

Set-Aside

8A

Documents

2

SOW Boiler Technician Maintenance Level One and Two Training

DOC, High priority: read this first6 pages · sow
High

Notice of Intent to Sole Source 70Z08526Q000171

PDF, Low priority1 page · notice-of-intent
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

NOTICE OF INTENT TO SOLE SOURCE 70Z08526Q000171



The Department of Homeland Security {DHS}, United States Coast Guard {USCG} Surface Forces Logistics Center {SFLC}, located at 1 Eagle Road Bldg. 55, Alameda CA 94501 is issuing this Notice of Intent {NOI} to inform industry contractors of the Government's intent to Award a Sole Source Firm Fixed Price {FFP} Contract IAW Federal Acquisition Regulation {FAR} Part 12 and 13 procedures.


The intended Contractor WARE INC., located at 3401 Bashford Ave Court Louisville, KY 40218 United States.


USCG SFLC requires: CGC Healy Boiler Technician Maintenance Training.


This procurement is being conducted using commercial item procedures pursuant to Federal Acquisition Regulation {FAR} Part 12 and FAR Part 13, specifically FAR 13.106-1{b}{1}, allowing the Contracting Officer


{KO} to solicit from one source.


The North American Industry Classification System {NAICS} for this requirement is 336611 - Ship Building and Repairing. The Product of Service Code for this requirement is U008. This will not be a small business under the Small Business Administration {SBA} size standard for this sector.


This notice of intent is neither a formal solicitation nor a request for competitive proposals. No solicitation document is available, and telephone requests will not be honored. No award will be made on the basis of unsolicited quotations or offers received in response to this notice. Any response to this notice must show clear, compelling and convincing evidence that competition will be advantageous to


the Government. The intent of this synopsis is for informational purposes only. Information received will normally be considered solely for the purpose of determining whether to conduct competitive procurement. A determination by the Government not to complete this action based on this notice is solely within the discretion of the Government.


All inquiries and concerns must be addressed in writing via e-mail to Ms. Oneal at contact@example.gov with the following information referenced in the subject line, Solicitation 70Z08526Q000171. A determination by the Government not to complete this proposed procurement based on the responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct competitive procurement. All interested parties who are responsible, certified, and capable may identify their interest and may submit an offer or quotation which shall be considered by the agency no later than 8:00 AM Pacific Time


{PST} on JAN 27, 2026, to Ms. Oneal at contact@example.gov


The interested parties bear full responsibility to ensure complete transmission and timely receipt.



Statement of Work: Boiler Technician Maintenance Level One and Level Two.



The Contractor shall provide a proposal for Off-Site Level One and Level Two Boiler Technician Training.  Contractor shall provide a proposal for instructor(s) led hands on training for USCGC HEALY Firetube Boilers and USCGC POLAR STAR Watertube boilers in a classroom and lab setting for up to (6) six students in 5 Days.  The proposal shall include all course instruction, course materials, and Examinations for Fire Tube Boilers and Water tube Boilers



References:  KEWANEE Firetube Boiler Model S9517-AY-MMC-010, Clever Brooks, Cyclo-Therm Boilers, Babcock Wilcox Water Tube Boilers.



Requirements: 



  • Classroom and hands-on Boiler Operator and Maintenance Training Level One and Two offsite in Louisville, KY
  • Training course materials, certification examinations and Flue Gas Analyzer equipment usage, Training Videos and various props for display pertaining to causes of failure of boilers.
  • Provide qualified instructor, all training materials, equipment, final exam, certifications, end of course surveys, and curriculum as listed below:

1.           Boilers – Knowledge in the operation, maintenance, repair, economics of basic systems including the use of steam, the energy source to produce the steam, the distinction between industrial and utility boilers, and a good concept of how steam is generated from a heat source other than combustion within a boiler.


a.   Steam Cycle – The Boiler Operator should know the Rankine Cycle, the effects of reheat cycles and regenerative feed water heating.


b.    Fuel/Energy Source –The Boiler Operator should know the types of fossil fuels used in a btu’s of each type of fuel used.


c.    Utility Boilers – The Boiler Operator should know that utility boilers are those plants that generally supply electricity to most of the United States.  These boilers are most often fired with coal but are also fired with fuel oil and gas.  Utility boilers have reheat cycles, and require very elaborate water treatment systems.


d.   Industrial Boilers –The Boiler Operator should know industrial boilers are most often used for process steam, such as heating, driving operating turbines, for fans or pumps, and other process work.


e.    Cogeneration –The Boiler Operator should know that cogeneration is a system in which fuel is used to produce energy and the heat from the fuel is then directed to be used by a boiler to conserve energy and achieve the maximum efficiency from the heat generated.


Boiler Design/Application, heat transfer, steam properties, control devices, furnace design, economic devices, firing equipment, and draft.


2.           Boiler Design/Application – The boiler operator should know: how the application affects the design, size, and type of boiler to be used.  Also, the types of heat transfer, how they differ, and where each takes place within the furnace.  The boiler operator must have an understanding of the relationship between steam pressure and temperature and how to control their parameters.  The boiler operator must have knowledge of the rules for construction of boilers, including material properties, accessories supplied, and heat source.  Knowledge is needed for plants that span the last fifty year or more.


a.   Boiler design/application – The boiler operator should know fire tube, vertical (submerged and nonsubmerged), horizontal, water tube, and cast iron type boiler construction.  The boiler operator should be able to describe the differences between package and site-erected boilers.  The boiler operator should be able to describe the differences between package and site-erected boilers.  The boiler operator must know the difference between a longitudinal weld joint and circumferential weld joint.  The operator should be able to describe the flow of gases through each type of boiler.


b.    Heat Transfer – The boiler operator must understand conduction, convection and radiation heat transfer.  The boiler operator should be able to describe the various types of fluid flow and how they affect heat transfer.  The density of steam versus boiler pressure, and the meaning of saturation temperature must be understood.


c.    Steam, properties and Control Devices – The boiler operator should know location and purpose of a dry pipe, cyclone steam separators, steam scrubber, or baffles.  The boiler operator should know the function, types, location, operation, start up, and efficiency of superheaters.  Have an understanding of the effects of carryover and how it is prevented, steam quality, and desuperheaters or attemperators.


d.    Furnace Design – The boiler operator should understand the reason(s) for having ash re-injection, furnace baffles, and water walls (water cooled furnace).  The boiler operator should have knowledge of soot blower operation, types and location. Refractory walls, slag, erosion and spalling, purpose of a water screen, flame impingement, clinkers, clinker cinders are topics with which the boiler operator should be familiar.


e.   Economic Devices – The boiler operator should know the construction location, types, and purpose of an economizer, air-preheaters, and thermocouples.


f.    Firing Equipment – The boiler operator should understand and be able to operate pulverized firing, chain grate firing, spreader stoker firing, and underfeed stoker firing.


g.   Draft – The boiler operator should understand balanced draft units, pressurized draft unit, primary air, secondary air, tertiary air.


Boilers – Construction; materials, support, types of stress, openings and fittings, heating surface and capacity.


3.           Boilers Construction – The boiler operator must be aware of the materials, design, and limits of those materials used in the equipment in their charge.  Stress the access for cleaning, inspection, and repairs, as well as the appliances attached to the boiler to ensure it does not exceed the limits of its design.  In addition, the operator must know the abilities and limits of the unit being operated to prevent failures of equipment that may result in injury or death.


a.   Materials – The boiler operator must have knowledge and understand limitations of materials used in boiler construction.  The boiler operator should have knowledge of proper operating procedure, which will help to prevent creep or graphitization.  Being able to specify the nondestructive examination method to be used to inspect the boiler is also part of the knowledge needed by the boiler operator.


b.   Openings and Fittings – The boiler operator should know the requirement for the minimum size of a manhole or hand hole opening.  In addition, he must able to list the purpose of other openings in the drum, and be able to identify the process of rolling tubes into a boiler.


c.    Heating Surface and Capacity – The boiler operator should know the definition of heating surface, and how twelve square feet of heating surface is related to Ohio law concerning licensed operators and engineers.  The operator must be able to convert evaporation rate to horsepower.


Combustion-fuels, control of the rate of combustion.


4.           Combustion – The boiler operator must be proficient in the techniques used to control fuel and air to a furnace, thus regulating the release of heat to the boiler.


a.   Fuels and their equipment – The boiler operator should know the combustion process, temperature required for combustion, atomization, and absolute pressure.


b.   Control of the rate of Combustion – The boiler operator should know how to control the supply air (oxygen) part of combustion, the condition or degree under which combustion takes place, flue gas analysis methods, the amount of air required to burn a pound of fuel, and tempering of fuel.


Combustion Equipment-specific types of equipment for each type of fuel including safety devices, monitoring and adjusting fuel burning equipment, and mechanical and draft.


5.           Combustion Equipment – The boiler operator must be familiar with the devices used to supply fuel to the furnace.  This includes using solid, gaseous, or liquid fuels; the protective devices, types of controls used, and understand the type or types of draft required for each fuel including units that operate on multiple fuels.


a.   Combustion Equipment – The boiler operator should know operation and maintenance of coal stokers, such as chain grate, spreader underfeed, and pulverize.  Must know oil fired burners, mechanical or pressure type, and the advantages and disadvantages of each.  In addition, operation and maintenance of gas-fired burners whether the supply is natural or man made.  The operator must be able to describe the method of disposing of ash and products of combustion, and know the physical requirements of the fuel system.


b.   Safety Devices – The boiler operator must be able to explain how to properly fire a boiler.  The boiler operator must be able to explain the importance of purging the furnace and of heating or pressurizing the fuel.  The operator must know what devices are to be installed in the fuel system to protect it.


c.   Monitoring the furnace – The boiler operator must be able to explain what can happen if the burner flame is not controlled properly.


d.    Draft – The boiler operator shall see to it that induced, over fire, and forced draft fans are operational, and must determine if a balanced draft on positive pressure furnace is distributing heat and gases as required to prevent failure in the furnace.


Boiler Indicators and Devices – to provide for operation, prevent over-pressure, determine water level, valves, piping blow down systems, and measuring devices.


6.          Boiler Indicators and Devices – The boiler operator must have knowledge of operation and maintenance relating to the devices that are provided to assist in determining and maintaining water level, steam pressure, isolating the boiler, and preventing over pressure of the boiler.  The devices shall be in the proper location, using recommended code installation practices.


a.   Safety Devices – the boiler operator shall know the operation, maintenance, location, purpose, and proper installation of a boiler water column, safety valve, blow down valve, heater/non return valve, steam gauge, fusible plug, and feed water regulator.


b.   Safety Valve – The boiler operator shall be able to properly test the safety valve of the boiler and know the minimum number of valves required for installation.  The boiler operator must know the requirements for; discharge piping, minimum blowback values, and the minimum capacity for safety valves.


c.   Boiler Water Level Devices – The boiler operator will know the proper procedure to determine the water level of the boiler, the location of the water column and the minimum size, strength, and type of pipe and fittings sued.


d.   Valves and their applications – For each appliance, the boiler operator will know the type of valve used in which order is used on feed water, blow down, steam header, water column, and all other connections to the boiler.


e.   Instrumentation – The boiler operator shall know how to use all measuring devices, insure that they are attached properly, and be able to perform test to prove their accuracy. These items may include; steam gauges, draft gages, water gauges, fuel, and temperature gauges.


Boiler Operation-abnormal operations, start up, shut down, efficiency, water supplies, idle boilers, maintenance, repairing, and evaluation of a boilers’ condition


7.           Operation and Maintenance – The boiler operator must show evidence that indicates the comprehension of the theory of the production of steam from boilers, during all phases of operation, maintenance, repairs, and inspection.


a.    Start Up and On-line Operation of Boilers – The boiler operator should understand the sequence of operation that lends up to on-line operation.  This includes any special considerations for new or newly repaired boilers.


b.   Combustion – The boiler operator should be able to monitor, analyze, and regulate the combustion process to operate in the most efficient and safe manner.


c.    Operational Problems – The boiler operator needs to be able to recognize problem areas immediately and control potentially un-safe operation. Abnormal operation, priming and carry over, tube failure, fires, inconsistent draft, and gauge glass breakage are some of the situations that an operator must, at all times, be ready to handle.


d.   Idle Boilers – The boiler operator should be able to care for idle boilers, know how to take a boiler out of service, and know how to place a boiler in wet or dry lay up.


e.   Boiler maintenance – The boiler operator should be able to; perform routine maintenance, schedule maintenance, prepare boilers for internal inspections, and external inspections, or repairs.  To obtain maximum efficiency in operation the boiler needs to be maintained on a regular schedule.


Pumps-type, applications, facts used in selecting, conditions for operating, and maintenance.


8.           Pumps – The boiler operator shall demonstrate knowledge indicating comprehension of the operation, maintenance, start-up and shut down of all types of pumps used throughout a powerhouse.


a.    Pumps- The boiler operator must be able to identify the types of pumps and the varied uses of pumps.  The operator must understand their capabilities and what can be expected of injectors, duplex pumps, power pumps, vacuum pumps, rotary pumps, and centrifugal pumps.


b.   Pump Operation – The boiler operator needs to be able to properly line up and bring pumps on line, regulate pump discharge and understand the performance characteristics of the pump.


c.   Pump Maintenance – The boiler operator needs to know when and how to care for each type of pump, must identify the required routine maintenance, and schedule maintenance, to maintain peak performance of all types of pumps.


Boiler Auxiliary Support Equipment – types and operations of feed water heaters, water system make up, condensate, polished systems, blow down systems, steam traps, separators, lubricator types and devices with their auxiliaries


9.           Boiler Auxiliary Support Equipment – The boiler operator shall demonstrate knowledge that indicates comprehension of the operation, maintenance, start-up and shut down of boiler auxiliary equipment used through out a powerhouse.  These items include pre-heating, water treatment, distribution of steam, return of condensate, and lubrication operations.


a.   Feedwater Control Heating Equipment – The boiler operator needs to know feed water heaters, closed and open, and deaerators.  The boiler operator must have a thorough understanding of preheating of feedwater and the differences of single element, two element and three element water level control, and which components provide these benefits.


b.    Boiler Water Treatment – The boiler operator needs to know water treatment. To maintain peak performance and limit down time, water quality is of great importance to safe operation.  The boiler operator must be able to analyze and chemically treat water for each condition.  The boiler operator must understand the affects of blowing down a boiler.


c.    Piping Systems for Steam and Condensate – The boiler operator needs to know piping systems design, material selection, flanges and fittings are topics with which the operator must be familiar.


d.   Steam Traps – The boiler operator needs to know the various designs and types of steam traps, separators, and strainers.  To gain the most efficiency from the steam, it is dried for use using separators.


e.   Lubrication – The boiler operator must understand classification and uses of lubricants and lubricating devices.  The applicant must know what provides the best protection and reduces friction, and the different methods of application.


Environment Control –types, technology, particulate control, equipment for specific controls, mechanical, bag filter, and precipator.


10.       Environmental Control – The boiler operator shall demonstrate knowledge that indicates comprehension of the operation, maintenance, start-up and shut down of environmental equipment and to comply with environmental responsibilities of the plants operation.


a.   Pollution Controls and Standards – The boiler operator needs to know the types of emissions, how they are monitored, and the operator must be able to differentiate one condition from another, and control the situation accordingly.


b.   Pollution Control Devices – The boiler operator needs to know how particulates are controlled, mechanical collectors, electrostatic precipitators, bag filter houses, how to control pollution by-products or stack gas emissions are topics with which the operator must be familiar.  The applicant needs to identify the different methods available and the principles of operation.


c.    Flue Gas Analysis – The boiler operators needs to know how to operate a flue gas analyzer provided by the instructor and know the situations required to correct fuel efficiency and combustion issues depending on atmospheric standards throughout various global latitudes.


Math formulas


11.       Math Formulas – Math from the text the boiler operator must know the formulas, as there will be no books, notes, and no programmable calculators allowed under NIULPE Engineered test.


a.      The internal design pressure of an existing boiler.


b.      Absolute pressure.


c.      Pounds of water to condense one pound of steam.


d.      Calculation of Boiler Horsepower.


Laws and Rules


12.        Laws and rules pertaining to the licensing of Stationary Boiler Operators, Boiler Operators and High Pressure Boiler Operators


a.      Horsepower by heating surface


b.      Licenses renewals


c.      License revocation and expiration


d.      Experience and schooling


e.      Display of license


f.      Requirements of boilers over thirty (30) horsepower by heating surface.



Period of Performance: Contractor shall complete the training course in Louisville, KY at Ware Boiler University Facility from the 27th of April until the 1st of May 2026



Place of performance:


WARE Boiler University


4200 Produce Road


Louisville, KY, USA


40218


LOCAL POC: Jude Wolf


+1 (555) 000-0000


More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS