Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USDA-Forest Service Bridge 521-2.9 Replacement Kisatchie NF LOUISIANA

Closed
12445126B0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 14 hours ago

DEADLINE

in about 14 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 15 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract entails the firm-fixed price replacement of the Bridge 521-2.9, located on National Forest Service Road 521 in Grant County, Louisiana, within the Kisatchie National Forest. The project involves complete removal of the existing bridge structure, including piles, followed by installation of a new single-lane prestressed concrete span bridge meeting FP-03 and FP-24 standards specific to USDA Forest Service supplementation. The contractor is responsible for providing all labor, materials, equipment, supervision, and transportation necessary to complete the bridge replacement according to detailed specifications, structural designs, and applicable material standards such as AASHTO and ASTM. The replacement work includes excavation, structural backfill, riprap placement, installation of prestressed concrete piles and precast concrete members, as well as site restoration. The bridge site is closed to all traffic, requiring bidders to self-inspect and certify conditions prior to bid submission. This procurement is a total small business set-aside under NAICS code 237310, covering highway, street, and bridge construction, with an anticipated contract value estimated between $250,000 and $500,000. Award will be made by lowest-price, responsive, and responsible bidder on a sealed bid basis, with proposals due by May 22, 2026. The period of performance extends approximately 180 days from notice to proceed until December 31, 2026. The contracting office overseeing the solicitation is USDA Forest Service CSA EAST 11 in Atlanta, Georgia, with primary points of contact designated. The contract incorporates extensive federal acquisition regulations governing inspection, wage rates, labor standards, security requirements, and anti-trafficking provisions. Inspection and acceptance are conducted by the government at the project site and material sources, ensuring compliance with contractual and material quality requirements. Special contract requirements mandate contractor compliance with anti-discrimination laws, whistleblower protections, Buy American requirements for construction materials, and personal identity verification standards. Invoicing will be processed through the Invoice Processing Platform, and contractors must provide a bid guarantee upon submission. The solicitation highlights the need for complete and timely bid submissions, including certification of bridge inspection by the bidder, with no organized site visit scheduled. All contract terms, conditions, and technical details, including detailed schedules, geotechnical reports, and structural drawings, are included or referenced within the solicitation package for bidder review.

General Info

Firm-fixed price bridge replacement in Kisatchie National Forest, Louisiana; small business set-aside, bids due May 22, 2026.

Contract Value

$718,094.46

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

LA, 71432, USA

Set-Aside

SBA

Award Issued Date

Documents

1

Solicitation 12445126B0016 Bridge 521-2.9 Replacement Kasitchie NF Louisiana

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 11 Usda-Fs
Contacts2 people available
OfficeAtlanta, GA, 303092449, USA
Office AddressAtlanta, GA, 303092449, USA

Full Description

Show more

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 – Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation document will not be issued. This solicitation is being issued under the authority of FAR Part 14 - Sealed Bidding.


This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR 12 and 14.


BY SIGNING THE SF1442, THE CONTRACTOR IS CERTIFYING THEY HAVE CONDUCTED A SELF-GUIDED INSPECTION OF ALL BRIDGES ON THIS INVITATION FOR BID. All work to be performed under the contract awarded will be in accordance with FP03/24 and USDA Forest Service supplements.  


This is an Invitation for Bid (IFB) will result in award of a firm-fixed price contract. Award will be made using a Lowest Price responsive/ responsible evaluation. The government intends to award One (1) contract based upon overall low bid.  Terms, conditions, and the requirements, Road Bridge Inspection Report is provided for this project(s).


Project Title: Bridge 521-2.9 Replacement Kisatchie NF LOUISIANA


Set Aside: Total Small Business Set-Aside (FAR 19.5)


NAICS: 237310 Highway, Street, and Bridge Construction / PSC Z1LB MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAIL


Magnitude: Between $250,000 and $500,000.


52.228-1 Bid Guarantee (Sept 1996): Required


Location: NFSR 521-2.9 over Bear Creek, Grant County, Louisiana at mile post 2.7260.  The project is located on the Winn Ranger District in Natchitoches Parish, Louisiana on FSR 521 at milepost 2.9. The project is approximately 14 miles SSE of Winnfield, Louisiana.   Latitude 31.776351  /Longitude -92.546279


Scope of Work Summarized: The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided in the contract, to successfully complete the following work on National Forest Road (NFSR)  utilizing/meeting FP-03 and 24 standards. This project is for the replacement of NFSR 521-2.9 over Bear Creek, Grant County, Louisiana at mile post 2.7260.  Rehabilitation to include but not limited to the following (See SOW/Plans/Etc for Complete Details): Mobilization of personnel, material, and equipment;  20302 Removal of Existing Bridge (Remove Piles or Cut Piles Below Grade); 20801 Structural Backfill Cubic; 20803 Structural Excavation; 25102 Placed Riprap, Class 2 (La Dotd Class 130);30208 Crushed Aggregate Surfacing Course; 55101 Prestressed Concrete Pile, 14" X 14"; 55201 Structural Concrete, Class A, (Ae); 55218a Precast Concrete Member, Abutment Pile Cap;55218b Precast Concrete Member, Pier Pile Cap; 55218c Precast Concrete Member, Wingwall;55218d Precast Concrete Member, Backing Plank; 55301a Precast, Prestressed Structural Concrete Member; 55301b Precast, Prestressed Structural Concrete Member; 55401 Reinforcing Steel, Grade 60. 


SCHEDULE:


Site Visit: Contractor will self-tour the bridged and certify on the Schedule B for each line item. An organized site visit is not scheduled. Bidders are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.  NOTE: The bridge is currently closed to ALL traffic.


Questions Deadline: 30 APR 2026.   Questions shall be submitted Richard.huffman@usda.gov and cc: Charles.cotton@usda.gov, and are due no later than April 30th, 2026.  The subject line should read: 12445126B0016 QUESTION.


Bids Deadline: 22 May 0900 CT. All bids shall be received by 0900 CT and emailed to Richard.huffman@usda.gov (501-431-7084) and cc: Charles.cotton@usda.gov (: (859) 745-3106). 


Subject Line: 12445126B0016 BID_Co. Name


**The contractor SHALL call the CO/CS to confirm receipt of the proposal/bid.  This is to prevent loss due to email systems “quarantines”


Period of Performance: award through 31 Dec 20226 (Approx 180 Days)

More opportunities from Department Of Agriculture → Csa East 11 Usda-Fs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS