Utility Pole Replacement Project - 725-6US-1198
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Southern California Edison is proposing to replace three aged utility poles situated within the California Department of Transportation right-of-way along State Route 150, Casitas Pass Road, at Post Mile 0.07 in the City of Ventura. The project involves the complete removal and installation of new poles, along with the replacement of three associated anchors, installation of overhead equipment and wiring, and the replacement of existing conductors. Excavation for the new pole foundations will be limited to a maximum depth of 72 inches, an average width of 24 inches, and a maximum length of two linear feet per location. No relocation of public utilities or acquisition of additional right-of-way is required. All work will include necessary temporary traffic control measures to ensure safety and minimize disruption during construction. The project is forecasted under the utility pole replacement initiative and is being managed by Caltrans District 7, with Mojgan Abbassi as the primary point of contact listed for environmental coordination.
General Info
Agency
NAICS
Place of Performance
Ventura, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
