Utility Pole Replacement Project 725-6US-1637
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Southern California Edison plans to replace pole number 1123605E and its associated guy anchor, down-guy wire, and span-guy wire located within the Caltrans right-of-way along State Route 138 at Post Mile 13.55 in Neenach, Los Angeles County. The new pole will be installed directly east of the existing structure, with all work confined to the existing right-of-way without the need for new acquisitions or utility relocations. The span-guy wire that crosses Highway 138 will be replaced aerially to minimize disruption. Excavation for the new pole foundation will be limited to a maximum depth of 96 inches, width of 24 inches, and length of two feet. All necessary traffic control measures will be implemented during the work, ensuring compliance with safety standards and minimizing impacts to highway operations. The project is managed by Caltrans District 7 in Los Angeles, with environmental oversight provided by Mojgan Abbassi, and was posted as a forecast on August 14, 2025.
General Info
Agency
NAICS
Place of Performance
Los Angeles, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
