Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Utility Trenching and Earthwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Pittsburg, CA, 94565, USA

Set-Aside

NONE

Documents

This scope was carved out of 5130.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Terry Court Sewer Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pittsburg
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, shoring, and backfilling for utility installations for prime contractors on City of Pittsburgh, California utility infrastructure projects. Executes saw cutting, utility trenching, and the placement of sheeting, shoring, and bracing. Manages pumping of excavations and backfilling around structures per California Codes. Utilizes trenchers, shoring shields, and compactors. Delivers open, supported trenches and compacted backfill.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Turn to the River Phase III
Solicitation # 49389
The Turn to the River Phase III project is a park construction solicitation issued by the City of Terre Haute, Indiana, for work located at 17 Harding Avenue. The scope of work encompasses the construction of pedestrian walks, plaza areas with seating, a central promenade, shade structures, a synthetic turf mound, lighting, and supporting planting beds, along with utility adjustments. Specific technical requirements include the installation of fiber reinforced concrete paving, a complete electrical system with receptacle pedestals, and various plumbing elements such as drinking fountains, yard hydrants, and copper water piping. The project also involves demolition of existing concrete pavement and tree removal. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluations based on compliance with the bid form and the bidder's responsibility. Bidders must submit their proposals via the Bid Express platform by October 26, 2026, including a bid security equal to 5 percent of the maximum bid price. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract amount, which must remain in effect for the project duration plus twelve months. Compliance with several federal regulations is mandatory, including the Davis-Bacon Act for wage scales, the Copeland Act, and various Equal Employment Opportunity and non-discrimination mandates under the Civil Rights Act and the Americans with Disabilities Act. Strict material handling and marking standards are required, particularly for concrete pavers, steel reinforcement, and underground utility warning tapes. The contractor is responsible for all inspections and tests, while the Engineer maintains the authority to reject defective work. Within 10 days of the construction effective date, the contractor must provide preliminary progress, submittal, and value schedules.
City of Terre Haute

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is seeking design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project involves the design and construction of manholes, estimated to be between 10 and 25 feet deep, to facilitate the inspection of approximately 27,000 feet of perforated corrugated metal seepage collector pipe. A critical requirement of the project is the use of minimally invasive excavation methods, as invasive mass excavation such as trenching is strictly prohibited. Key deliverables include a USACE-approved Drilling and Invasive Program Plan, temporary flood protection plans, post-completion video inspections of collector lines, and final as-built drawings. All work must comply with specific standards, including ER 1110-1-1807 and EM 1110-2-2902. This is a two-phase solicitation under NAICS code 237990, with a total construction cost limitation of $3,400,000. Phase 1 focuses on qualifications and technical approach, with no pricing submitted at this stage. Evaluation is based on performance confidence, technical approach and qualifications, and design concepts, with the government intending to select up to three qualified offerors for Phase 2. The final contract will be a firm-fixed-price award. Requirements include the provision of 100 percent performance and payment bonds, adherence to the Davis-Bacon Act wage determination KS20260161, and compliance with the Buy American Act. Proposals must be submitted via the PIEE Solicitation Portal by the specified deadline.
W071 Endist Kansas City

POSTED

about 11 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid procurement issued by the Department of Defense, W2SD Endist New England, for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. This project is a total small business set-aside under NAICS 237990, with an estimated value between 1,000,000 and 3,000,000 dollars. The scope of work involves the mechanical dredging of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and isolated boulders to a required depth of -7 feet Mean Lower Low Water, with an allowable overdepth resulting in a maximum depth of -8 feet. All dredged material is to be transported and placed at the Flake Island Disposal Site, located approximately 0.9 to 1 nautical mile northwest of the project site, to enhance juvenile lobster and cod habitats. Performance is restricted to an environmental window between September 15 and April 1 to protect benthic resources and federally managed species, with the specific dredging and disposal period set from September 15, 2026, to March 1, 2027. The contractor must maintain a minimum production rate of 4,000 cubic yards every 30 calendar days and provide a project schedule within five days of the Notice to Proceed. Award will be granted to the lowest responsive and responsible bidder, with specific evaluation preferences for HUBZone small businesses. Key requirements include the provision of performance and payment bonds, compliance with NIST SP 800-171 cybersecurity standards, and the hosting of a partnering session within 45 days of award. All proposals must be submitted electronically via the Procurement Integrity Enterprise Environment portal.
W2SD Endist New England

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
Solicitation # W9127826BA003
Solicitation W9127826BA003 is a Firm-Fixed Price sealed bid for the maintenance dredging of the Pensacola Harbor Entrance Channel in Florida, issued by the U.S. Army Engineer District, Mobile. The project requires the removal of sand from Station 202+00 to 301+00 to a depth of 39 feet, with the dredged material to be placed along Perdido Key Beach at pumping distances up to 30,000 feet. The contractor must provide all necessary crew, management, and equipment, including hydraulic cutterhead pipeline, trailing suction hopper, or mechanical dredges with scows, along with supporting tugs and barges. The estimated project value is between 5 million and 25 million dollars, with a performance period of 151 calendar days and a final completion deadline of April 1, 2027. The contract includes a base bid for mobilization and dredging, alongside options for channel widener advance maintenance. Award evaluation is based on the total price of the basic requirement and all options, with a 10 percent price evaluation preference granted to certified HUBZone small business concerns. Key administrative requirements include the use of the Resident Management System for monitoring and CESAM Form 1151 for progress payments. Performance is subject to liquidated damages of 5,534 dollars per calendar day for delays. Compliance with the Davis-Bacon Act, Buy American requirements, and specific environmental protections for Pensacola Harbor is mandatory. Bids must be submitted via the PIEE Module by October 13, 2026.
W074 Endist Mobile

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → City of Pittsburg

Same awarding agency

NAICS: 237110
New
SLED
Terry Court Sewer Repair
Solicitation # 5130
The City of Pittsburg, California, is soliciting bids for the Terry Court Sewer Repair project, identified as solicitation 5130. The project involves abandoning an existing sanitary sewer main between 960 and 966 Terry Court and constructing a new sanitary sewer main along Terry Court to connect to the existing system at St. Moritz Drive, where a portion of the existing main will also be replaced. The scope of work includes open-cut construction of mains, manholes, rodding, and cleanouts, as well as sewer lateral locating, reconnections, temporary sewer bypass, and the restoration of pavement and private property. The estimated construction cost for the base bid is 500,000 dollars, with a performance period of 70 calendar days from the Notice to Proceed. Work is restricted to Monday through Friday, from 8:00 AM to 5:00 PM. Bidders must be determined responsible based on their ability, experience, and resources, and the contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include a signed bid proposal, a completed bid schedule, and bid security equal to 10 percent of the maximum bid amount. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and comply with prevailing wage requirements and California Air Resources Board regulations. Key deliverables include an as-built survey and various system tests, including manhole vacuum and mandrel testing. The City will perform final CCTV inspections and quality assurance testing for compaction and asphalt concrete. The project is governed by General and Special Conditions, requiring a pre-construction conference where the contractor must submit staging plans, traffic control plans, and a baseline schedule.
Water and Sewer Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS