Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 12, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

VAULT TOILETS - Precast (3) - Lac Qui Parle Day Use Areas

Closed
W912ES23Q0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 22 days

General Info

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

Watson, MN, USA

Set-Aside

SBA

Documents

5

Amendment 0001 to RFQ W912ES23Q0012 - Precast Vault Restrooms (LQP)

PDF, High priority: read this firstamendment
High

Amendment 0002 to RFQ W912ES23Q0012 - Precast Vault Toilets LQP

PDF, High priority: read this firstamendment
High

Amendment 0003 to RFQ W912ES23Q0012 - Precast Vault Toilets LQP

PDF, High priority: read this firstamendment
High

Amendment 0004 to RFQ W912ES23Q0012 - Vault Toilets LQP

PDF, High priority: read this firstamendment
High

W912ES23Q0012 - Precast Vault Toilets (LQP)

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 14, 2023 to Mar 9, 2023. The notice description changed.

Notice updated

Response deadline changed from Mar 9, 2023 to Apr 18, 2023. The notice description changed.

Notice updated

Response deadline changed from Apr 18, 2023 to Apr 27, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts
Toni W. Wasgatt

Full Description

Show more
Amendment 0004 - Revised SOW Window Specs, 52.211-10, 52.236-27, and extend due date and time for receipt of quotes. See W912ES23Q0012-0004 attached. Amendment 0003 - Revised SOW Specs and extend due date and time for receipt of quotes. See W912ES23Q0012-0003 attached. Amendment 0002 - Change Completion Date of project to 16 May 2024 and extend due date and time for receipt of quotes. See W9212ES23Q0012-0002 attached. Amendment 0001 - Responses to Interested Vendor Questions and a revised SOW. See W912ES23Q0012-0001 attached. The U.S. Army Corps of Engineers, St. Paul District requires a Contractor to furnish and install three (3) precast, single-access ABA compliant vault restrooms each with concrete privacy/entrance screen. See attached Request for Quote RFQ with Statement of Work for full details. One (1) vault toilet shall be located at each of the following USACE Lac Qui Parle (LQP) Day Use Areas: LQP Dam, northwest of Watson, MN Marsh Lake, southwest of Appleton, MN Highway 75 Dam, southeast of Odessa, MN This RFQ is 100% Set Aside for Small Businesses. The NAICS for this project is 238120 Structural Steel & Precast Concrete Contractors with a size standard of $16.5M. The estimated magnitude of contruction is between $25,000 and $100,000. Payment and Performance Bonds will be requried.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS