Vent Hood Installation (Mechanical)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC), acting as the operator for the Inland Empire Job Corps Center, is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the facility in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW units. All new devices must be integrated into the existing system and undergo complete functional testing. The project is estimated between 0 and 25,000 dollars, with a performance period of 90 consecutive business days following the notice to proceed. Bids are due by September 16, 2026, and will be evaluated based on overall best value. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 238210. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to California prevailing wage determinations. For bids of 25,000 dollars or more, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. Awardees must provide a Unique Entity ID (UEI) and complete the MTC Supplier Packet. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by the center and government representatives.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract pertains to the installation of a vent hood furnished by the owner, requiring the contractor to mount and securely fasten the unit, then connect it properly to the existing ductwork and electrical supply. This is a mechanical subcontract under NAICS code 238210, falling under the jurisdiction of the Florida Public Works agency with a response deadline of June 3, 2026. The work must be performed in accordance with local codes and standards, ensuring full functionality, safety, and compliance with ventilation and electrical regulations. The location of performance is not specified in the provided data, but the project is managed through Walton County, Florida, and all work is expected to be completed without disruption to existing utility systems. The contractor is responsible for all labor, tools, and materials necessary to complete the installation, excluding the vent hood itself, which remains the owner’s responsibility.

General Info

Mechanical subcontract for vent hood installation, duct connection, deadline June 3, 2026, Florida.

Agency

Florida → Public WorksView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 11-26.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fleet Maintenance Facility Repairs, Electrical, Plumbing.

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Mount and secure owner-furnished vent hood, connect to existing ductwork and electrical supply.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 541330
New
SLED
Professional Water Management Consulting Engineering Services for Commercial Irrigation Monitoring, Technical Support, and CUP Compliance
Solicitation # 20260236
The City of Port St. Lucie is seeking a qualified consulting engineering firm to provide professional water management services for 50 commercial irrigation sites. The scope of work focuses on irrigation monitoring, technical support, and ensuring compliance with Consumptive Use Permits (CUP) and Florida Statute 373.62(7) variance requirements. The selected consultant will be responsible for 24/7/365 monitoring of 1,444 zones using Rain Bird Maxicom II and Baseline central control systems, providing the necessary software to the City free of charge, and conducting annual smart site inspections with reports due to the South Florida Water Management District by February 1 each year. All services must adhere to the City of Port St. Lucie Public Works Irrigation Standards 328400. The contract is for an initial term of three years with one optional two-year renewal. To be eligible, the firm must employ a Florida licensed Professional Engineer and a licensed Irrigation Contractor, both with at least five years of experience. Additional staffing requirements include a Certified Landscape Irrigation Auditor, a training expert with a degree from a U.S. accredited institution, and personnel proficient in CRBasic programming. The procurement is conducted under the Consultants’ Competitive Negotiation Act, utilizing a best-value analysis that weights qualifications and experience at 70 percent and methodology at 30 percent, followed by an oral presentation. Invoices are submitted monthly and paid in accordance with Florida’s Prompt Payment Act.
Engineering Services

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS