The contract for VGLZ 182035 Repair Base Perimeter Road involves the construction and reconstruction of approximately 4.2 miles of two- and three-lane roads within the Selfridge Air National Guard Base, including the entire Perimeter Road and Jefferson Avenue from Main Gate to Wilbur Wright Blvd, with one mile of that length being a three-lane segment. Work includes full-depth pavement repairs, mill and overlay operations, crack sealing, installation of subsurface edge drainage, localized grading to correct drainage deficiencies, and application of new pavement markings and paint. All work must strictly adhere to the Statement of Work, project specifications, and drawings titled Repair Perimeter Rd VGLZ 182035, with any conflicts resolved in favor of the more stringent or higher-quality requirement. The contractor is required to maintain continuous traffic flow during construction and to remove and reinstall steel wedge barriers and jersey barriers in accordance with SANGB Security Staff instructions, ensuring steel barriers are reinstalled to match pre-construction grade levels. A Macomb County Soil Erosion Permit must be obtained, paid for, and fully complied with by the contractor, and all activities must be coordinated with Base Operations. The solicitation is a Total Small Business Set-Aside under FAR 19.5, with a NAICS code of 237310, and a total estimated value of $19 million, broken into three line items: $13 million for full-depth repairs, $5.7 million for mill/fill/overlay, and $300,000 for maintenance crack sealing. Bid submissions are due by 2:00 PM EDT on June 30, 2026, with mandatory acknowledgment of four solicitation amendments in Section 19 of the SF1442. A Heavy Wage Determination applies, governing labor standards for workers, and bid security is required. Base access is mandatory for personnel and must be requested via a form with password 127sfs, submitted no later than four days before any site visit, which was extended to June 11, 2026, at 11:00 AM EDT, with additional documentation including sign-in sheets and briefing slides provided. The project site is in Selfridge ANGB, Michigan, with all supporting documents—such as updated drawings, RFIs, the PFAS groundwater plume map, SOW Addendum 001, and other amendments—required for proper bid
General Info
Agency
NAICS
Place of Performance
Selfridge ANGB Base Perimeter Road to include the main drive onto the base and some higher traffic areas. Road work to be done , MI, 48045, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. (See attachments for further information to include base access request form) Base access request form and RFIs can be sent to David Brown at david.brown.39@us.af.mil. Base access form PW is 127sfs. Site visit will be held on Wednesday 3 June 2026 at 2:00pm EDT. Please have base access request forms in NLT 4 days prior to site visit. Update 1 June 2026: Updated drawings, specs, and RFI answers are published here under Updated Number 0001. Please acknowledge receipt of update Amendment 0001 when submitting your bid. Update 4 June 2026: Added Base wide PFAS GW Plume Map and associated RFIs for materials placement. Please acknowledge receipt of update Amendment 0002 in your bid. Update 5 June 2026: Two corrected drawings are being added, Perimeter Road Sheets 3 and Perimeter Road Sheets 4. These two drawings account for the northern portion of the perimeter road that is Not in Contract. This Amendment also adds in a new site visit day and time of Thursday, 11 June 2026 at 11:00am EDT. See site visit attachment for additional information. Please provide base access request as soon as possible in order to be vetted in time for the site visit. Please acknowledge this Amendment 0003 in your bid. Update 12 June 2026: June 11, 2026, Site Visit information added that includes sign-in sheet and briefing slides. Update 23 June 2026, Amendment 0004 added to incorporate additional RFIs, SOW Addendum 001, May 18, 2026, Heavy Wage Determination, additional drawing references, and bid due date and time extension. Bids now due on Tuesday 30 June 2026 at 2:00pm EDT. Please acknowledge amendment 0004 when submitting bid. Update 25 June 2026, Additional RFI answers added post 23 June 2026 posting. Please review RFI document. Also, please acknowledge all solicitation amendments in Section 19 of the SF1442 when submitted bid. There should be four amendments. Update 26 June 2026, Additional RFI added for temporary pavement markings. Update 29 June 2026, Additional RFI added for pavement thickness. Update 1 July 2026. Bid Abstract posted from 30 June 2026 bid opening. Bid abstract is unofficial at time until all preliminary responcibility matters have been met.
More opportunities from Department Of Defense → W7NF Uspfo Activity Miang 127
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS