VY-MISSISQUOI NWR-PARKING LOT MAINT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract pertains to maintenance of the approximately 1-acre asphalt parking lot serving the visitor's center and staff at the Missisquoi National Wildlife Refuge. Originally constructed in 2006 and last maintained in 2019, the parking lot has since developed cracks and faded striping due to harsh winter conditions and regular use. The scope of work involves cleaning and preparing the surface, filling cracks with hot rubberized filler, applying a commercial grade asphalt sealer, and re-striping the parking areas to match the existing layout. The contractor is also responsible for providing traffic management supplies, such as cones and sawhorses, to redirect visitors to an alternate parking area during maintenance. Key dates include a site visit scheduled for June 23, 2026, with a deadline for questions on June 24 and quotes due by July 3, 2026. The contract is set aside for total small business participation under NAICS code 237310, covering highway, street, and bridge construction. The Department of the Interior’s Construction A/E Team 2 and the Fish and Wildlife Service are the contracting agencies, with points of contact provided for coordination. The objective is to prevent further degradation of the asphalt surface and improve overall safety and usability of the refuge parking facilities.
General Info
Agency
NAICS
Place of Performance
VASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility.
The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied.
The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished:
1. Clean and prepare the entire asphalt surface to be seal coated.
2. Crack fill any cracks as needed with hot rubberized crack filler.
3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface.
4. Re-stripe all paring areas to match existing layout.
5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility
And other requirements as defined by the attached Scope of Work.
Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781
Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov