Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 23, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W--RENTAL OF AN ENVIRONMENTAL CONTAINMENT FOR 30 DAYS WITH 7 DAYS TO ASSEMBLE AND 7 DAYS TO DISASSEMBLE IT FOR THEUSS EISENHOWER (CVN-69) WITH INITAL SET-UP AND 2 MOVES

Awarded
N4002509Q0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

about 16 hours ago

DEADLINE

in 10 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 16 hours ago

DEADLINE

in 25 days
NAICS: 336611
New
Federal
USCG STA COOS BAY (47302-47242) FY27 DD REPAIR
Solicitation # 70z04027SSBPL28928
The Department of Homeland Security, through the U.S. Coast Guard SEA-C office in Norfolk, Virginia, has issued a Sources Sought Notice for dry dock repair services for two vessels, USCG STA COOS BAY (47302) and CG STA COOS BAY (47242). The anticipated work is scheduled to begin on March 2, 2027, in Charleston, Oregon, with an estimated period of performance of 121 calendar days per vessel. The scope of work requires the contractor to provide all necessary personnel, equipment, materials, and facilities to perform comprehensive repairs, including underwater body preservation, hull plating inspections, propulsion shaft and rudder assembly services, and the provision of marine chemist and sea trial support. The government intends to award a single firm-fixed-price contract, with the final competition and set-aside decisions based on market research conducted under NAICS code 336611. Interested sources must submit their capabilities, including company identification, UEI number, and business size certifications, to Troy Elliott by November 12, 2026. Evaluation of capabilities will include a review of past performance on projects of similar scope and a commitment to submit a proposal as a prime contractor. Economic considerations for the future award will include foreseeable costs such as crew lodging, messing, and travel in accordance with Joint Travel Regulations.
CG-SEA-C23

POSTED

about 16 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This contract requires the provision, setup, and maintenance of a modular environmental containment enclosure on the flight deck of the USS Eisenhower (CVN-69) to support nonskid replacement. The enclosure must measure 320 feet by 85 feet with a minimum clear height of ten feet and no internal deck supports. The project includes a 30-day operational period, seven days for assembly, and seven days for disassembly. The contractor is responsible for an initial setup and two subsequent moves, ensuring the structure can withstand 70 mph winds and maintain a watertight seal at the base. The contractor must be entirely self-sufficient, providing all necessary cranes, forklifts, generators, and fuel, while lifting equipment directly to the flight deck. Key technical requirements include maintaining a controlled environment per NSTM Chapter 634, providing illumination of at least 50 foot candle power, and ensuring four complete air exchanges per hour. Additionally, a 24-hour watch is required to monitor the enclosure, and the structure must be constructed from lightweight, fire-resistant materials that do not exceed a point load of 1600 lbs/sq ft.

General Info

Contract Value

$499,381.1

NAICS

336611 - Ship Building and Repairing

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nssa/dla
ContactsNo contacts available
OfficeNORFOLK, VA, 23511-2124, USA
Office AddressNORFOLK, VA, 23511-2124, USA
ContactsNo contact information available

Full Description

Show more
DESCRIPTION OF SERVICES NEEDED:1. Request a containment enclosure, setup, and maintained operating with electrical lights, climate control equipment, to support flight deck nonskid replacement. The Containment Enclosure dimensions shall be 320 feet by 85 feet. Initial setup with TWO moves, shall be accomplished on board the ship's flight deck. Duration of Enclosure's operation is 30 days. Early assembly on the pier will not be authorized due to homecoming. Assembly will be 7 days. Disassembly will be 7 days. A. The containment enclosure structure must be modular in design and configurable if necessary to change the length.B. The structure shall be easily movable in a safe, controlled manner, using small forklifts and / or manpower without major disassembly, or breakdown, to minimize setup delays.C. The containment enclosure shall be constructed of light weight fire resistant materials, designed to distribute the load over the covered area, and protect the new coatings from contamination / damage. The total weight of the enclosure system must allow for a maximum point load of 1600 lbs/sq ft. Pneumatic tires with wheels must be soft enough to prevent damage to the new non-skid.D. Structure shall be capable of spanning up to 320 feet long by 85 feet wide, without internal support in contact with the deck. Internal deck areas must be unobstructed to allow access with ten feet tall clearance as a minimum clear height. The structure shall have as a minimum, one sealable access opening at each end, ten feet tall by twelve feet wide. E. Structure and containment fabric shall be capable of withstanding 70 mph winds. Provide one 24 hour a day watch to monitor and control maintenance of the enclosure, including operation when environmental conditions are critical inside.F. Containment fabric shall be easily repairable, sealable, and capable of containing and excluding pollutants. Provide and maintain access for other contractor's services as required.G. CHECK POINT (V) (G) Environmental Conditions Set. (At Initial set and Reset) Containment enclosure shall establish and maintain a controlled environment in accordance with NSTM Chapter 634, including table 634-3-6, found under paragraph 634-3.26.H. CHECK POINT (V) (G) No Leaks Allowed. (At Initial Set and Reset)The enclosure shall include / provide an integral watertight seal around the base, capable of conforming to the deck and excluding all water from the inside work areas.I. Provide Illumination inside the containment. Light shall be a minimum of 50 foot candle power at the working surface.J. Provide Air exchange, as a minimum of 4 complete exchanges per hour.2. The contractor shall be self sufficient. All support equipment such as a crane, fork lifts, man lifts, generators, and fuel, shall be included. Electrical power may be purchased from NAVFAC MIDLANT: POC is Paul Milbourn, +1 (555) 000-0000. Setup an account for labor and commodities with the comptroller at least one week in advance at +1 (555) 000-0000, X-3184 or X-3186.3. The contractor will be required to construct and set the required environmental conditions of the enclosure initially over the landing area, plus TWO additional move and reset of environmental conditions, as directed by the SUPERVISOR. 4. The contractor shall lift equipment directly to and from the flight deck due to Aircraft Elevator scheduled maintenance. Ship's Force will provide 150 FT of Pier Lay down area.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS