Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on April 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement

Closed
69056725B000014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 3 days

General Info

Agency

Department Of Transportation → 690567 Western Federal Lands DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Forks, WA, USA

Set-Aside

SBA

Documents

(16)

Corridor Model Component Quantities Report - Earthwork

PDFother

Geotechnical Memo 1024 Technical Review & Culvert Recommendations WA JEFF 134309(1)

PDFgeotechnical-memo

Solicitation 69056725B000014 Bid Opening Summary WA FLAP JEFFER 134309(2)

PDFbid-opening-summary

QandA_03.31.2026 for Trout Creek Culvert Replacement

PDFq-and-a

Solicitation 69056725B000014 Two Trout Creek Culvert Replacement IFB

PDFifb

WA FLAP JEFFER 134309(2) Two Trout Creek Culvert Replacement SWPPP

PDFswppp

WA FLAP JEFFER 134309(2) Two Trout Creek Culvert Replacement Cross Section Cover Sheet

PDFother

waa-jeffer134309-2 Proposed Alignment Review Report

PDFalignment-review-report

Physical+Data.zip

ZIP

WA FLAP JEFFER 134309(2) Two Trout Creek Culvert Replacement Plans

PDFplans

Bid Tabulations WA FLAP JEFFER 134309(2)

PDFbid-tabulation

Two Trout Creek Crossing Aquatic Organism Passage Hydraulics Report

PDFreport

Amendment A001 to Solicitation 69056725B000014 for Two Trout Creek Culvert Replacement

PDFamendment

Solicitation 69056725B000014 Bid Opening Summary for WA FLAP JEFFER 134309(2)

PDFbid-opening-summary

WA FLAP JEFFER 134309(2) Survey Control Points Sheet

XLSXspecifications

WFLHD Construction Contract Administration FY23 V2

PDF1 pagecontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Organization / Agency
Department Of Transportation → 690567 Western Federal Lands Division
View Agency Profile
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

Update 04/22/2026: Bid Tabulations posted to attachments.


Update 04/22/2026: Bid Summary posted to attachments.


Update 03/31/2026: Amendment A001.pdf posted to attachments.


Update 03/31/2026: QandA_03.31.2026.pdf posted to attachments.


PROJECT: WA FLAP JEFFER 134309(2), Two Trout Creek Culvert Replacement


The Invitation for Bids (IFB), Plans, Physical Data, link to join bid opening virtually, and the Construction Contract Administration Document per FAR 36.211 are posted under Attachments/Links.


More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 541990
New
Federal
Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge Replacement
Solicitation # 69056726Q000038
Solicitation 69056726Q000038 is a request for quotations for post-construction environmental compliance monitoring services to support the MT FLAP BOR 2980(1) Sun River Bridge Replacement project in Augusta, Montana. This acquisition is a total small business set-aside issued by the Federal Highway Administration's Western Federal Lands Division. The scope of work involves executing eight specific tasks to ensure environmental compliance, including the removal of temporary controls once final stabilization of 70 percent revegetation is achieved, all in accordance with the project's Stormwater Pollution Prevention Plan. The anticipated period of performance runs from the date of award through November 30, 2027, with monthly inspections expected from November 2026 through the end of the term. The contract will be awarded using the Lowest Priced Technically Acceptable process, evaluating offers based on price, technical capability, and relevant past performance. Technical evaluation focuses on compliance with solicitation requirements and the qualifications of key personnel. Offerors must submit a price schedule, key personnel resumes, and work experience documentation. Administrative requirements include electronic invoicing via the Delphi iSupplier portal and adherence to the Service Contract Act wage determinations. Final deliverables are subject to a structured review process by the FHWA, with specific timelines for draft comments and final acceptance by the Technical Point of Contact.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS