Warren — Installation of a new flashing beacon and all-way stop at the intersection of Route 235 (Ridge Road) and Old Augusta Road in the Town of Warren.

Active
027034.00State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Maine Department of Transportation is soliciting bids for the installation of a new flashing beacon and all-way stop at the intersection of Route 235 (Ridge Road) and Old Augusta Road in the Town of Warren, Maine. This federally aided construction project falls under NAICS code 237310 and is governed by the State of Maine DOT Standard Specifications, March 2020 Edition, along with applicable federal regulations including 23 CFR Part 635, 29 CFR Part 3 (Davis-Bacon Act), and 41 CFR Part 60-4 (Equal Employment Opportunity). The contract requires full compliance with safety, labor, and environmental standards, including certified payroll submissions, adherence to wage determinations, and maintenance of records for three years post-completion. Contractors must provide 100% Performance and Payment Surety Bonds, maintain a minimum of 30% self-performance of the original contract value using their own workforce, and obtain written approval prior to subcontracting any work. All specialty items requiring unique equipment or expertise are exempt from the self-performance requirement but must still flow down prime contract obligations. The scope of work includes all construction activities necessary to implement the traffic control improvements at the specified intersection, with inspection and acceptance conducted both on-site and at the MaineDOT Laboratory using AASHTO testing methods such as T 27, T 11, T 255, and others to verify material compliance with gradation, density, and asphalt binder content criteria. The State of Maine DOT reserves the right to inspect all work and conduct samples during production and placement phases, with final acceptance determined by government inspectors. Contractors must follow MUTCD standards for sign retroreflectivity and utilize materials such as galvanized anchor rods, dielectric coatings, IP-67 rated connectors, and epoxy-coated aluminum to ensure long-term durability. While no explicit contract value is provided, pricing is structured as lump sum line items including plain riprap, loam, flagger hours, mobilization, and maintenance of traffic. Bids must be submitted by August 5, 2026, via electronic or paper formats, with required documentation including the Schedule of Items, Special Provisions, Contract Agreement, Bid Bond, and compliance certifications. The contract includes anti-retaliation protections for labor complainants, compliance with the Build America, Buy America Act, and Disadvantaged Business Enterprise participation requirements under 49 CFR Part 26. No contracting officer’s representative or

General Info

Install flashing beacon and all-way stop at Route 235 and Old Augusta Road with full DOT compliance and labor standards.

Agency

Maine Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Warren, ME, USA

Set-Aside

NONE

Documents

(5)

MaineDOT Notice to Contractors for Installation of Flashing Beacon at Route 235 and Old Augusta Road

PDFifb

Maine DOT Final Plans General Notes and Earthwork Summary

PDFcontract-document

Maine DOT Contract Bid Book Bidding Instructions

PDFrfp

Proposal 027034.00 Schedule of Items

PDFschedule-of-items

Contract 027034.00 Plan Holders List for Warren Flashing Beacon Installation

PDFplan-holders

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaine Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Maine Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of a new flashing beacon and all-way stop at the intersection of Route 235 (Ridge Road) and Old Augusta Road in the Town of Warren.
Located at the intersection of Route 235 and Old Augusta Road in Warren.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
ITB 26-141 Small County Outreach Program (SCOP) Milling & Resurfacing Project for E. Gospel Island Rd (CR 470) from N. Apopka Ave. to SR 44
Solicitation # 26-141
Citrus County, Florida, is soliciting bids for the milling and resurfacing of E. Gospel Island Road (CR 470) from N. Apopka Ave. to SR 44 under Solicitation Number 26-141, with a response deadline of September 15, 2026. The project, estimated at $4,142,947, involves removing approximately four inches of existing asphalt and placing a four-inch overlay using SP 12.5 and FC 12.5 asphalt mixtures with PG 76-22 polymer-modified binder, along with full restoration of pavement markings, signage, and road edge conditioning in compliance with FDOT Greenbook Design Standards, MUTCD, and AASHTO geometric standards. Work must be substantially completed within 90 days of the Notice to Proceed and finally completed within 120 days, under a unit-price contracting method with payment tied to verified quantities such as square yards milled and tons of asphalt placed. The county retains the right to inspect and accept work on-site, requiring Engineer Certification of Completion before formal acceptance. All bidders must operate as responsible entities with verified Unique Entity IDs, comply with strict cybersecurity, insurance, and ethical requirements, including mandatory $1,000,000 cyber insurance coverage maintained for three years post-completion, level II background checks for personnel, E-Verify usage for all employees, and full flow-down of debarment, EEO, and confidentiality clauses to all subcontractors. Insurance mandates include workers’ compensation and Longshoremen Act coverage, with certificates specifying 30-day cancellation notice and retroactive coverage aligned to contract start. Bidders must submit comprehensive documentation via the OpenGov portal, including certifications of insurance, qualifications, FDOT pre-qualification, asphalt mix design, and affidavits addressing human trafficking, conflict of interest, lobbying, and non-collusion. No size or socioeconomic status certifications are required, though DBE compliance is referenced in funding contexts. The award will go to the lowest responsive and responsible bidder whose proposal, evaluated holistically on qualifications, compliance, cost structure, and proposed subcontractor credibility, best serves the county’s interest, with no formal LPTA designation applied. The project is federally aided and governed by FDOT and FHWA guidelines, with all contractual obligations surviving completion, and no options or extensions provided.
Technical Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
B027-17 CDBG Sidewalks, Curbs and Ramps
Solicitation # B027-17
The contract B027-17 CDBG Sidewalks, Curbs and Ramps, issued by the Economic Development agency of Connecticut through the City of Meriden, will fund the construction of approximately 8,200 square feet of new sidewalk, 1,650 square feet of driveway apron, 1,620 linear feet of concrete curb, and 750 square feet of handicap-accessible ramps to improve pedestrian infrastructure and accessibility. The solicitation was posted on August 1, 2026, with responses due by August 25, 2026, and is classified as a public works project subject to Connecticut’s prevailing wage law under General Statutes Section 31-53, requiring all contractors and subcontractors to pay workers the legally mandated wage rates for the region and trade. In addition to wage compliance, all mechanics, laborers, and on-site workers must complete a 10-hour OSHA construction safety and health course, with proof of completion required for contract compliance, ensuring adherence to federal and state workplace safety standards. The project is funded through the Community Development Block Grant program and is subject to enforcement by the Connecticut Department of Labor, with noncompliance potentially resulting in contract termination or financial penalties. All work is to be performed within the City of Meriden, Connecticut, and contract inquiries should be directed to Susan Martel, Contract Specialist, or Rawle Dummett, Procurement officer, using the contact information provided.
Economic Development

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Cold Planing (Milling) of Existing PavementThe contract calls for the removal of the existing asphalt surface through cold planing or milling operations to prepare the pavement for resurfacing. This includes the complete removal of the aged or damaged asphalt layer using specialized cold planing equipment, followed by thorough cleanup and responsible disposal of all debris generated during the process. The work must be performed to ensure a smooth, even, and contamination-free surface that meets the required standards for the subsequent paving phase. All materials removed must be transported and disposed of in compliance with local and environmental regulations, and the contractor is responsible for managing the entire process from start to finish without disruption to surrounding areas. The contract is classified as a subcontract under NAICS code 237310 for Highway, Street, and Bridge Construction, issued by the County of Maui in Hawaii. It was posted on August 1, 2026, with a response deadline of September 5, 2026. The opportunity is available through the PublicPurchase platform, and bidders are expected to submit proposals addressing the scope, equipment, timeline, and waste management protocols. While no set-aside preferences or organizational type restrictions are specified, compliance with all contractual obligations and safety standards is mandatory. The place of performance is within Maui County, though exact location details are not provided in the posting.
County of Maui

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Maine Department of Transportation

Same awarding agency

NAICS: 332996
SLED
Bridge Bearing Supply (AASHTO M251)The contract involves the supply of elastomeric bridge bearings that must comply with AASHTO M251 standards, ensuring the components meet rigorous highway engineering specifications for durability, load capacity, and performance under environmental stress. The solicitation is issued as a subcontract by the Maine Department of Transportation, specifically targeting performance at Swanville, with a deadline for responses set for August 12, 2026. The North American Industry Classification System code 332996 identifies the relevant manufacturing sector for other fabricated metal product manufacturing, indicating the specialized nature of the required bearings. The contract does not specify a set-aside designation, meaning it is open to all eligible suppliers without preference for small, minority-owned, or other categorized businesses. The posting date is July 22, 2026, providing a three-week window for bids to be prepared and submitted. All technical requirements are tied directly to AASHTO M251, which governs material composition, dimensional tolerances, testing protocols, and certification procedures for elastomeric bearings used in bridge structures. The sole point of reference for submission details is the official Maine DOT bid opportunities webpage, where interested parties must access full documentation and ensure adherence to all procedural requirements.
Fabricated Pipe and Pipe Fitting Manufacturing

POSTED

11 days ago

DEADLINE

in 10 days
View Details