Wastewater Pipeline Installation & Replacement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract for the City of El Segundo involves the installation, replacement, and repair of wastewater infrastructure. The selected contractor will be responsible for trenching, pipe laying, bedding, backfilling, and connecting wastewater lines using PVC, ductile iron, or RCP piping, while adhering to Specifications No. PW 25-20 and utilizing appropriate shoring and shielding equipment. The final deliverable is a fully installed and tested wastewater pipeline system. Eligible bidders must hold a California State Contractor License Class A or C-34. The project is located in El Segundo, California, and falls under NAICS code 237990. Interested parties must submit their responses by the deadline of September 30, 2026.

General Info

Wastewater infrastructure installation in El Segundo; Class A/C-34 license required by September 30, 2026.

Place of Performance

El Segundo, CA, 90245, USA

Set-Aside

NONE

Documents

This scope was carved out of PW 25-20.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wastewater Infrastructure Improvements Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of El Segundo
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation, replacement, and repair of wastewater infrastructure for prime contractors on City of El Segundo public works projects. Executes trenching, pipe laying, bedding, backfilling, and connecting wastewater lines per Specifications No. PW 25-20. Utilizes sewer piping (PVC, ductile iron, or RCP) and trench shoring/shielding equipment. Requires California State Contractor License Class A or C-34. Delivers installed and tested wastewater pipeline system.

More opportunities from California → City of El Segundo

Same awarding agency

NAICS: 237310
SLED
Douglas Street Intersection Improvements And Vista Del Mar Improvements Project
Solicitation # PW 26-12
The City of El Segundo is soliciting bids for the Douglas Street Intersection and Vista Del Mar Improvements Project (PW 26-12), which involves comprehensive infrastructure upgrades in El Segundo, California. The scope of work includes the removal of existing surfaces, asphalt concrete construction, and the installation of sidewalks and curb ramps. Key safety and traffic enhancements include the installation of solar-powered flashing traffic control devices, vehicle speed feedback signs, sequential dynamic curve warning systems, transverse raised rumble strips, and general signing and striping. Work is specifically located at the Douglas Street intersections of Utah Avenue and Alaska Avenue, and along Vista del Mar from 800 feet south of Grand Avenue to 1000 feet north of 45th Street. The contractor is responsible for all demolition, excavation, site preparation, utility cover adjustments, and the restoration of damaged property and landscaping. Bids are due by November 18, 2026, at 11:00 am, and must be submitted in a sealed opaque envelope to the City Clerk's office. The City will award the contract to the lowest responsive and responsible bidder. Mandatory requirements include a pre-bid meeting on October 28, 2026, the provision of a proposal guarantee bid bond, and the submission of performance and payment bonds. Contractors must comply with State prevailing wage rates for Los Angeles County, ADA requirements for pedestrian push buttons, and LA RWQCB NPDES MS4 and California Construction General Permits for water quality. The City will retain 5% of each progress payment, and final acceptance is contingent upon a final sign-off from the Department of Planning and Building Safety and a complete site clean-up.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 21 days
View Details
NAICS: 541620
SLED
Field Investigation, Post-Closure Land Use Plan/Site Remediation And Maintenance Plan Development, And Lea/Calrecycle Support For Recreation Park
Solicitation # RFP 26-08
The City of El Segundo is soliciting proposals from qualified environmental and geotechnical consulting firms for RFP 26-08 to conduct field investigations and post-closure land-use planning for the former General Tile disposal site located at 430 Sheldon Street within Recreation Park. The scope of work involves addressing data gaps regarding landfill cover conditions, disposal area extent, and landfill gas presence. Key deliverables include supplementing the Phase I Office Investigation, executing a Phase II Field Investigation Work Plan, and developing a Post-Closure Land Use Plan and a Site Remediation and Maintenance Plan. All work must comply with DTSC protocols and be coordinated with the Local Enforcement Agency and CalRecycle. Proposals are due by November 19, 2026, at 11:00 a.m. PDT, and must be submitted as one PDF via email and five hard copies to the City Clerk. Submissions are limited to 30 pages, excluding one sample report. The City will use a ranking process based on qualifications and a not-to-exceed cost proposal to select a consultant, with the final award made by the City Council. The successful firm will enter into a Professional Services Agreement and must adhere to California Labor Code prevailing wage requirements, maintain specific insurance policies, and follow strict health and safety protocols regarding waste handling and utility clearance.
Environmental Consulting Services

POSTED

14 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS