Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Process Engineering and Design Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for Wastewater Process Engineering and Design Services involves providing technical engineering design for wastewater plant upgrades on City of Banning projects. The selected professional must hold a PE license to conduct hydraulic analysis and process modeling that adheres to Title 22 tertiary recycled water requirements and standards set by the RWQCB, DDW, and SAWPA. The scope of work includes the development of Basis of Design reports and the production of signed PS&E packages at the 30, 60, and 100 percent completion stages. The final deliverables consist of the completed Basis of Design report and the final signed PS&E package. Responses for this opportunity are due by September 25, 2026.

General Info

PE licensed engineering for Banning wastewater plant upgrades; PS&E packages due September 25, 2026.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-26-139.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP 26-139 - Wastewater Treatment Plant & Recycled Water Upgrades

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Purchasing Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical engineering design for wastewater plant upgrades for prime contractors on City of Banning projects. Conducts hydraulic analysis and process modeling to meet RWQCB, DDW, and SAWPA standards and Title 22 tertiary recycled water requirements. Develops Basis of Design reports and produces 30%, 60%, and 100% signed PS&E packages. Requires PE license. Delivers final signed PS&E package and BOD report.

More opportunities from California → Purchasing Division

Same awarding agency

NAICS: 237110
New
SLED
IFB-26-135 Well C-4 Rehab, Pre & Post Video Survey, Brush & Bail, and Reinstallation
Solicitation # IFB-26-135
The City of Banning is soliciting bids for the rehabilitation of Well C-4 under solicitation IFB-26-135. The scope of work includes pulling, tearing down, and evaluating the pump and motor, performing 40 hours of brush and bail cleaning with mix and injection through a dual swab, and the reinstallation of a Goulds 16 Stage Bowl Assembly and a new manufactured head with a 12-inch discharge. Key deliverables include three separate video surveys (pre-video, post-brushing/bailing, and post-chemical treatment), 20 hours of test pumping with an on-site operator, and the provision of two Baker tanks. The project is governed by the laws of the State of California and adheres to the 2024 Standard Specifications for Public Works Construction. The contract will be awarded to the lowest responsive and responsible bidder, with a 5% bid preference applied to businesses located within the City limits. Bidders must be registered with the California Secretary of State and the Department of Industrial Relations, and they must provide a 10% bid bond. The successful contractor is required to provide faithful performance and payment bonds, and a 5% retention will be applied to payments. Compliance requirements include CARB certification, prevailing wage adherence per California Labor Code, and strict adherence to City MS4 permit and water quality standards for all discharges. All bids and required documentation, including the vendor packet and certifications, must be submitted electronically by the deadline of November 6, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS