This Solicitation opportunity from Massachusetts was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Treatment Upgrades IFB

Closed
BD-26-1627-BOS17-BOS17-128687State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 17 hours ago

DEADLINE

in 15 days

General Info

Place of Performance

Washington Street Holliston, MA, 01746, USA

Set-Aside

NONE

Documents

1

Wastewater Treatment Plant Conversion IFB - Town of Holliston

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → BOS17 - Board of Selectmen
Contacts1 person available
OfficeWashington Street Holliston, MA, 01746, USA
Office AddressWashington Street Holliston, MA, 01746, USA
Contacts
Chris MeoPurchaser

More opportunities from Massachusetts → BOS17 - Board of Selectmen

Same awarding agency

NAICS: 237110
New
SLED
WWTP Yard Piping Phase 1D
Solicitation # BD-27-1627-BOS17-BOS17-134664
The Town of Holliston, Massachusetts, is soliciting bids for the WWTP Yard Piping Phase 1D project, which involves the installation of approximately 1,200 linear feet of PVC piping serving three wastewater effluent tanks and treatment units at the Wastewater Treatment Plant located at 100 Linden Street. The scope of work includes the installation of six concrete ADA ramps with detectable warning panels at specific crosswalks on Washington Street. Technical requirements specify that gravity piping must undergo low air pressure testing per Section 40 23 00, while pressure dosed force mains do not require hydrostatic testing. The contract will be awarded to the lowest responsive and responsible bidder based on the total quote amount. To be considered, bidders must provide at least three references for similar projects completed within the last five years and submit several certifications, including a Certificate of Good Faith and Non-Collusion, a Certificate of Tax Compliance, and a Certification Regarding Labor Harmony and OSHA Training. The project is governed by the laws of the Commonwealth of Massachusetts and requires compliance with prevailing wage rates under Massachusetts General Laws, chapter 149. All employees must have completed a 10-hour OSHA-approved construction safety and health course. Contractors are required to maintain comprehensive commercial general liability insurance with limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Payment terms are set at thirty days from the receipt of an invoice, and all payments are subject to appropriation certification by the Town Accountant. The contractor must guarantee the quality of workmanship and materials for one year following final payment. Sealed bids are due by 10:00 AM on November 12, 2026, at the Town Manager's Office in Holliston.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Holliston WWTP Phase 1D - Yard Piping
Solicitation # BD-27-1627-BOS17-BOS17-134222
The Town of Holliston is soliciting open market bids for the Holliston Wastewater Treatment Plant Phase 1D Yard Piping project. The scope of work involves the installation of approximately 1,200 linear feet of PVC piping, extending from the plant foundation wall to two feet into the interior of various tank pipe sleeve connections. Key deliverables include the furnishing and installation of yard piping, wall penetration coring, sleeves, interior piping, and full site restoration. All work must be completed within six weeks of contract authorization and must adhere to OSHA, National Electrical Code, and Massachusetts State Building Codes, as well as local Conservation District regulations for erosion and sediment control. The contract will be awarded as a lump sum to the lowest responsive and responsible bidder. To be considered, submitters must provide at least three references for similar work completed within the last five years and certify that all onsite employees have completed a 10-hour OSHA construction safety course. Bidders must also comply with Massachusetts prevailing wage laws and provide a certificate of tax compliance. Required insurance includes comprehensive commercial general liability with minimum limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Written quotes, including a signed Certificate of Good Faith and Non-Collusion, are due by 10:00 AM on October 30, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS