Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Water & Sewer Utilities

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Conservation HaltonView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of 082026.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Kelso / GE - West Beginner Lodge Construction - CH

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConservation Halton
ContactsNo contacts available
OfficeN/A
Organization / Agency
Conservation Halton
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs site water distribution, sanitary force mains, and pipe culverts for prime contractors on Conservation Halton facility projects. Performs installation of water utility distribution piping (33 11 16), sanitary utility sewerage force mains (33 34 00), and pipe culverts (33 42 13). Delivers a functional onsite water and sewage utility network.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Conservation Halton

Same awarding agency

NAICS: 541370
New
International
CONTROLLED ACCESS CORRIDOR CROSSING SURVEY - CH
Solicitation # 091726
Conservation Halton has issued a solicitation for the survey and documentation of up to 280 watercourse crossing structures located within controlled and restricted access corridors. The project encompasses three railway corridors including CN, CKPC, and Metrolinx, five provincial highway corridors including Highway 401, 403, 6, 5, and the QEW, and the privately operated Highway 407 ETR. The primary objective is to collect accurate data to support future hydraulic modelling and flood hazard mapping, which will inform regulation limit mapping, permit reviews, and flood mitigation planning. The work is divided into two priority phases, with Priority 1 tasks targeted for completion in late 2026 and early 2027, and Priority 2 tasks scheduled for 2027. The contract will be awarded to a single proponent based on best value, evaluated through a three-step process consisting of mandatory requirements, point-rated technical criteria, and financial evaluation. Technical scoring is weighted between experience, qualifications, approach, methodology, and schedule, while pricing accounts for 50 percent of the total evaluation. Proponents must demonstrate specific experience working within 400-series highways and railway right-of-ways and must hold a Certificate of Authorization from the PEO or AOLS. Key requirements include the implementation of a comprehensive QA/QC program, adherence to specific GIS data standards, and the maintenance of 10 million dollars in comprehensive general liability insurance. Payment is structured via monthly progress billings with a 30-day payment term.
Surveying and Mapping (except Geophysical) Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS