Water Diversion Plan (Contractor-Designed)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the design and implementation of a temporary water diversion system to enable construction activities in wetland or water-affected areas, ensuring that work can proceed without disrupting natural hydrology or violating environmental regulations. The system must be contractor-designed, allowing for engineering flexibility and site-specific adaptation, and must meet all applicable environmental standards under the oversight of the Kentucky Department of Environmental Protection. The scope focuses solely on temporary measures, requiring the contractor to plan for efficient installation, safe operation, and full removal upon project completion without leaving permanent alterations or environmental harm. The solicitation is issued as a subcontract under NAICS code 541320, indicating it pertains to engineering services, and is open for responses until August 31, 2026. While the place of performance is listed as “Other,” it implies work will occur across multiple sensitive environmental sites within Kentucky, requiring coordination with local conditions and regulatory frameworks. There is no set-aside designation, meaning all eligible contractors may bid, and the lack of a specified point of contact suggests submissions and inquiries should be directed through the provided online portal. The contract emphasizes compliance, environmental stewardship, and technical precision in the execution of water management solutions during infrastructure development phases.

General Info

Contractor designs temporary water diversion system for Kentucky wetlands, ensuring environmental compliance and full removal after completion.

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

541320 - Landscape Architectural ServicesView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB 785 2600000643.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2600000643-5 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and implementation of a temporary water diversion system to allow construction in wet areas.

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
SLED
RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Solicitation # RFB-785-2600000643
The Commonwealth of Kentucky Department of Environmental Protection is soliciting bids for the Willisburg Lake Dam Rehabilitation Project in Washington County, identified as RFB-275-26 or RFB-785-2600000643-8. The comprehensive scope of work includes the construction of a reinforced concrete auxiliary spillway and floodwall, the installation of rockfill stability berms, and the replacement of low-level drawdown valves. Additional requirements involve the remediation of concrete cracking and seepage, the abandonment and replacement of raw water intake lines, spillway culvert remediation, and various demolition, site preparation, and restoration activities. Contractors are also responsible for erosion control, traffic control, and the development of a contractor-designed water diversion plan. The solicitation process has undergone multiple modifications and addenda, with the final bid response deadline set for September 17, 2026, at 17:30. Bids must be submitted exclusively online, with the official bid document and bid bond combined into a single PDF file. Key technical constraints include a prohibition on driving piles into the dam embankment and the rejection of specific waterproofing material substitutions that do not meet puncture requirements. Notably, the project is exempt from domestic material requirements such as Buy America or American Iron and Steel. Primary contact for the project is Susan Ward, and the contract is managed through the Kentucky Department for Facilities and Support Services.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS