Water Utility Piping and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26322B12.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Engineering - Utilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs public water distribution piping for prime contractors on Effingham County Board of Commissioners water facility projects. Installs 12-inch PVC piping, flanged piping, valves, fittings, and hydrants using utility pipe jacking. All materials must be NSF 61/372 certified. Requires potable water installation certification. Delivers operational water main connections to the elevated tank.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is governed by EJCDC standard general and supplementary conditions. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide bid security equal to 5 percent of their maximum bid price and are required to furnish performance and payment bonds upon award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner. Quality assurance is maintained through rigorous inspection standards, including compliance with AWS, SMACNA, NEMA, and ASTM specifications.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Georgia → Engineering - Utilities

Same awarding agency

NAICS: 237110
New
SLED
Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank
Solicitation # 26322B12
Effingham County is soliciting bids for the construction of a 1.5-million-gallon concrete composite elevated water storage tank as part of its Regional Water Supply Facilities project. The scope of work encompasses all labor, materials, and equipment required for a fully operational facility, including the tank foundation, erection, site clearing, grading, and the installation of 12-inch PVC water mains and connections to the existing 16-inch main. The project also requires a comprehensive electrical and SCADA system, including pressure monitoring, lighting, and cybersecurity compliance with ISA/IEC 62443 standards. Additional requirements include tank coating, painting, disinfection, bacteriological testing, and site restoration. The contract must be completed within 460 calendar days from the receipt of a Notice to Proceed. Bids are due by December 10, 2026, via the OpenGov eProcurement Portal, and are only accepted from firms that attended the mandatory pre-bid conference on November 17, 2026. Financial security requirements include a bid bond of at least 5 percent of the total bid, with the successful contractor providing performance and payment bonds equal to 100 percent of the contract amount within 14 days of the award. Bidders must certify compliance with Georgia's drug-free workplace laws and the Immigration and Nationality Act. Payment will be processed monthly based on itemized expenses submitted to the Architect and Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS