Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SCADA and Process Control Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26322B12.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Engineering - Utilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and integrates SCADA systems for prime contractors on Effingham County Board of Commissioners water facility projects. Installs PLCs, HMIs, pressure transducers, and differential pressure gauges, including software configuration and onsite testing. Requires compliance with ISA-5.1 and ISA-101.01 standards. Delivers operational SCADA system with O&M manuals and record drawings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is seeking professional design services for the Etnies Skatepark Improvement Project (25P03) located at 20028 Lake Forest Drive. The selected consultant will refine two preliminary concept designs into a final concept and develop a complete, permit-ready, and bid-ready construction package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to the street lane, plaza, and various bowls, the replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing building renovation project and develop a construction phasing plan that minimizes operational disruptions. The contract is structured on a time and materials, not-to-exceed basis, with monthly invoicing and a 30-day payment term. Award selection is based on a multi-phase evaluation involving mandatory compliance checks, a qualitative proposal review, and a weighted final score consisting of interviews (80 percent) and cost proposals (20 percent). Requirements include the identification of key personnel such as a Project Manager, Lead Skatepark Designer, and Civil Engineering Lead, all of whom must hold necessary California professional licenses. Additionally, the consultant must comply with California prevailing wage laws, register with the Department of Industrial Relations, and ensure all designs meet ADA standards. Proposals are due by December 4, 2026, via the City's eProcurement portal.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details

More opportunities from Georgia → Engineering - Utilities

Same awarding agency

NAICS: 237110
New
SLED
Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank
Solicitation # 26322B12
Effingham County is soliciting bids for the construction of a 1.5-million-gallon concrete composite elevated water storage tank as part of its Regional Water Supply Facilities project. The scope of work encompasses all labor, materials, and equipment required for a fully operational facility, including the tank foundation, erection, site clearing, grading, and the installation of 12-inch PVC water mains and connections to the existing 16-inch main. The project also requires a comprehensive electrical and SCADA system, including pressure monitoring, lighting, and cybersecurity compliance with ISA/IEC 62443 standards. Additional requirements include tank coating, painting, disinfection, bacteriological testing, and site restoration. The contract must be completed within 460 calendar days from the receipt of a Notice to Proceed. Bids are due by December 10, 2026, via the OpenGov eProcurement Portal, and are only accepted from firms that attended the mandatory pre-bid conference on November 17, 2026. Financial security requirements include a bid bond of at least 5 percent of the total bid, with the successful contractor providing performance and payment bonds equal to 100 percent of the contract amount within 14 days of the award. Bidders must certify compliance with Georgia's drug-free workplace laws and the Immigration and Nationality Act. Payment will be processed monthly based on itemized expenses submitted to the Architect and Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS