Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on May 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Welding and Structural Repairs

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332420
New
SLED
2026 Fuel Tanks
Solicitation # 2026-31
The Washington County Board of Commissioners in Georgia is soliciting bids for a complete, code-compliant bulk fuel storage and dispensing system for an on-site facility. The project requires the supply and delivery of two 10,000-gallon UL-2085 fire-rated, double-wall aboveground storage tanks, one for gasoline and one for ultra-low-sulfur diesel. The scope of work includes all necessary piping, fittings, valves, emergency shutoffs, and a keyed fuel control and tracking system featuring software and reporting capabilities. All equipment must be new, include manufacturer certifications, and comply with NFPA 30/30A, EPA 40 CFR Part 112 (SPCC), and local fire codes, with meters being NTEP certified for commercial use. Bids must be submitted in writing by December 14, 2026, and will be evaluated primarily on total evaluated price, with high importance placed on delivery lead time and medium importance on warranty, service, and vendor experience. Contractors must provide a minimum 60-day quote validity period and evidence of three recent comparable installations. Required documentation includes an E-Verify Affidavit, a SAVE Affidavit, and a Certificate of Insurance listing the Washington County BOC as an additional insured, with minimum liability limits of $1,000,000 per occurrence. The contract allows the County to terminate the agreement with 10 days' written notice and requires the contractor to repair or replace defective workmanship for one year following final completion.
Washington County Board of Commissioners

POSTED

3 days ago

DEADLINE

in 27 days
NAICS: 332420
New
Federal
Storage Tank AND SUPPLIES - FORT BRAGG
Solicitation # W911S227U0178
Solicitation W911S227U0178 is a Request for Quotation for the procurement of new commercial equipment and supplies to support Fort Bragg. This acquisition is a Total Small Business Set-Aside and requires the delivery of a 6000 gallon Norwesco white vertical storage tank, along with associated hardware including a Hayward bulkhead tank fitting, Kuriyama acid/chemical and DEF UHMWPE tubing, AMT pumps, and various stainless steel pipe nipples and fittings. The government will award the contract to the responsible offeror whose proposal is most advantageous based on price and technical evaluations. Only new equipment is acceptable, and used or remanufactured products will be rejected. Offers must be submitted exclusively through the PIEE Solicitation module and must include technical and price proposals, as well as a completed certification of the country of origin. While the solicitation is brand name or equal, any proposed equal products must meet all specified salient physical, functional, or performance characteristics and be supported by descriptive literature. Delivery is required on an F.O.B. destination basis, with a preferred delivery timeline of within 30 days. Compliance with various federal regulations is mandatory, including Buy American standards, sustainable product requirements, and specific cybersecurity and telecommunications prohibitions.
W6QM Micc-Ft Drum

POSTED

4 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Santa Clarita Valley Water Agency is seeking a subcontractor for a project titled Welding and Structural Repairs. The scope of work involves performing limited grinding and weld repairs on corroded sections of a tank's floor, walls, and roof welds to ensure surfaces are properly prepared for the application of coating. This opportunity was posted on May 23, 2024, and requires responses to be submitted by the deadline of July 2, 2024. The project is categorized under NAICS code 332420.

General Info

Subcontractor needed for tank welding and structural repairs by July 2, 2024.

Documents

This scope was carved out of Ridge Route (Castaic 1A) Water Storage Tank Coating Project.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ridge Route (Castaic 1A) Water Storage Tank Coating Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Forging Tooling ProductionOpen now, due in 8 days
  • 2026 Fuel TanksOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Limited grinding and weld repairs on corroded areas of tank floor, walls, and roof welds to prepare surfaces for coating application.

More opportunities from California → Santa Clarita Valley Water Agency

Same awarding agency

NAICS: 237110
SLED
S Wells PFAS Groundwater Treatment and Disinfection Facility Project
Solicitation # 2022110376
The S Wells PFAS Groundwater Treatment and Disinfection Facility Project, identified by project number 1910240-002C and solicitation number 2022110376, is being implemented by the Santa Clarita Valley Water Agency in Los Angeles County. Funded by the State Water Board, the project aims to restore the use of Wells S6, S7, and S8 to reduce dependency on imported water. The scope of work includes the construction of a per- and polyfluoroalkyl substances groundwater treatment and disinfection facility, a chloramine disinfection building, a new groundwater well (S9), and an underground 12-inch drainage pipeline connection with approximately 2,100 linear feet of associated pipelines. Additionally, the project involves critical upgrades to existing Wells S6, S7, and S8, specifically the replacement of submersible pumps and electrical panel upgrades. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Administrative oversight is led by Principal Engineer Orlando Moreno. The project is located across multiple parcels in Santa Clarita, including Assessor's Parcel Number 2811-066-902. Financing for the project was approved by the State Water Board on July 23, 2026, following an initial Notice of Determination filed on August 20, 2025.
Water and Sewer Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS