Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Well 20A Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Atwater is undertaking the Well 20A Construction project to replace the failed potable Well 20. The scope of work involves drilling a new well, designated as Well 20A, at the same site as the original well and subsequently destroying Well 20. Well 20A is designed to maintain a capacity similar to the original well, ensuring there is negligible or no expansion of capacity. The new well will be integrated into the City of Atwater's distribution system for potable water use and will feature a treatment system utilizing granular activated carbon to remove 1,2,3-trichloropropane. The project is located at 709 Rancho Vista Dr., Atwater, California 95301, and falls under NAICS code 237110. On September 2, 2025, the State Water Resources Control Board issued a domestic water supply permit amendment and plan approval for the project. Additionally, a Notice of Exemption was issued based on California Code of Regulations section 15302, classifying the project as a replacement or reconstruction. Primary points of contact for the project include District Engineer Orlando Gonzalez and Public Works Director Justin Vinson.

General Info

Atwater replaces Well 20A with new potable well and granular activated carbon system for 1,2,3-TCP removal, approved under CA CEQA Class 2 exemption.

Agency

California → City of Atwater

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Green Sands Ave.and Valle Grande Dr., Atwater, CA, 95301

Set-Aside

NONE

Documents

(1)

CA2410001 Well 20A Permit Amendment Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Atwater
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Atwater
Office AddressN/A
Contacts
Orlando GonzalezDistrict Engineer
Justin VinsonPublic Works Director

Full Description

Show more
Existing potable Well 20 failed. Project includes a new Well 20A drilled at the same site as Well 20 and destroying Well 20. The capacity of Well 20A is designed to be close to the capacity of Well 20. Well 20A will be treated to remove 1,2,3-trichloropropane with granular activated carbon. The well is for potable water use into the City of Atwater’s distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project emphasizes the inclusion of M/W/DBE subcontractors, with James W. Fowler Co. offering assistance in obtaining bonding, insurance, and necessary equipment. Quality control testing is a required component of the subcontract pricing, and the utilization of apprentices is encouraged. All negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS