West Oakland Specific Plan

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mandela Station Mixed-Use Development project, located at 1451 7th Street in Oakland, California, involves the remediation of soil contaminated with metals, polycyclic aromatic hydrocarbons, and polychlorinated biphenyls at the West Oakland BART Station. Under a Remedial Action Plan approved by the Department of Toxic Substances Control, the project will excavate approximately 18,200 cubic yards of soil to support the T-1, T-3, and T-4 development projects and the T-2 Plaza. Of this volume, 8,550 cubic yards of contaminated soil will be transported to offsite waste disposal facilities via licensed haulers, while 9,650 cubic yards of clean soil will be used for backfilling. Remaining soils will be managed through an engineered cap consisting of future structures and hardscape, supported by a Land Use Covenant and an operation, maintenance, and monitoring plan that includes annual inspections and five-year reviews. The project is governed by the City of Oakland as the lead agency and adheres to the West Oakland Specific Plan Environmental Impact Report. Performance is subject to strict environmental and safety standards, including the use of low VOC coatings, compliance with California Air Resources Board off-road diesel regulations, and the implementation of site-specific health and safety plans conforming to federal and Cal/OSHA regulations. Construction activities are restricted to specific hours, with extreme noise activities limited to 8:00 a.m. to 4:00 p.m. The estimated schedule for soil testing, excavation, disposal, and re-grading is between five to eight weeks. Administrative oversight is managed by Project Manager Sarah Larese, with a Notice of Determination signed on August 26, 2025.

General Info

Excavate 18,200 cubic yards of contaminated soil, dispose of 8,550 cubic yards offsite, cap remainder, enforce land use covenant and ongoing monitoring in Oakland.

Agency

California → City of Oakland

Place of Performance

Oakland, CA, 94607

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oakland
Contacts2 people available
OfficeN/A

Full Description

Show more
The Department of Toxic Substances Control (DTSC) approved the Remedial Action Plan (RAP) for the Mandela Station Mixed-Use Development located on a portion of the West Oakland BART Station at 1451 7th Street in Oakland, California (Site). Soil at the Site was found to be impacted by metals (lead, arsenic, and mercury), polycyclic aromatic hydrocarbons (PAHs), and polychlorinated biphenyls (PCBs). To address impacted soil at the Site, the following remedial actions will be implemented: 1. Soil within the development areas where metals and chemicals are identified will be excavated and removed for construction of new buildings. Approximately 18,200 cubic yards of soil will be excavated from the Project Site to accommodate building foundations for the T-1, T-3 and T-4 development projects and the T-2 Plaza. Of this excavated soil, approximately 8,550 cubic yards of contaminated soil (or about 47%) will be transported to an appropriate offsite waste disposal facility, and the remaining 9,650 cubic yards of clean soil will be used to backfill the foundation excavations. 2. The remaining soils will be capped by future structures and hardscape features following redevelopment (i.e., an “engineered cap”). 3. If remaining soil within the development area contains metals or chemicals above cleanup goals, the engineered cap will be monitored regularly and maintained to protect the integrity of the remedy following protocols established in a future operation, maintenance, and monitoring plan. 4. A Land Use Covenant will be recorded which will restrict certain activities at the Site. 5. Annual inspections will be required based on the Land Use Covenant to ensure that all Site restrictions are followed. The City of Oakland, as Lead Agency, prepared the West Oakland Specific Plan Environmental Impact Report (EIR) and certified the Final EIR in 2014 (State Clearinghouse Number 2012102047). As Responsible Agency under the California Environmental Quality Act (CEQA), DTSC conducted an independent analysis of potential environmental impacts associated with the remediation activities identified in the RAP. DTSC prepared an Addendum to the Final EIR for the West Oakland Specific Plan incorporating the environmental evaluation of the proposed RAP remediation to the City’s Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 20 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 23 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS