Pot Belly Beach Rip Rap Revetment Repairs

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pot Belly Beach Rip Rap Revetment Repairs project, managed by the California Central Coast Regional Water Quality Control Board, focuses on restoring a damaged rip rap revetment at Potbelly Beach Road in Aptos, Santa Cruz County. The primary objective is to enhance public safety and protect homeowners by repairing the existing coastal infrastructure. The scope of work includes the recovery and re-stacking of 30 cubic yards of fugitive rip rap and the importation of an additional 338 cubic yards of rip rap to reinforce the revetment. Additionally, the project requires the removal of existing stairs and the installation of replacement stairs at the public access point located between house 26 and 28. The project is classified as a forecast under NAICS code 237990 and is categorically exempt under section 15301 for existing facilities, as the restoration does not cause environmental hazard damage. Administrative oversight is provided by Natalie P. Mayer, an Environmental Scientist with the Regional Water Quality Control Board. The performance site encompasses multiple addresses along Pot Belly Beach Road, and the project was formally documented via a Notice of Exemption dated August 25, 2025.

General Info

Repair and reinforce rip rap revetment at Potbelly Beach Road, replace stairs, exempt under CEQA Section 15301.

Agency

California → Regional Water Quality Control Board, Region 3 - Central Coast, San Luis Obispo

Place of Performance

Potbelly Beach Road, CA, 95003

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 3 - Central Coast, San Luis Obispo
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 3 - Central Coast, San Luis Obispo
Office AddressN/A

Full Description

Show more
The purpose of the project is to repair the existing revetment at Potbelly Beach Road to provide safety to home owners and the public. 30 cubic yards of fugitive rip rap is to be recovered and re-stacked on the existing revetment. 338 cubic yards of rip rap is to be imported and added to the revetment. Existing stairs on the revetment are to be removed and the stairs at the public access point between house 26 and 28 are to be replaced.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 24 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS