Permit No. 19687 – North Delta Fish Conservation Bank

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Permit No. 19687 authorizes the North Delta Fish Conservation Bank Phase 2 project within the Yolo Bypass in California, focusing on the restoration and enhancement of approximately 811 acres of habitat for native Delta fish species. The project involves lowering 4,500 linear feet of east-west drainage and irrigation berms to an elevation of 5.1 feet NAVD 88, excavating three subtidal breaches and channels along the northern edge of the bank, widening an existing breach to improve tidal connectivity, lowering a 20-acre floodplain to establish a tidal emergent marsh, removing a water control structure and culvert, controlling invasive aquatic weeds, and revegetating and protecting tule marsh and riparian zones. This work is conducted under California Code of Regulations, Title 23, Article 3, Section 6, as part of an adopted flood control plan and complies with the California Environmental Quality Act (CEQA) through the adoption of a Mitigated Negative Declaration. The project is managed by Reclamation District 2093 in coordination with the Central Valley Flood Protection Board and is executed by Liberty Island Holdings II, LLC as the applicant. Key contacts include Erik Vink of Trust for Public Land as the primary point of contact, Jordan Robbins of the Central Valley Flood Protection Board as a senior environmental specialist, and Kyrsten Shields as the Regulatory Director. The place of performance is located approximately three miles southwest of Courtland Road and Ryer Avenue in Yolo County, California, with coordinates at 38.32547° N, 121.68034° W. While the project was approved on August 21, 2025, and publicly posted on August 25, 2025, no contract value, pricing data, or federal acquisition regulations (FAR) clauses are included, as this is a state-level environmental mitigation initiative rather than a federal procurement. No formal delivery schedule, payment details, invoicing mechanisms, accounting codes, or subcontracting requirements are specified, and the process is regulatory and compliance-driven rather than competitive. Inspection and acceptance are determined on-site by the government agency based on adherence to the approved plan and CEQA mitigation measures, with no traditional contract administration provisions such as COR/COTR designations or performance incentives formally outlined.

General Info

Permit 19687 authorizes 811-acre habitat restoration in Yolo Bypass for Delta fish, including berm lowering, tidal channel excavation, and invasive species control.

Agency

California → Reclamation District 2093

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Permit No. 19687 - Notice of Determination for North Delta Fish Conservation Bank

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 2093
Contacts3 people available
OfficeN/A
Organization / Agency
California → Reclamation District 2093
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist (Specialist)
Kyrsten ShieldsRegulatory Director, Western Region
Erik VinkProgram Director

Full Description

Show more
Approval of Permit No. 19687, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To create and enhance approximately 811 acres of habitat for Delta native fish species within the Yolo Bypass by lowering approximately 4,500 linear feet of two east-west drainage and irrigation berms along the northern edge of the bank to approximately 5.1 feet NAVD 88; to excavate three subtidal breaches and channels along the northernmost edge of the bank; to widen a previously existing breach to improve circulation and tidal connectivity; to lower an approximately 20-acre floodplain along the northern boundary of the bank to create a tidal emergent marsh; to remove a water control structure and culvert along the northern edge of the bank; to control invasive aquatic weeds; and to revegetate, protect, and enhance tule marsh and riparian habitat. This project is the second phase of the Liberty Island Conservation Bank project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
(Resolicitation) Reclamation Construction for Sowbelly Gulch Project
Solicitation # JH27-1-1
The State of Utah, through the Division of Purchasing and the Division of Oil, Gas and Mining, is soliciting bids for the Reclamation Construction Sowbelly Gulch Project in Carbon County, Utah, with a focus on closing one abandoned mine in Trash Canyon, maintaining four previously closed mine openings in Spring Canyon, and revegetating disturbed areas at abandoned coal mines. The project, identified by solicitation number JH27-1-1, has a response deadline of August 20, 2026, and all work must be completed by August 31, 2026, with possible extensions for weather-related delays. A mandatory site visit is required, with coordinates provided for the pre-bid meeting, and vendors must attend to be eligible. The contract will be awarded to the lowest responsible and responsive bidder based on the total bid price, considering both lump sum amounts and unit prices for all work items, with award contingent upon reasonableness and alignment with the owner’s interests. The estimated value is $45,000, though no official ceiling is specified. The contractor must furnish all labor, materials, and equipment meeting detailed specifications including mine closure methods such as block wall maintenance, native stone wall construction, backfilling, and concrete or urea silicate foam applications, all governed by General Technical Specifications and site-specific requirements under Section 0300. Payment terms include monthly progress submissions, with 5% of total contract cost withheld as retainage and an additional 40% withheld on mobilization until full completion and acceptance. Payment is strictly for work accepted by the owner, with final acceptance requiring complete operability of all systems. The contractor must provide a 100% performance bond and 100% payment bond, along with $1 million in combined single limit general and automobile liability insurance, and workers’ compensation coverage. Compliance with the Davis-Bacon Act, Build America Buy America Act, and Surface Mining Control and Reclamation Act is mandatory, including eligibility verification through the Applicant/Violator System. The contractor must also certify compliance with federal and state non-discrimination, anti-lobbying, anti-boycott, and E-verify requirements, and agree to indemnify the State of Utah. Liquidated damages of $781 per day apply for delays, and violations may lead to termination with ten days’ notice, or thirty days’ notice if federal funds are withheld. All documentation, including bid schedules, technical specifications, and attachments,
Utah

POSTED

about 18 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 20 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation # Skytop Lodge, Inc., Monroe County
Skytop Lodge, Inc. is seeking bids for the Skytop Lodge Sewage Treatment Plant Improvements Project under Contract 2026-01, with a scheduled bid opening on Friday, September 18, 2026, at 10:00 AM local time via PennBid. The project involves significant upgrades to the existing sewage treatment facility, including the installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, and a UV Disinfection System, along with all associated work detailed in the Contract Documents. Bidding documents are exclusively available through the PennBid website, and all official updates, including addenda, will be posted there; bidders are solely responsible for obtaining current information from this source. A pre-bid conference is scheduled for August 25, 2026, at the site in Canadensis, PA, and while attendance is encouraged, it is not mandatory. All bids must include a bid security of at least 10% of the total bid amount in the form of a certified check or bid bond, and questions regarding the documents must be submitted exclusively through PennBid—telephone inquiries will not be accepted. Bidders are required to comply with state antibid-rigging laws and must submit a non-collusion affidavit with their bid. The project is subject to Act 141 of 2022, mandating the use of E-Verify for all employees performing work, and requires submission of a Public Works Employment Verification Form as a condition for award. The Pennsylvania Prevailing Wage Act applies due to the project’s estimated cost exceeding $25,000. Bids must remain irrevocable for 60 days after opening, extendable to 120 days if award is delayed by external approvals, bond sales, or grant awards. The project is partially funded by a grant from the Commonwealth Financing Authority, and bidders are assured equal opportunity without discrimination on the basis of gender, race, color, creed, sex, age, physical disability, or national origin, with the same protections extended to all workers involved in contract performance.
Monroe County

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details