Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Las Virgenes Creek Restoration Project, One-Time Maintenance of Soft-Bottom Channel, Reach 122 of Las Virgenes Creek

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Los Angeles County Flood Control District

Place of Performance

Agoura Road and Las Virgenes Road, Calabasas, CA, 913002

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Flood Control District
Office AddressN/A

Full Description

Show more
Project Location (Los Angeles County]): This project is located within Reach 122 of Las Virgenes Creek, situated immediately downstream of U.S. Highway 101 and bordered by urban development in the City of Calabasas, Los Angeles County, California (see Project Footprint figure below). This reach lies within the Calabasas U.S. Geological Survey (USGS) 7.5-minute quadrangle map at Township 1 North, Range 17 West, Section 30. Project Description: Maintenance involves the selective removal of vegetation and debris within the channel right-of-way to maintain flow capacity and prevent flooding. Work would be conducted using hand tools only, to avoid impacts to jurisdictional waters or disturbing sensitive habitat. The channel area experienced vegetation growth since its construction which has impeded flows and reduced capacity of the channel. A one-time maintenance cleanup is required to ensure functionality while preserving the ecological integrity of the creek. Public Agency Approving Project: LOS ANGELES COUNTY FLOOD CONTROL DISTRICT Person or Public Agency Carrying Out Project: LOS ANGELES COUNTY FLOOD CONTROL DISTRICT Categorical Exemption. Type – Class 1; California Code of Regulations, Title 14, Section 15301 Reasons why project is exempt: This project is categorically exempt from the provisions of the CEQA pursuant to Sections 15301(b) and 15301(h) of the State CEQA Guidelines, and Classes 1(e) and 1(j) of Los Angeles County’s (the County) Environmental Reporting Procedures Guidelines, Appendix G, as follows: • Section 15301(b) of the State CEQA Guidelines and Class 1(e) of the County’s Environmental Document Reporting Procedures and Guidelines, Appendix G: Routine maintenance of existing public structures. • Section 15301(h) and Class 1(j) of the County’s Environmental Document Reporting Procedures and Guidelines, Appendix G: The work involves minor alterations to native growth in an existing channel structure to support flow capacity. The work necessary involves one-time maintenance activities to the existing channel right-of-way (Reach 122), with no expansion of use or significant alteration to the physical structure of the creek. The activities are minor, involving only hand tools, and are limited to maintaining the flood capacity of an already-engineered stream channel without impacting waters of the U.S. or adjacent wetlands.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

about 24 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS