Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pleasure Cove Marina II Addition Project, Lake Berryessa (Lake or Streambed Alteration Agreement No. EPIMS-NAP-56500-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-NAP-56500-R3 with Berryessa SMI dba Pleasure Cove Marina for the Pleasure Cove Marina II Addition Project at Lake Berryessa. This project involves the installation of a new marina featuring floating boat docks, a floating breakwater structure, covered boat slips, and sanitary pump-out facilities. The infrastructure will be constructed using galvanized steel frames with polyethylene floats and composite decking. Access will be provided via a 400-foot zig-zagging pedestrian ramp designed to maintain an accessible slope. The system will be secured by 108 dead-weight concrete anchors with embedded U-shaped hooks and stainless steel cables, with each anchor occupying a 25-square-foot footprint. The project will result in permanent impacts to the lake, including 3 acres of lake surface, 0.62 acres of lake bottom, and 300 square feet of shoreline. Construction staging will be limited to an existing 0.7-acre paved area. The project was approved on July 29, 2025, following a Mitigated Negative Declaration by the lead agency, the California Regional Water Quality Control Board, Region 5. Compliance with established mitigation measures is a mandatory condition of the approval. The project is located in Napa County near the Wragg Canyon section of Lake Berryessa.

General Info

California approves marina addition at Lake Berryessa with floating docks, breakwater, and ramp using 108 concrete anchors.

Agency

California → Regional Water Quality Control Board, Region 5 - Sacramento

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-NAP-56500-R3 Notice of Determination for Pleasure Cove Marina II Addition Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Sacramento
Office AddressN/A
Contacts
Nicholas MagnusonEnvironmental Scientist
Jenna YangLead Agency Contact

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-NAP-56500-R3), pursuant to Fish and Game Code section 1602, to the Project Applicant, Berryessa SMI dba Pleasure Cove Marina as represented by Amber Garcia. The Project is limited to adding a new marina to Lake Berryessa, including the installation of floating boat docks, floating breakwater structure, cover boat slips, anchors, pedestrian access ramps (i.e., gangways), and sanitary pump-out facilities. The floating dock and boat slip structures will be comprised of a galvanized steel frame with polyethylene floats and composite decking surface that will be accessible from the shore by a pedestrian ramp of consistent construction. The floating breakwater will be installed to dampen wakes and wind-generated waves. The pedestrian ramp will be approximately 400 feet in total length and will zig-zag down to the floating docks to maintain an accessible slope. The ramp will be secured in the ground at key points to maintain stability, but no anchors are required within the lakebed. In total, the floating docks and pedestrian access will occupy approximately 130,000 square feet (3 acres) of the lake surface. The floating docks and breakwater will be anchored to the lake bottom using dead-weight concrete anchors with an embedded U-shaped hook to connect to the floating marina via stainless steel cables. Construction requires 88 anchors for the floating dock and 20 more for the breakwater for a total of 108 anchors. The anchors will be lowered into place onto the lake bottom connected via a cable through the U-shaped hook to the floating structure. Each anchor has a five-foot-by-five-foot footprint, or about 25 square feet each. Four steel spikes will be embedded in each block to keep it from sliding down any submerged embankment. The Project will result in permanent impacts to the lake including 300 square feet of lake shoreline, 2,700 square feet (0.62 acres) of lake bottom, and 130,000 square feet (3 acres) of lake surface. No temporary impacts to the lake will occur. A designated construction staging area will be located within an existing paved area that is approximately 30,000 sf (0.7 acres).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
Federal
Kalispel Tribe Dike Repair- Pend Oreille County, Washington
Solicitation # 12FPC326B0016
The USDA NRCS is soliciting proposals for the repair of the Kalispel Tribe Dike in Pend Oreille County, Washington, under solicitation 12FPC326B0016. This total small business set-aside project has an estimated magnitude between $250,000 and $500,000. The scope of work includes site dewatering, erosion control, excavating and stockpiling dike soil, and the removal and resetting of a 36-inch diameter dike culvert and anti-seep collars. If the existing culvert and collars are found to be unsalvageable, the contractor must install new replacements. Final restoration involves placing nonwoven geotextile and riprap around the culvert outlet, followed by backfilling and compacting the dike to specification. The period of performance is scheduled from October 12, 2026, to November 1, 2027. Bids are due by September 21, 2026, and must be submitted via email with all required signatures and a bid guarantee. Award will be made to the responsible bidder whose proposal is most advantageous to the government, based on price and previous experience with similar projects over the last five years. The project is subject to Davis-Bacon Act prevailing wage rates and requires compliance with NRCS construction and material specifications. All work is subject to government inspection, and the contractor must maintain a rigorous quality control system, submitting inspection records within one working day of completion.
Fpac Bus Cntr-Acq Division

POSTED

about 6 hours ago

DEADLINE

in about 3 hours
View Details
NAICS: 237990
New
SLED
Entrada Way Culvert Slip-out Bank Stabilization ProjectThe County of San Mateo Department of Public Works is implementing the Entrada Way Culvert Slip-out Bank Stabilization Project to repair progressive bank failure along La Honda Creek in the unincorporated community of La Honda, California. The project aims to protect critical infrastructure, including the Entrada Way roadway, stormwater systems, and utility poles, while improving water quality and enhancing riparian habitat. The scope of work involves a biotechnical approach featuring the construction of an engineered log structure cribwall along the lower bank and vegetated soil lifts on the upper slopes. Additional technical requirements include extending the existing culvert headwall by approximately 22 linear feet, realigning the creek thalweg to its original pre-erosional position, realigning a storm drain pipe, and performing minor roadway improvements and site revegetation. The project is subject to comprehensive environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration filed in June 2026. Key regulatory requirements include coordination with Caltrans for transportation permits and ADA compliance, as well as adherence to California Department of Fish and Wildlife regulations regarding the Native Plant Protection Act and Lake and Streambed Alteration. Specific operational mandates include the relocation of aquatic wildlife prior to dewatering, strict concrete washout protocols to prevent stream contamination, and the maintenance of bicycle and pedestrian access throughout construction. The project area encompasses approximately 2.0 acres and is managed by the Natural Resource Manager, Julie Casagrande.
California San Mateo County Department of Public Works

POSTED

about 11 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS